Plans and approval.
North Las Vegas Municipal Code § 13.36.040
in effect13.36.040 - Plans and approval.
A. The applicant shall be responsible for complying with all applicable requirements of this chapter and shall make the necessary arrangements with the utility companies involved. For the specifications, design plans and installations, the utility companies shall comply with this chapter in the installation of said facilities. Said installation specifications and design plans shall comply with the commission and the National Electric Safety Code.
B. After approval of the subdivision by the city is obtained, the applicant shall provide the utility company with an approved copy of the development map of the building construction proposed. The applicant shall provide a statement on the development map, indicating desired terminal points of the distribution system proposed. Further, the applicant shall provide the utility companies with copies of all proposed development plans necessary for proper design of the utility system.
C. The utility shall furnish the applicant and the director of public works or the city engineer with approved plans required by the utility for the overall underground system. The utility services will be furnished in accordance with the rules and regulations of the commission and this chapter.
D. An "as-built" plan shall be furnished to the city by the utility companies involved which will show the underground distribution systems as actually installed.
E. It shall be the responsibility of the applicant to provide underground utility easements as may be required.
F. Underground electrical, communication or similar associated services shall be installed in conduit or direct buried with spare conduit available when crossing any major street or at any street intersection. The size of the conduit shall be determined by the utility involved, allowing for future requirements. Said requirements may be waived by the director of public works or the city engineer for just cause.
G. The utility shall furnish the director of public works or the city engineer plans for approval for constructions of any utility system which is to be installed within any portion of a public right-of-way or easement.
H. Utility company or utility contractor is required to obtain permits for work in public right-of-way.
(Ord. 1174 § 2, 1996; prior code § 16.28.040)