For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 129.0108 — Issuance of a Construction Permit

San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 129.0108

Corpus is an independent public-information project, not the official City of San Diego website. Stable reference: corpuslaw.us/code/72b2e435-bd36-4e53-8009-f056835d87ac

§129.0108 Issuance of a Construction Permit

Construction shall not begin until the required permits have been issued. After all required approvals, including any required development permits, have been obtained and all required fees have been paid, the Building Official or City Engineer may issue a construction permit as follows: (a) The Building Official may issue Building Permits, Electrical Permits, Plumbing/Mechanical Permits, Demolition/Removal Permits, Grading Permits on private lots if the Grading Permit does not include public rights-of-way, and Fire Permits. (b) The City Engineer may issue all other Grading Permits and Public Right-of-Way Permits.

(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 8-5-2024 by O-21859 N.S.; effective 9-4-2024.)

Ask a question about San Diego law

Corpus searches the San Diego sections it holds and shows the ones that match, with their citations. Free, no sign-in.