§ 18.76.050 — CONSTRUCTION PERMITS REQUIRED; FEES
City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 18.76.050
Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/7b59b39a-1b49-49bf-b453-2d027226bc36
18.76.050: CONSTRUCTION PERMITS REQUIRED; FEES:
Mobile home park construction permits required by the division shall be issued to properly licensed contractors as follows: A. A general building permit fee shown on the Salt Lake City consolidated fee schedule, to be issued for pads, patio slabs, metal sheds (sheds to be installed by mobile home occupant), curb, gutter, drives, piers, sidewalks, fence or wall, per mobile home space; B. Electric meter stands or pedestals at the rate shown on the Salt Lake City consolidated fee schedule; C. The park plumbing system, including sewer and water risers, shall require the fee shown on the Salt Lake City consolidated fee schedule, for each space; D. All permanent buildings, swimming pools, etc., shall have permit fees assessed at the regular and normal fee schedule; E. Fire hydrants within the property lines shall require a permit fee shown on the Salt Lake City consolidated fee schedule, for each hydrant. (Ord. 91-24, 2024: Ord. 24-11, 2011)
Ask a question about Salt Lake City law
Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
