For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-17-5 — IMPOSITION OF IMPACT FEES

Mesa City Code (Supp. No. 22: codified through Ordinance No. 5996, adopted March 9, 2026) · Mesa City Code § 5-17-5

Corpus is an independent public-information project, not the official City of Mesa website. Stable reference: corpuslaw.us/code/7af63d48-03ed-4e94-909f-1f3cd10c533e

5-17-5: - IMPOSITION OF IMPACT FEES

(A) Impact Fees Required. Any person who obtains a building permit, a right-of-way permit, or any other permit, is required to pay the applicable water impact fee, wastewater impact fee, park impact fee, library impact fee, fire impact fee, public safety impact fee, and stormwater drainage impact fee unless the type of development described in the permit is specifically exempted by this Chapter. In addition, any person who seeks a connection to the City water system shall pay a water impact fee, and any person who seeks a connection to the City wastewater system shall pay a wastewater impact fee, regardless of whether the development to be connected requires a building permit or other permit. (3502, 3875, 4039, 4234, 4239, 4240, 4706, 5071) (B) Timing of Payment. Any person required by this Chapter to pay one (1) or more impact fees, shall pay each impact fee required by this Chapter to the City prior to, or in conjunction with, the issuance of any such permit, or prior to the completion of any connection to the City's water and wastewater systems; and no such permits shall be issued and no such connections shall be made until each impact fee required by this Chapter has been paid. All impact fees paid pursuant to this Chapter shall be promptly deposited in the appropriate impact fee funds described in Section 5-17-7. (3502, 3875, 4039, 4706) (C) Calculation of Impact Fees from Impact Fee Tables. 1. The City Manager, or his designee, shall determine the amount of each required impact fee through the use of the impact fee table set forth in this Chapter. (3502, 3875, 4706, 5189) 2. Land Use Type. The City Manager, or his designee, shall determine the land use type for each development based on the land use or land uses applicable to the lot to be developed in its entirety. If a lot consists of two (2) or more separate areas with different land uses applicable to each separate area, then the impact fee shall be determined by adding up all the fees that would be applicable for each land use type in each separate area. Determinations of the land use type may be appealed to the City Manager or his designee. (3502, 4039, 4234, 4706, 5189) 3. Meter Size. The City Manager, or his designee, shall determine the meter size for each lot based on the actual meter size installed on each lot. If the exact meter size is not listed in a table, then the City shall use the next largest meter size in such table. If a lot consists of two (2) or more separate areas with separate meters in each separate area, then the impact fee shall be determined by adding up all the fees that would be applicable for each meter size in each separate area. (3502, 4039, 4706, 5189) 4. Calculation of Square Footage. In assessing the development impact fees for the nonresidential land use type, any determination of square footage shall be in whole units, with any fractions thereof being rounded up to the next square foot. (4234, 4706) 5. Existing development credits. Impact fees for development projects involving an addition to or remodeling of an existing facility, change of use, change of housing type, change of meter size or other modification or redevelopment of a previously developed lot or building with a valid certificate of occupancy shall be calculated as follows: The applicable impact fees for each proposed housing type, land use type and meter size as set forth in the current impact fee tables minus the applicable impact fees for each existing or previous housing type, land use type and meter size as set forth in the current impact fee tables. Calculated amounts equal to or less than zero dollars ($0.00) shall result in no additional impact fee for that specific impact fee or fees. Unused credit amounts shall not be refunded to the owner or applicant, but shall run with the land until utilized in full. (4706) 6. If a manufactured home housing type is located on a separately platted lot, the impact fees shall be calculated as for single residence detached dwelling. If a manufactured home housing type is located on a recreational vehicle park space, the impact fees shall be calculated as for manufactured home/recreational vehicle. (4706)

Ask a question about Mesa law

Corpus searches the Mesa sections it holds and shows the ones that match, with their citations. Free, no sign-in.