19.18.010 - Purpose and applicability.

A. Purposes and findings. 1. New development must be served and supported by an adequate network of streets and thoroughfares. 2. Streets and thoroughfares are an essential component of the city's street network and are necessary to accommodate the continuing growth and development of the city. 3. It is necessary and desirable to obtain rights-of-way for off-site, abutting and internal thoroughfares to support new development at the time of platting, rezoning or development of the land. 4. The purpose of the provisions within this chapter are to ensure that both development impacts on off-site and on-site thoroughfare rights-of-way are mitigated through contributions and/or improvements of thoroughfare rights-of-way and that new development does not contribute more than their proportionate share of costs or construction of thoroughfare rights-of-way and only contribute that which is necessary and attributable to their development. 5. It is the city's intent to assure that dedication of thoroughfare and street rights-of-way and their construction requirements are proportional to the traffic demands created by a new development. 6. It is the intent of the city that a road adequacy determination be made concurrent with consideration and approval of rezoning applications and development applications. B. Applicability. 1. A traffic impact analysis (TIA), in adherence to standards contained within this title and City of El Paso approved guidelines, shall be required under the following criteria: a. For all proposed developments within the city limits and within the city's extraterritorial jurisdiction where the development is expected to generate traffic in excess of one thousand average daily trips. b. If a development project will generate more than one hundred peak hour trips. 2. The number of trips generated by the proposed development shall be based on land uses and intensities according to the latest edition of the Institute of Transportation Engineers (ITE) Trip Generation Manual or locally approved trip generation rates. The daily trip generation rate shall be computed based upon the maximum land use intensity allowed under the proposed new zoning. 3. Exceptions. An applicant may request that the city manager or designee waive the requirement for a TIA. The requirement for a TIA may be waived under the following criteria: a. The city manager or designee determine that a TIA is not needed due to traffic analysis or traffic studies already completed; or b. Improvements are already, constructed that will serve and support the new development; or c. Redevelopment of a building that was being used for office, retail, or warehouse use that is proposed to be converted to mixed-use residential development or apartment use as defined in El Paso City Code Title 20.10.363. 4. An applicant may request to the city manager or designee that the submittal of the traffic impact analysis be deferred to the subdivision stage of the development; the request shall be approved provided that the following requirements are met: a. The property proposed for rezoning has not yet been platted; and b. The proposed development generates less than five hundred peak hour trips. 5. Alternative method of calculating traffic impact. a. In lieu of a traffic impact analysis, the developer or applicant may request that the city accept an alternative method of calculating the impact that the new development will have on traffic and thoroughfare rights-of-way. b. Factors to consider in determining whether to accept an alternate method of calculating the traffic impact are: (1) The proposed development generates less than five hundred peak hour trips; and (2) The existing roadway segments within ½-mile radius level of service is an A, B, C, or D, based on the latest version of the Highway Capacity Manual; and (3) Existing intersections within ½-mile radius level of service is an A, B, C, or D based on the latest version of the Highway Capacity Manual; and (4) There are no existing safety problems (sight distance, high crash incidence rate, etc.) (5) Whether the data used in the calculation is no older than one year. c. Upon review and analysis of the data and information provided by the applicant or developer, the city manager or designee may accept the calculation and base any mitigation required or proportionate share or contribution on the calculations submitted by the developer.

(Ord. 16882 § 2 (part), 2008) (Ord. No. 17236, § 27, 11-10-2009; Ord. No. 17251, § 10, 12-15-2009; Ord. No. 17739, § 1, 3-6-2012; Ord. No. 18649, §§ 1, 2, 3-21-2017; Ord. No. 019814, § 1, 11-18-2025)