§ 33.675.300 — Approval Criteria

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.675.300

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/70eac3d7-4333-4230-b159-9eff1772251d

33.675.300 Approval Criteria

A replat will be approved if the review body finds that the applicant has shown that all of the approval criteria have been met: A. Lots. The replatted lots must meet the regulations of Chapters 33.605 through 33.615, with the following exceptions: 1. Lot dimension standards. a. Lots and adjusted lots that do not meet the minimum lot area required for new lots are exempt from the minimum lot area requirement if they do not move further out of conformance with the minimum lot area required for new lots, and they meet the following: (1) No portion of the lot or adjusted lot is in an Environmental, River Environmental, or Pleasant Valley Natural Resources overlay zone; (2) No portion of the lot or adjusted lot is in the combined flood hazard area; and (3) The lot or adjusted lot has an average slope of less than 25 percent; b. Maximum lot area. If any of the lots within the replat site are larger than the maximum lot area allowed, the same number of lots in the replat site are exempt from maximum lot area requirements; c. Minimum lot width. Lots and adjusted lots that do not meet the minimum lot width required for new lots are exempt from the minimum lot width requirement if they do not move further out of conformance with the minimum lot width required for new lots, and they meet the following: (1) No portion of the lot or adjusted lot is in an Environmental, River Environmental, or Pleasant Valley Natural Resources overlay zone; (2) No portion of the lot or adjusted lot is in the combined flood hazard area; and (3) The lot or adjusted lot has an average slope of less than 25 percent; 2. Maximum density. If the replat does not move the site further out of conformance with maximum density requirements, the replat does not have to meet maximum density requirements; 3. Lots without street frontage. If the replat consolidates lots that do not have street frontage with lots that have street frontage, the replat does not have to meet minimum density and maximum lot area requirements; 4. Through lots. If any of the existing lots within the replat site are through lots with at least one front lot line abutting an arterial street, then the consolidated or reconfigured lots may be through lots; 5. Split zoning. If any of the existing lots within the replat site are in more than one base zone, then the consolidated or reconfigured lot may be in more than one base zone. B. Development standards. If existing development is in conformance with the development standards of this Title, the development must remain in conformance after the replat. If existing development is not in conformance with a development standard of this title, the replat will not cause the development to move further out of conformance with the standard unless an adjustment is approved. C. Conditions of land division approvals. The replat must meet one of the following: 1. All conditions of previous land division approvals continue to be met or remain in effect; or 2. The conditions of approval no longer apply to the site, or to development on the site, if the lots are reconfigured. D. Conditions of other land use approvals. Conditions of other land use approvals continue to apply, and must be met. E. Services. The replat does not eliminate the availability of services to the lots, and the reconfigured lots are not out of conformance with service bureau requirements for water, sanitary sewage disposal, and stormwater management.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.