§ 18.07.040 — Approvals required

Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 18.07.040

Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/7bd9179e-cdd2-4a91-96d5-1d1f0dd0f748

18.07.040 - Approvals required.

No work shall be done on any part of the building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the Building Official. The Building Official, upon notification pursuant to Section 18.07.030 by the person, firm or corporation performing the work, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or their duly authorized agent wherein the same fails to comply with the provisions of this title, municipal code or other ordinances of the City, or laws and statutes of the State. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the Building Official. Such written approval shall be given only after an inspection has been made of each successive step in the construction as indicated by each of the inspections required or conditions stipulated in Section 18.07.050. There shall be a final inspection and approval on all buildings or equipment installations when completed and ready for occupancy or use. EXCEPTIONS: 1. For temporary connection, the Building Official may give written permission to furnish electric current to or the use of electric current through any electrical wiring if such electrical wiring may be used safely for such purposes, and that there exists an urgent necessity for such use. 2. The requirements of this section shall not be considered to prohibit the operation of any heating equipment installed to replace existing heating equipment serving an occupied portion of a building, in the event a request for inspection of such heating equipment has been filed with the Building Official not more than forty-eight (48) hours after such replacement work is completed, and before any portion of such equipment is concealed by any permanent portion of the building.

(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)