Extensions or improvements provided by applicant.
Tampa City Code § 26-124
in effectSec. 26-124. - Extensions or improvements provided by applicant.
(a) If the conditional commitment requires the applicant to provide the necessary extensions or improvements to serve his project, the applicant shall be responsible for design, construction and inspection in accordance with all applicable federal, state, or other local laws, rules and regulations, sound engineering and industry standards.
(b) The applicant is responsible for retaining an engineer to prepare the design of the improvements. The construction drawings shall be signed and sealed by an engineer currently registered in the state and are to be submitted to the department for review and approval. Construction of the sewer improvements or extensions shall not commence until the engineer's construction drawings have been approved by the department. Following approval of the construction drawings, the applicant may proceed with arranging for the installation of the improvements. The applicant is responsible for retaining a utility contractor who is licensed to perform the installation. If the improvements or extensions are to be constructed in public rights-of-way or approved easements, the applicant and/or his engineer or contractor shall be responsible for securing all permits from all regulatory agencies having jurisdiction over the construction.
(c) The applicant and/or his contractor in undertaking the construction shall have sufficient liability insurance coverage to protect the public, and shall hold the city and department harmless from any claim against personal injury or property damage which is caused by the contractor throughout the duration of the construction, until such time as the improvements or extensions pass inspection by department personnel and are accepted by the department.
(d) The applicant is responsible for retaining an engineer to supervise the construction and to furnish as-built drawings to the department following completion of construction. The department has authorization to withhold approval of a certificate of occupancy for the applicant's project if the improvements have not been completed to the department's standards and specifications and/or the as-builts have not been submitted and approved.
(e) All improvements or extensions to be owned and maintained by the city shall be constructed in the public rights-of-way or approved easements. The city shall only accept operation and maintenance of applicant installed facilities upon complete compliance of all department requirements. Acceptance of facilities shall be at no cost to the city and shall be acknowledged by the department in writing to the applicant. In accepting the improvements, the applicant-owner shall guarantee the improvements against any defects in workmanship and materials for a period of one (1) year following the date of the acceptance. The department has authorization to withhold approval of a certificate of occupancy for the applicant's project and/or terminate the service commitment if the applicant fails to meet the department's requirements for completing the sewer improvements.
(f) All sewer facilities constructed on private property shall be owned and maintained by the property owner. It is the owner's responsibility to ensure privately owned sewer facilities comply with all federal, state, and local regulatory requirements.
(Ord. No. 89-253, § 2(58-130), 9-28-89; Ord. No. 2013-5, § 1, 1-10-2013; Ord. No. 2020-1, § 8, 1-9-2020)
Source: City of Tampa, Code of Ordinances and Charter and Related Laws (Municode Library, library.municode.com)URL: https://library.municode.com/fl/tampa/codes/code_of_ordinances?nodeId=COOR_CH26UT_ARTIIIWADE_S26-124EXIMPRAPFetched: 10/28/2026