§ 17.36.120 — PRETREATMENT REQUIREMENTS
City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 17.36.120
Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/7bf2acaa-dd2a-4948-8699-806ecadae8e5
17.36.120: PRETREATMENT REQUIREMENTS:
Users shall provide wastewater treatment as necessary to comply with this division and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in section 17.36.060 of this chapter within the time limitations specified by EPA, the state, or the director, whichever is more stringent. Any facilities or equipment (e.g., continuous pH meters, ORP meters) necessary for ensuring consistent compliance shall be provided, operated, and maintained at the user's expense. Detailed plans describing such facilities, equipment and operating procedures shall be submitted to the director for review, and shall be acceptable to the director before such facilities are constructed and equipment installed. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities or equipment as necessary to produce a discharge acceptable to the city under the provisions of this division. Following completion of construction the director may request the user to provide copies of as built drawings to be retained by the director. Subsequent alterations or additions to such pretreatment or flow control facilities shall not be made without prior notice to the director. New sources shall install and operate all pollution control equipment required to meet applicable pretreatment standards prior to discharging to the POTW. (Ord. 68-11, 2011)
Ask a question about Salt Lake City law
Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.
