Sec. 25-34. Water; repayments; water mains.
(a) This Chapter shall apply where a water main is extended by one property owner and connected to at a later date by one or more additional property owners. A property owner who extends a water main which is sixteen (16) inches in diameter or less and which provides a means of service to property owned by others may enter into an agreement with the City providing for repayment of a portion of the costs when the property abutting the main extensions develops. The project shall be bid in accordance with the provisions pertaining to public works projects contained in A.R.S. Title 34. The bids shall be opened at a location designated by the City on a pre-determined date agreeable to the property owner and the City. The City and the property owner reserve the right to reject any or all bids. The construction costs shall be determined prior to the commencement of construction and shall be approved by the City. In the event that the agreed upon construction costs increase, the repayment agreement may be amended upon approval of the additional construction costs by the City. (b) The City reserves the right to increase the diameter of the approach main above the standards in this Chapter if it deems advisable, but under the condition, that the City will assume the additional cost to increase the diameter of the water main above that which the property owner would incur for the approach main under the standards required by this code. (c) The final detailed plans and specifications for the water main extension must be approved by the City prior to construction. The engineering costs for the preparation of plans, specifications and staking of the approach main incurred by the property owner may be included in the agreed construction costs as provided for in this Section. The costs of distribution mains within the boundary of the project shall not be eligible for repayment. (d) Agreements must be executed prior to construction of the water main and shall run for a period not to exceed ten (10) years from the date of execution by the City Engineer, who is authorized to execute the agreements in accordance with the provisions of this code. The agreements shall automatically terminate at the end of a ten (10) year period or upon repayment of the total amount possible being repaid, whichever is earlier. The City will not approve and/or execute an agreement after construction or acceptance by the City of the water main. There will be no repayments for buy-in assessments collected prior to receipt of the developer's request to enter into an agreement. (e) Repayment will assist in establishing a reasonable charge to permit a connection. The connection charge will be made on a cost per frontage foot, using the agreed water main construction costs (and the extent to which new development is adjacent to the water main), less the repayment transaction fee established by City Council to cover administrative costs associated with the repayment agreement. (f) The City Engineer will determine the amount of footage to be reimbursed, and such determination will be made a part of the agreement. Such agreements must be recorded in the office of the Maricopa County Recorder. (g) The City will make repayments within sixty (60) days of receipt of payment from adjacent property owners. The developer to whom the reimbursement is to be made must be stated on the agreement at the time of execution and it will be the duty of the developer (the individual to whom reimbursement is to be made) to keep the City Engineer advised as to the correct mailing address, etc. for reimbursement. Repayment agreements under this Chapter may be assigned to subsequent property owners of property who purchase or acquire the entire interest of the original property owner who entered into the repayment agreement and in accordance with the specific terms of the repayment agreement. (h) The City retains and reserves the right (and ability) to enter into separate special agreements to cover unique situations where a standard repayment agreement is not applicable. (i) Existing water lines, which are greater than sixteen (16) inches in diameter are considered part of the water transmission system and are not part of the water distribution grid. Property owners may be required to construct distribution mains of the required size parallel with such existing transmission system mains. Where existing distribution system mains within a development or along streets bounding the development, are smaller in size than that required by this code, or are otherwise inadequate, the property owner may be required to replace or parallel such mains with those of the required size. (Code 1977, § 13-7-10; Ord. 98-115, 1/5/99. Amended to (b) and (c); Ord. No. 07-37, 11/20/07, Repealed existing Sec. 25-34; Enacted new Sec. 25-34 (SUPP 2007-4); Ord. No. 2026-01, § 12, 1-13-26)
Ask a question about Peoria law
Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.