Tuscaloosa Code of Ordinances § 16-200 Sanitary sewer lift stations; construction specifications, policies and procedures.
Sec. 16-200. - Sanitary sewer lift stations; construction specifications, policies and procedures.
(a) Development of specifications. The water and sewer department in conjunction and cooperation with the office of the city engineer shall develop and maintain uniform, standardized office of the city engineer specifications for sanitary sewer lift stations (or pumping stations) to be accepted by the city for continued maintenance and operation as part of its sanitary sewer collection and conveyance system. These specifications and standards shall be in writing and be kept on file with the executive director of water and sewer or designee and the office of the city engineer. They shall be made available to anyone requesting the same pursuant to the city's public records policy.
(b) Application. Any party or entity wishing to install a sanitary sewer lift station (or pumping station) to be accepted by the city for continued maintenance and operation as part of its sanitary sewer collection and conveyance system must apply to the office of the city engineer, in writing, stating their intentions with the request for sanitary sewer availability as outlined in the City of Tuscaloosa Sanitary Sewer Design Manual.
(c) Compliance with specifications. All such sanitary sewer lift stations shall be built in accordance with the City of Tuscaloosa Sanitary Sewer Design Manual, Part 8 Lift Station Design Standards. All such lift stations shall be designed, configured and located in such a manner as to integrate and be consistent with the city's sanitary sewer collection and conveyance system.
It is the responsibility of the developer and his/her consulting engineer to ensure compliance with these specifications. All deviations from the requirements of the specifications must be requested in writing to the office of the city engineer at the time the above plans are submitted. If written approval of a specification deviation is not received by the developer or his engineer within fifteen (15) days from the date of the submission of the above request, then it shall be presumed that the city has denied the deviation, and the sanitary sewer lift station shall be constructed as per the city's specifications.
(d) Guarantees and warranties. The specifications shall contain the requirement that the developer shall guarantee for one year from the date of acceptance of the sanitary sewer lift station by the city that the structure and all the equipment, pumps, motors, and appurtenances therein shall be free from defects and design, materials and workmanship. The sanitary sewer lift station manufacturer shall furnish replacement parts for any component proven defective, whether of his or other manufacturer during the guarantee period, accepting only those items which are normally consumed in service, such as light bulbs, oil, grease, packing, etc. These guaranteed components (not parts) shall include pumps, pump motors, electrical control panels (not parts) structural components and items that would require the removal of specified components. The manufacturer shall provide all labor necessary to replace and repair major components which fail during the guarantee period.
(Ord. No. 5882, § 2, 4-8-99; Ord. No. 7248, § 1, 5-13-08; Ord. No. 9790, § 3, 7-14-26)
