§ 10.38 — CONSTRUCTION OF HEATED CONCRETE SIDEWALK
Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 10.38
Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/7ba43a3d-bb9e-4cc8-b2d2-c1c68d3ca410
10.38 - CONSTRUCTION OF HEATED CONCRETE SIDEWALK.
Whenever a sidewalk is to be constructed with electric, circulating fluid, steam or any other type of heating system, the property owner shall submit plans for approval to the City Engineer showing the type of heating and the location and design of the heating unit in the sidewalk and its connection to the source of power or heat at least five (5) days prior to installation. A record of all heated sidewalk installations shall be kept in the office of the City Engineer. A permit for such installation shall be obtained from the City Engineer before commencement of the work. Acceptance of the permit by the applicant shall constitute their agreement to the following conditions. (Am. by ORD-14-00012, 1-14-14) (1) A metal identification plate shall be placed flush with the sidewalk or the words "Heated Walk" shall be stamped in each section of sidewalk. Letters shall be a minimum of two (2) inches high. (2) When the heated sidewalk is in need of repair and requires the repair or reinstallation of the heating system, the property owner shall pay any and all costs involved for replacement of the heated sidewalk. It shall be the responsibility of the property owner to make arrangements with their own contractor for repairing or reinstalling the heating system. In the event that new utilities are to be installed or if existing utilities are in need of repair under the heated sidewalk, it shall be the responsibility of the utility to repair at its expense the heating system and the sidewalk. (Am. by ORD-14-00012, 1-14-14) (3) All heated sidewalk installations will be inspected by the City Engineer prior to pouring the concrete sidewalk. (4) No part of the heating system will be installed in that portion of the sidewalk that is located within three (3) feet of the back of the curb and gutter.
Ask a question about Madison law
Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.