Sec. 135.03. - Permit requirement.

Except as otherwise provided in the Legislative Code, no person may obstruct or excavate any right-of-way without first having obtained the appropriate right-of-way permit from the department to do so. (1) Excavation permit. An excavation permit is required to excavate that part of the right-of-way described in such permit and to hinder free and open passage over the specified portion of the right-of-way by placing equipment described therein, to the extent and for the duration specified therein. (2) Obstruction permit. An obstruction permit is required to hinder free and open passage over the specified portion of right-of-way by placing equipment described therein on the right-of-way for the duration specified therein. No person may excavate or obstruct the right-of-way beyond the date or dates specified in the permit unless (i) such person makes a supplementary application for another right-of-way permit before the expiration of the initial permit, and (ii) a new permit or permit extension is granted. Permits issued under this chapter shall be conspicuously displayed at all times at the indicated work site and shall be available for inspection by department inspectors and authorized city personnel.

(C.F. No. 96-1371, § 1, 12-11-96; C.F. No. 00-268, § 2, 4-19-00)

Ask a question about St. Paul law

Corpus searches the St. Paul sections it holds and shows the ones that match, with their citations. Free, no sign-in.