For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.72.160 — BOND REQUIREMENTS GENERALLY

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 18.72.160

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/75541dcc-c9a3-4ccb-9585-4e12e40d74f8

18.72.160: BOND REQUIREMENTS GENERALLY:

No relocation permit shall be issued unless the applicant therefor shall first post with the building official a performance bond executed by the owner of the premises where the building or structure is to be relocated as principal and by a surety company authorized to do business in the state of Utah as surety, or a cash deposit in the amount of the required bond, such deposit to be returned on the completion of the requirements contained in the permit. Such bond shall name Salt Lake City as obligee, and shall be in an amount equal to the cost of the work required to be done in order to comply with all of the conditions of the relocation permit, as determined by the building official. Any work on the project left unfinished after six (6) months may be finished by the city working through a contractor and utilizing funds from the performance or cash bond. (Prior code § 5-10-9)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.