For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-31 — Fee schedule; determination of cost of work; connection to public sewer

Code of Ordinances, City of Winston-Salem, North Carolina (Supp. No. 103: codified through Ordinance No. 26-0283, enacted June 22, 2026) · Winston-Salem Code of Ordinances § 10-31

Corpus is an independent public-information project, not the official City of Winston-Salem website. Stable reference: corpuslaw.us/code/73c67416-d39d-47f1-8211-42801fbb4f25

Sec. 10-31. - Fee schedule; determination of cost of work; connection to public sewer.

(a) Fee schedule. (1) Nonresidential construction.** For all nonresidential construction, alterations, remodels, repairs, demolitions or expenditures for improvements on existing nonresidential buildings, other than painting, the superintendent of inspections shall charge for each and every building on which permits are granted the following fees for inspections, based on the value of the work: Value | Fee $0.00 through $5,000.00 | $100.00 $5,000.01 through $50,000.00 | $100.00 Plus, for each $1,000.00 of value or fraction thereof over $5,000.00 | 4.00 $50,000.01 through $100,000.00 | 232.00 Plus, for each $1,000.00 of value or fraction thereof over $50,000.00 | 3.00 $100,000.01 through $500,000.00 | 388.00 Plus, for each $1,000.00 of value or fraction thereof over $100,000.00 | 2.60 $500,000.01 and above | 1,425.00 Plus, for each $1,000.00 of value or fraction thereof over $500,000.00 | 2.40 Inspection of day care/adult day care/family group home facility | 150.00 Inspection of existing commercial building or tenant space | 250.00 Manufactured home permit | 100.00 Modular home permit | 100.00 Temporary certificates of occupancy (TCO) | 50.00 Plus, per unfinished trade | 35.00 Foundation only permits (added to cost of permit) | 225.00 Parking lot permit (stand alone permit) | 150.00 (2) New residential construction. The following fees shall be charged for permits on new construction/additions of residential dwelling units, including single-family dwellings, townhouses, condominiums, duplexes and apartment buildings. Fees for new construction/additions of single family/duplex units are based on gross square footage of building. Fees for townhouses, condominiums, twin home, urban home and apartments are calculated per unit: Building ** | Electrical * | Plumbing | Mechanical electrical | Mechanical fossil fuel | Gas appliances as separate permit Single-family residential (per sq. ft.) | $0.15 | $0.09 | $0.09 | $0.09 | $0.09 | $100.00 Single-family additions (per sq. ft.) -$100.00 min. bldg. -$75.00 min. | 0.15 | 0.09 | 0.09 | 0.09 | 0.09 | 100.00 Townhouse, condo, twin home, urban home per unit: | 206.00 | 138.00 | 162.00 | 86.00 | 100.00 | 100.00 Duplex: (per unit) | 0.15 | 0.09 | 0.09 | 0.09 | 0.09 | 100.00 Apartment First unit: | 206.00 | 90.00 | 71.00 | 98.00 | 100.00 | 100.00 Each additional unit in building: | 53.00 | 55.00 | 41.00 | 23.00 | 32.00 | 12.00 * Does not include temporary saw service. (3) Existing residential construction. The following fees shall be charged for permits on existing residential construction for alterations, remodels, repairs, demolitions, and improvements to existing single family residential structures. Building ** | Electrical * | Plumbing | Mechanical | Gas fireplaces Single-family | $0.08 | $0.05 | $0.05 | $0.05 | $100.00 Alt./repairs $100.00 min. Bldg. — $75.00 min ** In addition to the above fees, a homeowner's recovery fund fee is collected in accordance with G.S. 87-15.6 for all single family dwelling permits issued to state licensed contractor. (b) Permit fee based on total cost. Upon application to the inspections director for a building permit for new nonresidential construction and nonresidential additions, the permit applicant shall pay a building permit fee based on the actual cost of construction, which shall be a cost not less than 66 percent of the square foot value for the type of construction and occupancy obtained from the most recent "Building Valuation Data" table for North Carolina published by the International Code Council Inc. Building permit fees for new residential construction and existing residential construction shall be as given in subsection 10-31(a)(2). (c) Certificate of occupancy. Upon completion of construction costing $1,000.00 or more, a certificate of occupancy shall be issued. The inspections director shall not give approval for the permanent connection of electrical power to any structure to which this paragraph is applicable until the foregoing provisions have been complied with. (d) Connection to public sewer. Upon application to the inspections director for a building permit for the construction of a building on property within the corporate limits of the city which is not served by the city sewer system, the applicant shall be required to file a petition or letter with the city requesting that a public sewer connection be made available to the property. The petition or letter shall be submitted promptly to the department of public works for processing and reporting to the city council and the building permit applied for shall not be issued until action has been taken by the city council approving or rejecting the request for a sewer connection. However, the inspections director may proceed with the issuance of a building permit if it appears that there will be a delay in the construction of necessary public sewer facilities and the owner, desiring to proceed with construction immediately and to install a septic tank for temporary use, signs and files with the inspections director a statement agreeing to connect to the public sewer system as soon as a connection is made available to his property and acknowledging that he understands that his property will be assessed in connection with the sewer extension project required to make sewer service available to his property. (e) Fee for extra inspections. The fees shown for specific items shall entitle the permit holder to the appropriate number of inspection trips for the installation of those work items, and for one additional inspection trip per permit for reinspection of corrected work or disapproved work. For inspection trips required in excess of the one additional trip, a $50.00 fee for a second trip, $75.00 fee for a third trip, and $100.00 fee for a fourth and all following trips shall be imposed. (f) Plan review fee required. Upon application to the inspections director for any proposed construction project for which a plans review is conducted prior to the issuance of a permit, a non-refundable plans review fee shall be paid at the time the permit application is submitted according to the following schedule: Type of project | Fee Nonresidential, less than 4,000 square feet | $100.00 Nonresidential, 4,000 to 15,000 square feet | 125.00 Nonresidential, 15,001 to 40,000 square feet | 325.00 Nonresidential, 40,001 square feet and greater | 800.00 Condo/apartment projects | 500.00 Townhomes (per unit) | 100.00 Cell towers/co-locates | 100.00 Code item point reviews, such as exterior lighting, magnetic locks, columbarium's, signs, etc. | 100.00 Parking Lots | 100.00 (g) Fee for after-hours inspections. In addition to all other applicable permit and inspection fees, upon a request of the permit holder for any non-emergency inspection that is to be performed other than during the inspections division's regular business hours, such inspection shall be subject to the following fees: (1) For the first two hours, or part thereof—$200.00 per inspector. (2) For each hour, or part thereof, beyond the initial two hours—$100.00 per inspector. Any such non-emergency after-hours inspection request is subject to approval by the inspections director based upon inspector availability. Nothing herein shall require or obligate the inspections division to perform inspections at any time other than during its regular business hours.

(Code 1975, § 4-2.1; Ord. No. 4224, §§ 1, 2, 6-17-96; Ord. No. 4307, § 1, 11-16-98; Ord. No. 4329, § 1, 6-8-99; Ord. No. 4401, §§ 1, 2, 9-17-01; Ord. of 1-6-03, § 1; Ord. No. 4453, §§ 1, 3—6, 5-19-03; Ord. No. 4497, §§ 2—4, 6-22-04; Ord. No. 4661, § 2, 7-20-09; Ord. No. 4687, § 1, 6-21-10; Ord. No. 4793, §§ 2—4, 6-17-13; Ord. No. 4801, §§ 2, 3, 9-16-13; Ord. No. 4838, §§ 1, 2, 6-15-15; Ord. No. 4868, § 1, 6-20-16; Ord. No. 4869, § 1, 6-20-16; Ord. No. 24-0369, § 2, 6-17-24)

Ask a question about Winston-Salem law

Corpus searches the Winston-Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.