Sec. 34-975. - Construction sequencing and erosion controls.

(a) A comprehensive and detailed erosion and, sedimentation control plan and report shall be submitted with the application. The report shall specify maintenance of controls. All items noted in the erosion control and construction sequencing plans shall also be included in the final construction plans. (1) The report shall include the following items: a. Construction sequencing as it relates to placement, maintenance, removal of temporary erosion controls, and restoration measures. The sequencing plan schedules these items in the overall scheme of development. b. A list of such erosion controls and maintenance thereof. c. Slope stabilization techniques to be employed. d. Restoration plans including vegetative types. (2) The erosion control and construction sequencing plan shall include the following items: a. Location of temporary erosion controls with maintenance note. The plan shall show the physical details of the controls. b. A construction sequencing list, including the timing of the use of various controls in relation to steps in the construction. c. Restoration techniques and acceptability note. (b) The development shall comply with the erosion control and restoration measures guidelines as identified by the San Antonio Water System. (c) The clearing of land shall conform to the following criteria: (1) No clear or rough-cutting shall be permitted prior to the issuance of a letter of certification by the resource protection and compliance department. Limited clearing and rough-cutting for soil testing and surveying is allowed. (2) No clearing or rough-cutting for purposes other than paragraph (1) above and construction of temporary erosion and sedimentation controls as per approved plans shall be permitted until these controls are in place. (3) Clearing for the temporary storage of spoil or construction equipment, or for the permanent disposal of fill material or spoils, shall be so designated on the site plan. (4) Vegetation within any floodplain preservation or buffer, or significant recharge buffer area should not be disturbed except for purposes consistent with development activity permitted by section 34-912. (5) If an applicant does not comply fully with the approved construction sequencing and erosion control plan, the resource protection and compliance department shall notify him in writing that the city may correct and revegetate the, disturbed area at his expense, unless he does so within sixty (60) days after the date on the notice, or unless applicant provides erosion and sedimentation controls and the continuing maintenance thereof acceptable to the resource protection and compliance department. (6) The requirements of this division shall not apply to ordinary vegetation management specifically regulated elsewhere by this code. This subsection is not intended to provide a defense for or waiver of any other requirements of this code, including but not limited to those contained in Article V of Chapter 14.

(Ord. No. 81491, § 1(App. I), 1-12-95; Ord. No. 2006-02-16-0241, § 5, 2-16-06)