For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-1-9 — CERTIFICATE OF OCCUPANCY AND ZONING COMPLIANCE

City Code of West Jordan, Utah (2026 S-39: code current through Ord. 26-41, passed 7-28-2026) · West Jordan City Code § 13-1-9

Corpus is an independent public-information project, not the official City of West Jordan website. Stable reference: corpuslaw.us/code/77b66685-303e-45fc-b5be-88862daceb0c

13-1-9: CERTIFICATE OF OCCUPANCY AND ZONING COMPLIANCE:

A. Unlawful To Occupy: It is unlawful to use USE: The purpose for which a lot or structure is designed, arranged or intended, or for which it is occupied or maintained. or occupy, or to permit the use or occupancy of, any building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. , property or premises prior to approval of a certificate of occupancy and zoning compliance (hereinafter referred to as "certificate") for the property development DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. "Development" also means the property being developed and/or subdivided, or the act, process or result of developing. , premises and/or building by the city CITY: The city of West Jordan, Utah, a municipal corporation. . It is unlawful to occupy, or to allow the occupancy or use of, any property development, premises or building that has a materially different design or greater intensity INTENSITY: The degree of a quantitative or qualitative measurement associated with a use of land or building which impacts surrounding property owners. of use or different occupancy than specifically provided for in the approved certificate. B. Certificate Of Occupancy And Zoning Compliance: A certificate of occupancy and zoning compliance shall be issued by the city administrator CITY ADMINISTRATOR: The city administrative employee charged with the daily operations of all city departments, who is also the supervisor of department heads (chief administrative officer). or a designee after a real property LAND, REAL ESTATE, REAL PROPERTY: Means and includes land, tenements, hereditaments, water rights, possessory rights and claims. development DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. "Development" also means the property being developed and/or subdivided, or the act, process or result of developing. and/or building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. is completed and has passed final inspection. A temporary certificate not to exceed a period of six (6) months may be issued if the city administrator or his designee makes a written determination that conditions of zoning, site plan SITE PLAN: A schematic, scaled drawing of a building lot or location which indicates the placement and location of yards, property lines, adjacent parcels, utilities, topography, waterways, irrigation, drainage, landscaping, parking areas, driveways, buildings, trash containers, outside storage, streets, sidewalks, curbs, gutters, signs, lighting, fences, and other features of existing or proposed construction or land use. or other required approvals have been substantially met, but that acceptable circumstances have prevented or necessitated a delay in the installation of certain improvements required by the approved site plan, and that such delay will not create a hazard or safety concern. During the months of October to April, a cash bond equal to one hundred percent (100%) of estimated completion costs shall be required prior to issuance of the temporary certificate. During the months of May to September, a cash bond equal to one hundred fifty percent (150%) of the estimated completion costs shall be required prior to issuance of the temporary certificate. A new certificate shall be required any time there is a change of design, use USE: The purpose for which a lot or structure is designed, arranged or intended, or for which it is occupied or maintained. or occupancy classification. C. Inspection And Release Of Bond: When a cash bond has been posted with the city CITY: The city of West Jordan, Utah, a municipal corporation. , an inspection must be scheduled with city staff to determine that all conditions of zoning, site plan SITE PLAN: A schematic, scaled drawing of a building lot or location which indicates the placement and location of yards, property lines, adjacent parcels, utilities, topography, waterways, irrigation, drainage, landscaping, parking areas, driveways, buildings, trash containers, outside storage, streets, sidewalks, curbs, gutters, signs, lighting, fences, and other features of existing or proposed construction or land use. , or other required approvals have been met. Once the city administrator CITY ADMINISTRATOR: The city administrative employee charged with the daily operations of all city departments, who is also the supervisor of department heads (chief administrative officer). or his designee has determined that all conditions to the approval of the project have been met, the cash bond may be released and permanent occupancy and/or use USE: The purpose for which a lot or structure is designed, arranged or intended, or for which it is occupied or maintained. granted. If conditions have not been met at the end of the six (6) month MONTH: A calendar month, unless otherwise expressed. period, permanent occupancy will not be granted and the cash bond will be retained by the city. The retained funds shall be expended for the purpose of completing the required work which may be completed by city staff, contractor hired by the city, or others at the city's discretion and with city approval. Funds not expended for completion of the work shall be returned to the party who posted the bond. D. Failure To Obtain Certificate Of Occupancy And Zoning Compliance: Occupation without obtaining a certificate of occupancy and zoning compliance or allowing to be occupied or used any residential, commercial COMMERCIAL: A retail business, service establishment, professional office, or other enterprise that includes commerce and/or trade and the buying and selling of goods and services. , industrial or institutional property development DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. "Development" also means the property being developed and/or subdivided, or the act, process or result of developing. and/or building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. , or premises, or for changing the use USE: The purpose for which a lot or structure is designed, arranged or intended, or for which it is occupied or maintained. or occupancy classification as provided for in the certificate issued under this title, shall be a violation VIOLATION: The failure of a structure or other development to be fully compliant with the city's floodplain management requirements in this title. A structure or other development without the elevation certificate, other certifications, or other evidence of required compliance is presumed to be in violation until such time as that documentation is provided. of this title, subject to prosecution as provided in this code CODE: The West Jordan City Code comprised of titles, containing ordinances and amendments as enacted by the City Council. . E. Nuisance: The occupancy or use USE: The purpose for which a lot or structure is designed, arranged or intended, or for which it is occupied or maintained. of any real property LAND, REAL ESTATE, REAL PROPERTY: Means and includes land, tenements, hereditaments, water rights, possessory rights and claims. development DEVELOPMENT: Any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations. "Development" also means the property being developed and/or subdivided, or the act, process or result of developing. and/or building BUILDING: A permanently located structure for the shelter, housing or enclosure of any person, animal, article or chattel. for which a certificate has not been issued is hereby declared to be a nuisance and may be abated as such. It shall also be a nuisance for any real property development and/or building to be used or occupied with greater intensity INTENSITY: The degree of a quantitative or qualitative measurement associated with a use of land or building which impacts surrounding property owners. or different use or design than authorized in its permits and certificates. (2001 Code § 89-1-109; amd. Ord. 19-50, 12-11-2019, Effective at 12 noon on January 6, 2020)

Ask a question about West Jordan law

Corpus searches the West Jordan sections it holds and shows the ones that match, with their citations. Free, no sign-in.