For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37-0403 — Violations

Fargo Municipal Code, Fargo, North Dakota (Supp. No. 14, Update 5: codified through Ordinance No. 5555, adopted August 17, 2026) · Fargo Municipal Code § 37-0403

Corpus is an independent public-information project, not the official City of Fargo website. Stable reference: corpuslaw.us/code/710e3051-2b28-4125-8169-f49f43d8d3a7

37-0403. - Violations.

All of the following represent violations of this chapter and of law and will be subject to the remedies and penalties provided in this article, the Fargo Municipal Code and state law, where applicable. The city includes the extraterritorial zoning jurisdiction of the city as provided in Section 37-0104. A. Land disturbing activity without required permit or approval. No person shall initiate within the city any land development activity, land disturbing activity, or other activity resulting in an increase in storm water quantities, degradation of storm water quality, or restriction of flow in any storm sewer system, open ditch or natural channel, storm water easement, water body, or wetland outlet, without having first complied with the terms of this chapter. B. Authorities inconsistent with requirements. No person shall engage in land disturbing activities on an owner's land in contravention of the plans set forth in an approved SWPPP, an erosion and sediment control permit, any conditions for such plan or permit, any provision of this chapter or any other term, condition, or qualification imposed by city engineer, or other decision-making body, imposed or stated as part of a permit, certificate, or other form of authorization. This section applies to all persons including owners, their contractors and any utility companies or their contractors engaging in land disturbing activities. C. Permanent facilities inconsistent with requirements. It is a violation of this article to erect, construct, reconstruct, remodel, alter, maintain, move, or use any permanent storm water management or control facility in violation or contravention of this chapter or of an approved plan as provided in this chapter. D. No person shall cause a prohibited discharge within the city. E. The owner shall cause to be removed sediments transported or tracked from owner's land onto city streets by vehicles or construction traffic before the end of the each work day and failure to do so shall be a violation of this chapter. F. As to construction activities on owner's land, the owner shall comply with the requirements of the erosion and sediment control permit, and with the following, and failure to do so shall be a violation of this chapter: 1. Site dewatering. Water pumped from the site shall be treated by temporary sedimentation basins, grit chambers, sand filters, upflow chambers, hydro-cyclones, soil concentrators, sediment bags or other appropriate controls as approved by the city engineer. Water may not be discharged in a manner that causes erosion, sedimentation, or flooding on the site, on downstream properties, in the receiving channels, or in any wetland. 2. Waste and material disposal. All waste and unused building materials (including garbage, debris, cleaning wastes, wastewater, petroleum based products, paints, concrete or concrete wash water, toxic materials, or other hazardous materials) shall be properly disposed of off-site and shall not be allowed to be carried by runoff into a receiving channel, storm sewer system, or wetland. 3. Tracking management. The use of clay or other cohesive soils to construct access roads or ramps over curbs or onto paved streets shall not be allowed. 4. Water quality protection. The construction contractor, including the general contractor and all subcontractors, shall be required to control oil and fuel spills and chemical discharges to prevent such spills or discharges from entering any watercourse, sump, sewer system, water body, or wetland. H. One or two dwelling unit building. Construction of a one or two dwelling unit building must comply with in-place BMPs and any existing permitted SWPPP for the subdivision, including NPDES permit requirements and failure to do so shall be a violation of this chapter. I. Utility service lines. Utility companies or contractors working in a street right-of-way to repair existing or install new utilities that involve land disturbing activities shall obtain an excavation permit from the city engineer, in accordance with Chapter 18 of the Fargo Municipal Code. With respect to utility companies that are working in a street right-of-way and are engaging in land disturbing activities, in addition to the requirements of Chapter 18, including the obligation of obtaining an excavation permit, the excavation permittee shall implement storm water protection measures and utilize construction methods to minimize the potential for sediment or other contaminants to enter the city's storm sewer system. The utility company or contractor shall provide street sweeping as necessary to prevent sediments from their activities from entering the storm sewer system. All sediments or other materials shall be removed from the site within one working day of completion of utility installation on the site. All disturbed vegetation shall be replaced with seed or sod within seven (7) days of completion of utility installation on the site or other appropriate means of erosion and sediment control shall be implemented and maintained until the restoration is complete. All seeded or sodded areas shall be maintained by the utility company or contractor until vegetation is established except in the case of a utility repair for a private residence. For utility repairs to private residences the homeowner shall be responsible for the maintenance of vegetation until it is established. The contractor shall provide the homeowner with a "Sediment and Erosion Control for New Homeowners" fact sheet from the ND State Health Department. The city will make available guidelines for acceptable temporary protection BMPs until the requirements for final stabilization are met. J. Illicit connections. Storm water systems are designed to carry uncontaminated storm water. Legal connection to the city's storm water system includes sump pumps lawfully connected to the storm sewer system under chapter 17, and uncontaminated storm water conveyances (such as roof drains). All other connections shall be considered illicit connections and therefore constitute a prohibited discharge and a violation of this chapter. K. Illicit dumping. The dumping or disposal of debris materials such as grass clippings, vegetative materials, tree branches, stumps, earth fill, rocks, concrete chunks, metal, other demolition or construction materials, or structures, any chemicals, or other materials that could degrade the quality of waters within the system by dumping in a manner that allows them to come into contact with storm water is prohibited. It is a violation of this chapter to allow such a discharge to occur.

Source: 4510 (2006).

Ask a question about Fargo law

Corpus searches the Fargo sections it holds and shows the ones that match, with their citations. Free, no sign-in.