CONSTRUCTION, EXCAVATION, AND REPAIR

Miami City Code ch. 54, art. II
in effect

Miami City Code § 54-41 Lines and grades for sidewalk, curb, etc., construction.

Miami City Code § 54-42 Permit required for disturbing, cutting into, digging up, drilling, boring under, or excavating any public street, swale, or sidewalk; cost of restoration; obstruction of right-of-way.

Miami City Code § 54-43 Permit fees for right-of-way or street excavation, sidewalk repair, paving or resurfacing of roadway, parkway or shoulder area, building line and grade survey, sidewalk construction survey, driveway construction, utility placement; underground utility service connection excavation, groundwater monitoring wells; permit renewal; after-the-fact permit, and inspection/reinspection fees; waiver of fees.

Miami City Code § 54-44 Material for sidewalk construction.

Miami City Code § 54-45 Type and specifications for street paving.

Miami City Code § 54-46 Agreement and bond as to right-of-way and subdivision improvements by persons submitting plats, replats, etc., to commission.

Miami City Code § 54-47 Approval of location and construction of driveways, etc.

Miami City Code § 54-48 Inspection of work.

Miami City Code § 54-49 Obstructing street with materials.

Miami City Code § 54-50 Reports of approval.

Miami City Code § 54-51 Grades for street utilities, trees, etc.

Miami City Code § 54-52 Sewers, conduits, etc., to be laid before city paves street.

Miami City Code § 54-53 Closing of streets during progress of work.

Miami City Code § 54-54 Allowing sidewalks, swales and curbs to remain in dangerous condition.

Miami City Code § 54-55 Notice to repair sidewalks, driving lanes, parking lanes, swales and curbs.

Miami City Code § 54-56 Construction, reconstruction or repair of street improvements required when adjacent property is improved by construction of $100,000.00 or more in value or exceeding 1,000 square feet in floor area; restriction.

Miami City Code § 54-57 Obstructing streets or sidewalks with trash, lumber, etc.

Miami City Code § 54-58 Right-of-way dedication required prior to issuance of permits.

Miami City Code § 54-59 Enhanced right-of-way improvement trust fund—Intent.

Miami City Code § 54-60 Established.

Miami City Code § 54-61 Trust fund payments.

Miami City Code § 54-62 Financial report.

Miami City Code § 54-63 Recovery agreement for construction of master planned street.

Source: City of Miami, Florida, City Code, City Charter, Special Acts and Related General Laws (Municode Library, library.municode.com)URL: https://library.municode.com/fl/miami/codes/code_of_ordinances?nodeId=PTIITHCO_CH54STSI_ARTIICOEXREFetched: 11/1/2026