§ 37-138 — Wastewater permit—Contents
Code of Ordinances of the City of Pasadena, Texas (Supp. No. 33, Update 2: codified through Ordinance No. 2026-143, enacted September 1, 2026) · Pasadena City Code § 37-138
Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/7a0227b6-6a9c-4afd-9aa4-6ba0139ff027
Sec. 37-138. - Wastewater permit—Contents.
Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the director of public works to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (1) Wastewater discharge permits must contain the following conditions: a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years; b. A statement that the wastewater discharge permit is nontransferable without prior notification to and approval from the city, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; c. Applicable pretreatment standards and requirements, including any special state requirements, effluent limits, including best management practices, based on applicable Pretreatment Standards; d. Self-monitoring, sampling, reporting, notification, submittal of technical reports, compliance schedules, and record keeping requirements (three years which includes BMPs). These requirements shall include an identification of pollutants (or best management practices) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; e. Requirement for immediate notification to the city where self-monitoring results indicate noncompliance; f. Requirement to report a bypass of a pretreatment facility; g. Requirement to report immediately to the city all discharges, including slug loadings, that could cause problems to the POTW; h. Requirement for the SIU who reports noncompliance to repeat the sampling and analysis and submit results to the city within thirty (30) days after becoming aware of the violation; i. A statement of applicable civil, criminal, and administrative penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule; j. Requirements to control slug discharges, if determine by the POTW to be necessary. (2) Wastewater discharge permits may contain, but need not be limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; b. Limits on the instantaneous, daily, and monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties; c. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; d. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or routine discharges; e. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; f. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; g. Requirements for installation and maintenance of inspection and sampling facilities and equipment; h. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; i. Any special agreements the director of public works chooses to continue or develop between the city and user; j. Other conditions as deemed appropriate by the director of public works to ensure compliance with this article, and state and federal laws, rules, and regulations.
(Ord. No. 09-277, § 2, 12-29-09; Ord. No. 11-129, § 2, 8-9-11; Ord. No. 20-044, § 2, 4-21-20)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.
