§ 52.60 — Scope
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 52.60
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/72132d85-f32a-458c-a499-632ebe35c5b0
52.60. - Scope.
Chapter 52 controls land disturbances, soil storage, erosion and sedimentation, and drainage not meeting standards established in section 52.140, and establishes procedures for issuance, approval, administration, and enforcement of a permit. (1) Owners of construction sites are required, under rules contained in the Minnesota Pollution Control Agency's (MPCA) General Permit to Discharge Stormwater Associated with Construction Activity (General Stormwater Permit), to obtain coverage through the MPCA under that permit for construction activity that results in land disturbance of equal to or greater than one (1) acre or if a project is part of a common plan of development or sale that ultimately will disturb greater than one (1) acre. (2) Under its Phase I Municipal Separate Storm Sewer System (MS4) National Pollution Discharge Elimination System permit, the City of Minneapolis is required to regulate, treat, and control stormwater discharges within the City of Minneapolis. (3) The General Stormwater Permit is hereby adopted and by reference made part of this section as if fully set forth herein. Any act these documents require or prohibit, are required, or prohibited by this section. Any future amendments, revisions, or modifications to these documents, incorporated herein, are intended to be made a part of this section.
(Ord. No. 2024-031, § 1, 9-5-24)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
