§ 25.21.110 — Board meeting on certificate of approval
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 25.21.110
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/7584d6ef-8048-4530-ab84-293226ae7f5f
25.21.110 - Board meeting on certificate of approval
A. Within thirty (30) days after the filing of an application for a certificate of approval with the Board, the Board shall hold a meeting thereon and shall serve notice of the meeting on the owner and the applicant not less than five (5) days before the date of the meeting. B. In reviewing applications or appeals of decisions of the Board, the Board and the Hearing Examiner shall consider: (1) the purposes of this chapter; (2) the criteria specified in Section 25.21.034; (3) guidelines promulgated pursuant to this chapter; (4) the properties' historical and architectural or landscape value and significance; (5) the properties' architectural or landscape type and general design; (6) the arrangement, texture, material and color of the building or structure in question, and its appurtenant fixtures, including signs; (7) the relationship of such features to similar features within the Fort Lawton Landmark District; and (8) the position of such buildings, structures or landscape elements in relation to public property and to other buildings, structures and landscape elements. C. Notwithstanding any contrary provision in subsection 25.21.110.A or this Title 25, applications for certificates of approval for the following items shall be subject to administrative review and approval by the City Historic Preservation Officer, without the need for action of the Board or a public meeting but otherwise subject to the same approval criteria and procedures as would apply to such an application if it were subject to Board review and approval: 1. The installation, removal, or alteration of: fire escapes, ducts, conduits, HVAC vents, grilles, pipes, panels (including photovoltaic panels), weatherheads, wiring, meters, utility connections, downspouts and gutters, or other similar mechanical, electrical or telecommunication elements necessary for the normal operation of the site, building, or structure. 2. Installation, alteration, or removal of minor communication utility equipment on rooftops or streetlight poles, when the location does not have impacts on other historic resources and otherwise complies with the City Design Guidelines for minor communication utilities. 3. Installation, removal, or alteration of exterior light fixtures, exterior security lighting, and security system equipment. 4. Installation, removal, or alteration of exterior or interior signage. 5. Installation, removal, or alteration of awnings or canopies. 6. Alterations to storefront systems, if the proposed alterations are sympathetic to and do not destroy historic building materials. 7. Alteration to interior or exterior paint colors and other finishes when painting a previously painted or otherwise finished material. 8. Installation, removal, or alteration of the following landscape elements: shrubs; perennials; annuals; and similar low-lying plantings. 9. Installation, removal, or alteration of the following site furnishings: benches; movable tables and seating; movable planters; movable water features; trash/recycling receptacles; and bike racks. 10. Rights-of-way alterations, including but not limited to alterations to sidewalks, curbs, and the roadway. 11. Installation, alteration, or removal of art on public or private property, if the work does not adversely impact designated or historic features. 12. Installation of improvements for accessibility compliance. 13. Installation, removal, or alteration of fire and life safety equipment. 14. Temporary emergency alterations, if the proposed replacement material used is compatible with the historic building fabric. 15. Replacement of non-original doors and windows within original openings, when the design intent is consistent with the Secretary of the Interior's Standards for Rehabilitation. 16. Revisions to a previously approved Certificate of Approval, where the design revisions are sympathetic to and do not destroy historic building materials. 17. Alterations or changes to accommodate seismic improvements.
(Ord. 126760, § 6, 2023; Ord. 126188, § 19, 2020; Ord. 126072, § 23, 2020; Ord. 122750, § 1, 2008)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.
