For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-95 — Fee schedule; bond for payment of fees

Code of Ordinances, City of Winston-Salem, North Carolina (Supp. No. 103: codified through Ordinance No. 26-0283, enacted June 22, 2026) · Winston-Salem Code of Ordinances § 10-95

Corpus is an independent public-information project, not the official City of Winston-Salem website. Stable reference: corpuslaw.us/code/79f82ada-6dba-472a-b55e-05ba39b3f9ca

Sec. 10-95. - Fee schedule; bond for payment of fees.

(a) Fees for new residential construction established by subsection 10-31(a)(2) shall apply as applicable. (b) Fees for nonresidential construction and existing residential buildings. For nonresidential construction and alterations and repairs to existing residential buildings, the following fees shall apply: (1) Heat-producing equipment. Permit fees for installation, conversion or replacement of the following shall be in accordance with schedule I: a. Each boiler, furnace, or air handler with electric heat including the duct distribution system therefor when covered by the same permit, fired by fossil fuel, solid fuel, electricity or solar energy. b. Each floor furnace, wall circulator or heater, circulating heater, direct-fired unit heater, gas radiator, blast furnace, rotary dryer, annealing furnace, duct heater or industrial oven fired by fossil fuel, solid fuel, electricity or solar energy. c. Each domestic or commercial hot water system fired by fossil, solid or solar energy. d. Nonresidential gas-fired cooking appliances. e. Conversion or replacement of any of the equipment mentioned in this subsection. Schedule I Residential, per unit listed above .....$21.00 Nonresidential, per unit listed above: 0 to 150,000 btu/hr or 0 to 45 kw .....25.00 Over 150,000 btu/hr or over 45 kw .....108.00 Residential or nonresidential: Fan coil units, unit heaters, variable air volume controls, infrared radiant heating units or heat strips in through-the-wall heat pumps having no duct work, each .....5.25 (2) Heat pumps; air conditioning. Permit fees for installation or replacement of the following shall be in accordance with schedule II: a. Each heat pump and air conditioning unit, including major components and the duct distribution system therefore when covered by the same permit, or major component only. b. Installation or replacement of duct system only. Schedule II Residential, per unit listed above .....$21.00 Nonresidential, per unit listed above (nominal compressor rating): 0 to 25 tons .....25.00 Over 25 tons .....108.00 Duct only .....21.00 Residential or nonresidential: Fan coil units, unit heaters, variable air volume controls, infrared radiant heating units or heat strips in through-the-wall heat pumps having no duct work, each .....5.25 Residential only—Mechanical changeout permits (includes electrical): Flat fee .....$100.00 (3) Nonresidential exhaust systems. Permit fees for installation or replacement of the following shall be in accordance with schedule III: a. Each type I or type II hood over appliances (in other than residential use), such as dishwashers and appliances for frying, barbecuing, broiling and baking of foods, including the exhaust duct system therefor when covered by the same permit. b. Each exhaust system (in other than residential use) including ducts and make-up air for hoods, commercial and industrial exhaust systems, measured by the cubic feet per minute listed on each unit. Schedule III Exhaust systems, each (cubic feet per minute): 0 to 2,000 CFM .....86.00 2,001 to 3,000 CFM .....123.00 3,001 to 5,000 CFM .....154.00 Over 5,000 CFM .....500.00 c. Each through the wall or roof exhaust with no more than 10 feet of attached duct, individual bathroom exhaust .....5.25 (4) Gas outlets. Permit fees for installation or replacement of gas outlets shall be in accordance with schedule IV: a. Each gas or fuel outlet for appliances in residential use, including but not limited to clothes dryers, ranges and gas lights. b. Gas house connections. c. Installation of medical gas. Schedule IV Gas or fuel outlets, each .....$8.00 Gas house connections, each .....8.00 Medical gas, per station outlet .....10.00 (5) Refrigeration units. Permit fees for installation, repair or replacement of refrigeration units and refrigerant lines shall be in accordance with schedule V: Schedule V Refrigeration units: 0 to 10 horsepower, per system .....$25.00 10.1 to 20 horsepower, per system .....63.00 Over 20 horsepower, per system .....270.00 Refrigeration line, per line .....21.00 (6) Minimum fee. The total of fees due for any permit shall be not less than $75.00. (c) Cash bond. Licensed heating, air conditioning, refrigeration and ventilation contractors, in lieu of paying their inspection fees daily, may deposit a cash bond with the director of finance in an amount not less than an average month's fees paid by such contractors during the previous year, and in no case shall it be less than $100.00. Inspection permits may be issued against this bond up to the full amount, but in no case will credit be extended beyond the amount of the bond. If payment is not made within five days after submission by the inspection division of the bill for inspection fees for the previous period, the cash bond shall be forfeited and applied against the permits outstanding. Any balance left of the bond will be returned to the contractor. (d) Surety bond. Licensed heating, air conditioning, refrigeration and ventilation contractors, in lieu of paying their inspection fees daily, may file with the director of finance a contractor's license bond written by a surety company approved by the department of insurance to do business in the state, to be held as surety for the payment of fees. Such bond shall be in an amount of not less than $2,500.00. Inspection permits may be issued based on the posting of this bond up to the full amount, but in no case will credit be extended beyond the amount of the bond. Contractors will be billed monthly. Payment will be due in ten days and delinquent in 25 days. No further permits will be issued to delinquent accounts, regardless of the amount of the bond. If payment is not received in 60 days, the bond will be executed for the amount of the bill. This bond may also meet the requirement for the posting of a bond when required by section 10-131. (e) Bonded account setup and maintenance fee. Any account which is not paid within 30 days of the billing date will be charged a late fee of two percent of the outstanding balance. There will be a reasonable charge assessed to establish a bonded account and a reasonable yearly maintenance charge for continuation of the account. There will be a reasonable charge assessed for foreclosure of a delinquent bonded account.

(Code 1975, § 4-40; Ord. No. 4329, § 2, 6-8-99; Ord. No. 4401, § 3, 9-17-01; Ord. No. 4453, § 7, 5-19-03; Ord. No. 4497, § 6, 6-22-04; Ord. No. 4793, § 5, 6-17-13; Ord. No. 24-0369, § 3, 6-17-24)

Ask a question about Winston-Salem law

Corpus searches the Winston-Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.