For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.38.090 — Notice

El Paso City Code (Supp. No. 95, Update 4: codified through Ordinance No. 019889, enacted June 23, 2026) · El Paso City Code § 2.38.090

Corpus is an independent public-information project, not the official City of El Paso website. Stable reference: corpuslaw.us/code/7a1b33f6-94a8-4027-b053-41b32f006bd8

2.38.090 - Notice.

A. A diligent effort, as defined in Section 2.38.015, must be made to identify the owner of any real property or sign that is the subject of a hearing under this chapter. B. Notification of hearing or rehearing must be provided to all interested parties at least ten days before the hearing and the notice must include: 1. The date, time, and place of the hearing; 2. An identification, which is not required to be a legal description, of the structure and the property on which it is located; 3. A description of the alleged violations of the El Paso City Code; 4. If a dangerous structure hearing, a statement that if any interested party wishes to advocate for repair, they bear the burden of demonstrating that repair is a reasonable option and must submit at or before the hearing proof of the scope of any work that may be required to bring the building into minimum compliance with Chapter 18.50 and the time it will take to reasonably perform the work; 5. A citation to this chapter; 6. If a dangerous structure hearing, that the notice is being filed in the El Paso County real property records and that the notice binds any party that becomes an interested party subsequent to the day the notice is recorded. C. Notification of commission order. Within ten days of an issued order the director or designee shall provide notification to each identified interested party and shall file a copy of the order with the city clerk. D. Notice required: city to perform work. 1. The director or designee shall cause notification to the owners and prominently post the notice at the property five days prior to the date the city intends to complete the work. The notice must include: a. An identification, which is not required to be a legal description, of the structure and the property on which it is located; b. An identification of the commission order affecting the property and the actual order or an outline of findings; c. A statement that the commission order has not been complied with; and d. The date and time the city will begin performance of the work. E. Publication requirements. 1. Notice of a dangerous structure hearing or rehearing must be published in a newspaper of general circulation and must include the same information listed in Section 2.38.090 B.1. through 6. 2. Within ten days of the issuance of a dangerous structure order, the order or an order in an abbreviated form must be published in a newspaper of general circulation. If an abbreviated order is published it must include the street address or legal description of the property, the date the hearing was conducted, a brief statement indicating the result of the hearing and instructions stating where a complete copy of the order may be obtained. F. Recording requirements. 1. Notice of a dangerous structure hearing or rehearing shall be filed in the El Paso County real property records and that notice binds any party that becomes an interested party subsequent to the day the notice is recorded. 2. Upon receipt of the order, the city clerk shall cause a notice of a dangerous structure order shall be filed in the El Paso County real property records and that notice subjects any subsequent interested party to the requirements of the order. The provisions of this subsection must be included in each order.

(Ord. No. 19112, § 1, 10-27-2020)

Ask a question about El Paso law

Corpus searches the El Paso sections it holds and shows the ones that match, with their citations. Free, no sign-in.