11.34.100 - Asbestos.
A. Asbestos definitions. For purposes of this chapter the following words and definitions shall apply:
1. "Adequately wet." Sufficiently mix or penetrate with liquid to prevent the release of particles. If visible emissions are observed coming from asbestos-containing material, then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wet.
2. "Air Pollution Control (APC)." Air Pollution Control of the City of St. Louis Department of Health.
3. "Air sampling personnel." No one employed by an owner or operator of a demolition or renovation activity, or person, partnership, or corporation performing or managing the demolition, construction, reconstruction, alteration, or occupancy on or at the site, or by or with a person, partnership, or corporation that shares a same, in whole or in party, ownership or control group will be considered air sampling personnel.
a. "Asbestos air sampling professional." An individual who by qualifications and experience is proficient in asbestos abatement air monitoring. The individual shall conduct, oversee, or be responsible for air monitoring of asbestos projects before, during and after the project has been completed, and is certified in accordance with 10 CSR 10-6.250. An asbestos air sampling professional is an individual with a current certificate of successful completion of the NIOSH course #582e "Sampling and Evaluating Airborne Asbestos Dust" or a course equivalent in length and content together with one (1) of the following; a) a Bachelor's Degree in the life, environmental or physical sciences or in engineering and written verification of five hundred twenty (520) hours on-site experience in general indoor air pollution sampling; or b) written verification of two thousand eighty (2080) hours on-site experience in air sampling for asbestos on abatement projects under the supervision of a licensed air sampling professional.
b. "Asbestos air sampling technician." An individual who has been trained by an air sampling professional, and certified in accordance with 10 CSR 10-6.250, to perform air monitoring. That certification in the City of St. Louis requires that the individual must have evidence of working under an air sampling professional in the field for at least forty (40) hours and, if analyzing air samples, have successfully completed a NIOSH 582e course. The air sampling technician may conduct air monitoring of an asbestos project before, during and after the asbestos project has been completed.
4. "Asbestos." The asbestiform varieties of chrysotile, crocidolite, amosite, anthophyllite, tremolite and actinolite.
5. "Asbestos abatement." The encapsulation, enclosure or removal of asbestos-containing materials, in or from a building, or air contaminant source; or preparation of regulated asbestos-containing material prior to demolition.
6. "Asbestos abatement contractor." Any person, registered with the Missouri Department of Natural Resources (MODNR), who by agreement, contractual or otherwise, conducts asbestos abatement projects or asbestos projects at a location other than his/her own place of business. An asbestos abatement contractor and contractor's personnel must have current applicable certifications and licenses including OSHA ten-hour construction standard training, Asbestos Hazard Emergency Response Act (AHERA), Asbestos School Hazard Abatement Reauthorization Act (ASHARA).
7. "Asbestos abatement project." An activity undertaken to encapsulate, enclose, or remove ten (10) square feet and/or sixteen (16) linear feet and/or three (3) cubic feet or more of regulated asbestos containing materials from buildings, structures, and other air contaminant sources containing ten (10) square feet and/or sixteen (16) linear feet and/or three (3) cubic feet or more.
8. "Asbestos abatement supervisor." An individual, certified by MODNR, who directs, controls or supervises others in asbestos abatement projects and asbestos projects.
9. "Asbestos-containing material (ACM)." Any material or product which contains more than one (1) percent asbestos in accordance with 40 CFR 9 61.141.
10. "Asbestos project." An activity undertaken to remove, enclose, or encapsulate at least one hundred sixty (160) square feet, two hundred sixty (260) linear feet, or thirty-five (35) cubic feet or more of regulated asbestos containing materials (RACM) from buildings, structures, and other air contaminant sources, or to demolish buildings, structures, and other air contaminant sources containing the previously mentioned quantities of asbestos-containing materials.
11. "Asbestos removal project." An asbestos abatement project consisting of activities that involve, and are required, to take out regulated asbestos-containing materials from any facility. This definition includes, but is not limited to, activities associated with the cleanup of loose friable asbestos-containing debris or refuse, or both, from floors and other surfaces.
12. "Building." Any structure excluding single-family, owner-occupied dwellings, and vacant public or privately-owned residential structures of four (4) dwelling units or less being demolished for the sole purpose of public health, safety, or welfare. Excluded structures must be geographically dispersed, demolished pursuant to a public safety determination, and must pose a threat to public safety.
13. "Category I non-friable asbestos-containing material (ACM)." Asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than one (1) percent asbestos in accordance with 40 CFR 61.141.
14. "Category II non-friable ACM." Any material, excluding Category l non-friable ACM, containing more than one (1) percent asbestos, in accordance with 40 CFR 61.141, that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
15. "Commercial or public project." The demolition of one or more houses as part of an urban renewal project, a highway construction project, or a project to develop a shopping mall, industrial facility, or other private development.
16. "Containment." The area where an asbestos abatement project or asbestos project is conducted. The area must be enclosed either by a glove bag or plastic sheeting barriers.
17. "Demolition." The wrecking, razing, intentional burning or removing of any load-supporting structural member or portion of a structure together with any related handling operation.
18. "Emergency asbestos abatement project." An asbestos abatement project or asbestos project that must be undertaken immediately to prevent imminent severe human exposure or to restore essential facility operation.
19. "Facility." Any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding individual residential buildings having four (4) or fewer dwelling units that do not meet the requirement of an installation and are not part of a commercial or public project); any ship; and any active or inactive waste disposal site. For purposes of this definition, any building, structure, or installation that contains a loft used as a dwelling is not considered a residential structure, installation, or building. Any structure, installation or building that was previously subject to this Section is not excluded, regardless of its current use or function.
20. "Friable ACM." Any material containing more than one (1) percent asbestos in accordance with 40 CFR 61.141, that when dry can be crumbled, pulverized, or reduced to powder by hand pressure.
21. "Glove bag." A manufactured or fabricated device, typically constructed of six (6) mil transparent polyethylene or polyvinyl chloride plastic. This device consists of two (2) inward projecting long sleeves, an internal tool pouch and an attached, labeled receptacle for asbestos waste. The bags are especially designed to contain sections of pipe for the purpose of removing a short length of damaged asbestos containing material without releasing fibers into the air.
22. "Installation." Any building or structure or multiple (more than one (1)) buildings or structures at a single demolition or renovation site under the control of the same owner or operator (or owner or operator under common control) that is demolished or renovated within a twelve-month period.
23. "Inspector." An individual, certified by MODNR, under the U.S. Asbestos Hazard Emergency Response Act (AHERA), who collects and assimilates information used to determine whether asbestos-containing material is present in a building or other air contaminant sources.
24. "Leak-tight." Solids or liquids cannot escape or spill out. It also means dust-tight.
25. "MODNR." Missouri Department of Natural Resources.
26. "Non-friable ACM." Any material containing more than one (1) percent asbestos in accordance with 40 CFR 61.141, that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
27. "Owner or operator of a demolition or renovation activity." Any person, who owns, leases, operates, controls, or supervises a facility, structure, building, or installation being demolished or renovated, or any person who owns, leases, operates, controls, or supervises a demolition or renovation operation, or both.
28. "Regulated asbestos-containing material (RACM)." (a) friable asbestos containing material; (b) category I non-friable ACM that has become friable; (c) category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by this rule.
29. "Renovation." Altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.
30. "Site." A site is generally expected to be a city block.
31. "Structure." Any built element, including single-family, owner-occupied dwellings, and vacant public or privately-owned residential structures of four (4) or fewer dwelling units.
B. Application. This rule shall apply to:
1. All persons that authorize, design, conduct and work in asbestos abatement projects, asbestos projects, and asbestos removal projects;
2. All persons (other than City employees) that monitor airborne asbestos or dispose of asbestos waste as a result of asbestos abatement projects;
3. All persons who inspect buildings to determine the presence or absence of ACM;
4. All owners or operators of a demolition or renovation activity; and
5. Business entities that qualify for exemption status under 10 CSR 10-6.250 are not subject to the notification requirements for asbestos abatement projects of a size less than one hundred sixty (160) square feet, two hundred sixty (260) linear feet, or thirty-five (35) cubic feet. These business entities are exempt from post-notification requirements, but shall keep records of waste disposal for department inspection.
C. Asbestos Abatement Procedures and Practices.
1. All asbestos abatement contractors prior to engaging in asbestos abatement projects, asbestos projects, and asbestos removal projects shall:
a. Use only those individuals that are certified or trained in accordance with sections 10 CSR 643.250 of the Revised Statutes of Missouri, and
b. Comply with Asbestos, United States Environmental Protection Agency National Emission Standards for Hazardous Air Pollutants (NESHAP) 40 CFR Part 61; Asbestos Hazard Emergency Response Act (AHERA) 40 CFR Part 763; the standards for worker protection promulgated by the United States Occupational Safety and Health Administration (OSHA) at 29 CFR 1910.1001, 1910.1200, 1926.58; the provisions of RSMo 643.40 to 643.250; the ordinances of the City; and rules and regulations and orders of the Commissioner of Health and/or his or her designee by and for the implementation of this chapter.
c. Any asbestos abatement contractor performing work on a project with a total budget of one hundred twenty-five thousand dollars ($125,000.00) or more must participate in a U.S. Department of Labor registered apprentice program compliant with 29 CFR Part 29 and 29 USC Section 50 that yearly graduates registered apprentices and teaches practices and safety techniques used in asbestos abatement. This requirement does not apply to an excepted "building" or "facility" excluded from those terms' definitions above.
2. At each asbestos abatement project, asbestos project, and asbestos removal project site, the person shall provide the following information for inspection by APC, which shall be current and on record with the Commissioner of Health in a manner prominently accessible and searchable on the Commissioner of Health's website:
a. Proof of current MODNR registration;
b. Proof of current MODNR occupational certification for those individuals on the project;
c. Most recent available air sampling results;
d. Current photo identification for all applicable individuals engaged in the project; and
e. Proof of passage of the training course for the air sampling technicians and photo identifications for air sampling technicians.
D. Notification Requirements.
1. Any person undertaking a demolition project, asbestos abatement project, asbestos project, or asbestos removal project shall submit a notification to APC for review by web portal, in person, by email, or by fax at least ten (10) working days prior to the start of the project.
a. Business entities with MODNR -approved exemption status are exempt from notification except for those projects for which notification is required by the EPA's NESHAP.
b. APC may waive the ten (10) working day review period upon request for good cause. To apply for this waiver, the person shall complete the appropriate sections of the notification form provided by APC. The person who applies for the ten (10) working day waiver must obtain approval from APC before the project can begin.
2. The person shall submit the notification form provided by APC.
3. If an amendment to the notification is necessary, the person shall notify APC immediately by web portal, telephone, email, or fax. APC must receive the written amendment within five (5) working days following the verbal or fax agreement.
4. All notifications shall state actual dates and times of the project, the on-site asbestos abatement supervisor and a description of work practices. If the person must revise the dates and times of the project, the person shall notify the APC office at least twenty-four (24) hours in advance of the change by web portal, telephone, email, or fax and then immediately follow-up with a written amendment stating the change. APC must receive the written amendment for changes in dates and times of the project within two (2) working days of the phone or fax message.
5. An inspector shall thoroughly inspect the structure, building, or facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II non-friable ACM. This includes garages and add-on structures.
6. A representative number of samples must be taken of all suspect ACM before an inspector can report "no ACM present". All sampling should be done in accordance with AHERA requirements and be marked on a facility diagram for the purpose of duplicating the sample testing if necessary. All suspect materials shall be tested. The number of samples may be increased at the APC's direction in the APC's sole discretion. If the facility contains no RACM or the facility contains RACM, but in an amount less than ten (10) square feet and/or sixteen (16) linear feet and/or three (3) cubic feet, a demolition/renovation notification form must be submitted to APC along with the Building Division demolition permit application ten (10) working days prior to demolition. APC will approve the demolition after verification and approval of its findings in writing and certified under penalty of perjury.
7. A complete inspection report, including samples and results, must be submitted to APC.
a. If the inspection determines that there are amounts of RACM in excess of ten (10) square feet and/or sixteen (16) linear feet and/or three (3) cubic feet, but less than one hundred sixty (160) square feet, two hundred sixty (260) linear feet, and/or thirty-five (35) cubic feet, an asbestos abatement contractor must submit a notification to APC ten (10) working days prior to the date asbestos abatement activity is scheduled to begin, and if the asbestos abatement project is associated with a demolition activity the applicable notification fee must accompany the notification.
b. If the inspection determines that there are amounts of RACM equal to or in excess of one hundred sixty (160) square feet, two hundred sixty (260) linear feet, and/or thirty-five (35) cubic feet, an asbestos abatement contractor must submit a notification to APC, along with the applicable notification fee, ten (10) working days prior to the date asbestos project activity is scheduled to begin.
c. Work practices and procedures must be fully described, including but not limited to the methods of removal and containment.
d. Asbestos abatement contractors shall not begin any asbestos abatement project, asbestos project, or asbestos removal project activity without a notice of receipt letter from APC. When notification is approved, the asbestos abatement contractor must remove all RACM from the facility in accordance with the notification and asbestos rules and regulations.
e. If the structure will be demolished following an asbestos abatement project, asbestos project, or asbestos removal project, a completion letter or post-notification must be submitted to APC prior to receiving a demolition sign-off from APC. (A COMPLETION LETTER IS NOT A POST-NOTIFICATION). A post-notification must still be submitted within sixty (60) days of project completion.
8. If the facilities meet the definition of an installation and/or a commercial or public project, and the project is not followed by a planned demolition, notifications may be submitted in groups by city block when the structures combined contain RACM equal to or in excess of one hundred sixty (160) square feet, two hundred sixty (260) linear feet, and/or thirty-five (35) cubic feet. Any single structure that has RACM equal to or in excess of one hundred sixty (160) square feet, two hundred sixty (260) linear feet and/or thirty-five (35) cubic feet shall be notified separately.
9. Only a certified asbestos inspector can deem a structure unsafe to enter. If it is unsafe to inspect prior to demolition, and the facility's regulated asbestos content cannot be determined, the presence of asbestos must be assumed unless sampling proves to be negative. If the asbestos abatement contractor wants to segregate ACM from general debris, an asbestos inspector must be on site until the structure has been made safe enough to conduct a thorough inspection. An asbestos abatement supervisor must be on site during the demolition and proof of hire must be submitted with the demolition notification.
10. If the facility is being demolished under an order of a state or local government agency, issued because the facility is structurally unsound and in danger of imminent collapse, a notification shall be submitted to APC as early as possible before, but not later than the following work day after demolition has begun. The name, title, and authority of the state or local government representative who has ordered the demolition, the date that the order was issued, and the date on which the demolition was ordered to begin shall be attached to the notification. APC will sign-off on the demolition notification when all notification requirements have been satisfied. An inspector must be on site during the demolition to observe for suspect materials that were not accessible in collapsed or unsafe buildings. An asbestos abatement supervisor must be on site at all times and proof of hire must be submitted with notification. Destructive sampling should be conducted in areas such as pipe chases. All interior spaces should be inspected.
11. Demolition contractors shall notify using the web portal stlcitypermits.com when they begin work at a demolition site, and when they depart the demolition site each day of activity.
E. Emergency Project. Any person undertaking an emergency asbestos abatement project shall notify APC by web portal, telephone, email, or fax and must receive approval of emergency status. The person must notify APC within twelve (12) hours of the onset of the emergency. Business entities with state-approved exemption status are exempt from emergency notification for state-approved projects that are part of a NESHAP planned renovation annual notification. If the emergency occurs after normal working hours or weekend, the person shall contact APC on the following work day. The notice shall provide:
1. A description of the nature and scope of the emergency;
2. A description of the measures immediately used to mitigate the emergency; and
3. A schedule for removal. Following the emergency notice, the person shall provide APC a notification on the form provided by APC and the person shall submit it within three (3) days of the onset of the emergency. The amendment requirements for notification found in Subsection D.3 and 4 of this section are applicable to emergency projects.
F. Procedures for Asbestos Emission Control. Each owner or operator of a demolition or renovation that contains regulated asbestos in excess of ten (10) square feet and/or sixteen (16) linear feet and/or three (3) cubic feet shall comply with the following procedures:
1. Remove all RACM from a facility, building, or structure being demolished or renovated before any activity begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. RACM does not have to be removed before demolition if:
a. It is Category l non-friable ACM that is not in poor condition and is not friable, and it will not be made friable by the removal activity.
b. It is a facility component that is encased in concrete or other similarly hard material and is adequately wet whenever exposed during demolition.
c. It is not accessible for testing and was, therefore, not discovered until after demolition began and, as a result of the demolition, the material cannot be safely removed. If not removed for safety reasons, the exposed RACM and any asbestos-contaminated debris must be treated as asbestos-containing waste material and remain adequately wet at all times until disposed of.
d. It is Category II non-friable asbestos containing material and the probability is low that the materials will become crumbled, pulverized, or reduced to powder during demolition.
2. When a facility component that contains, is covered with, or is coated with RACM is being taken out of the facility as a unit or in sections:
a. Adequately wet all RACM exposed during cutting or disjoining operations.
b. Carefully lower each unit or section to the floor and to ground level, not dropping, throwing, sliding, or otherwise damaging or disturbing the RACM.
3. When RACM is stripped from a facility component while it remains in place in the facility, adequately wet the RACM during the stripping operation.
4. After a facility component covered with, coated with, or containing RACM has been taken out of the facility as a unit or in sections, it shall be contained in leak-tight wrapping.
5. For large facility components such as reactor vessels, large tanks, and steam generators, the RACM is not required to be stripped if the following requirements are met:
a. The component is removed, transported, stored, disposed of, or reused without disturbing or damaging the RACM;
b. The component is encased in a leak-tight wrapping; and
c. The leak tight wrapping is labeled during all loading and unloading operations and during storage.
6. For all RACM, including material that has been removed or stripped:
a. Adequately wet the material and ensure that it remains wet until collected and contained or treated in preparation for disposal.
b. Carefully lower the material to the ground and floor, not dropping, throwing, sliding, or otherwise damaging or disturbing the material.
c. Transport the material to the ground via leak-tight chutes or containers if it has been removed or stripped more than fifty (50) feet above ground level and was not removed as units or in sections.
7. The person who conducts the demolition of unsafe buildings or parts of buildings containing asbestos may proceed with the demolition until it is safe for the asbestos abatement contractor to take representative samples of debris. It must be assumed that the debris contains regulated asbestos unless it can be proven through sampling that the debris or parts of the debris have asbestos content of less than one (1) percent in accordance with 40 CFR 61.141. If parts of the debris contain one (1) percent or less, and other parts contain greater than one (1) percent, and the various debris can be safely separated, then only those area of debris which contain greater than one (1) percent regulated asbestos must be specially handled. The following procedures on those portions of the buildings that pose imminent danger to public health or safety, or both, may be used:
a. The person shall ensure that the debris is wet at all times and stays wet until disposed. The person shall ensure that the project activities generate no visible emissions.
b. The person shall ensure that on site at all times during the demolition is an individual who is trained in asbestos removal techniques and who is certified as an asbestos abatement supervisor.
8. For emergency demolitions being conducted under an order of a state or local government agency:
a. Adequately wet the portion of the facility that contains RACM during the wrecking operation.
b. In all such cases where there is uncertainty as to the regulated asbestos in the facility, it should be assumed that it contains regulated asbestos until such time that representative samples can be taken of the debris to ascertain if greater than one (1) percent in accordance with 40 CFR 61.141, regulated asbestos content is present.
c. An asbestos abatement supervisor must be on site at all times.
9. Demolition contractors shall employ fugitive dust control measures in accordance with the City of St. Louis Department of Public Safety Building Division Demolition Handbook.
G. Third Party Air Monitoring.
1. No one employed by an owner or operator of a demolition or renovation activity, or person, partnership, or corporation performing or managing the demolition, construction, reconstruction, alteration, or occupancy on or at the site, or by or with a person, partnership, or corporation that shares a same, in whole or in party, ownership or control group will be employed as air sampling personnel.
2. An air sampling professional must be responsible to conduct all air sampling or be the responsible supervisor for air sampling technicians performing the sampling. When conducting the sampling, the air sampling professional is responsible to ensure all samples are analyzed by Phase Contrast Microscopy (PCM) under NIOSH method 7400, or to request analysis under transmission electron microscopy when necessary to distinguish asbestos fibers from other fibrous materials. The air sampling professional is responsible to ensure the following:
a. Area sampling shall be conducted using collection media and procedures in accordance with NIOSH method 7400. The following schedule shall be used for air sampling during an asbestos project (as defined by this section) in addition to any OSHA compliance monitoring required to be conducted by the contractor:
(1) Background air samples shall be collected and analyzed prior to the start of the asbestos project activities in order to determine background airborne fiber concentrations. Samples shall be taken both inside and outside of the work area to establish existing levels.
(2) The following schedule of samples shall be required on a daily basis once asbestos abatement activities begin. The size of the abatement activity will have impact on the number of samples necessary to monitor the contractor's activities. The following are required minimums:
(a) Two (2) area samples inside the work area;
(b) One (1) personal sample inside the work area;
(c) Two (2) area samples outside the work area in uncontaminated areas of the building, including one at the entrance to the worker decontamination enclosure; and
(d) One area sample at each discharge from negative pressure ventilation equipment to the outside of the building.
(3) Air monitoring results shall be documented and retained on site.
3. Third party continuous air monitoring is required during removal of all ACM if the building is occupied. (Monitoring is not required for demolitions if less than one hundred sixty (160) square feet, two hundred sixty (260) linear feet, or thirty-five (35) cubic feet of material is removed prior to demolition.). Final air clearance is required after ACM removal if the building is occupied or will be occupied at a later date. (Final air clearance is not required for demolitions if less than one hundred sixty (160) square feet, two hundred sixty (260) linear feet, or thirty-five (35) cubic feet of material is removed prior to demolition).
H. Post Notification.
1. Any person undertaking an asbestos abatement project or asbestos removal project that requires notification according to Subsection D of this section shall, on the APC provided form, notify APC within thirty (30) days of the completion of the project. This notice shall include a signed and dated receipt for the asbestos waste generated by the project issued by the landfill named on the notification. This notice shall include any final clearance air monitoring results. The air sampling technician performing the analysis shall sign and date all reports of analysis.
2. Business entities that qualify for exemption status are exempt from post-notification requirement, but shall keep records of waste disposal for department inspection.
(Ord. No. 71332, § 11, 4-19-2021.)