For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.440.345 — Supplemental Application Requirements

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.440.345

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/7c5f7c62-6808-4a33-a965-61b79f6e531f

33.440.345 Supplemental Application Requirements

In addition to the application requirements of Section 33.730.060, Application Requirements, the information below is required for Greenway review applications. A. Supplemental site plans. One copy of each plan must be at a scale of at least one inch to 100 feet. 1. An existing conditions site plan, showing the following: a. Topography shown by contour lines at two foot vertical contours in areas of slope less than 10 percent and at five foot vertical contours in areas of slope ten percent or greater; b. The top of bank and the setback area and the structures and topographic contours referenced to determine the top of bank. The site plan depicting the top of bank must be drawn accurately to scale, and be suitable for reproduction on paper no smaller than 8.5 x 11 inches and no larger than 36 x 48 inches. The scale of the drawing must be between 1 inch = 50 feet, and 1 inch = 10 feet. Ground elevations must be shown by contour lines at 2-foot vertical intervals. See the definition of top of bank in 33.910.030; c. Distribution outline of shrubs and ground covers with a list of most abundant species; d. Trees identified by species, including the location of the drip line; e. Streams, wetlands, other water bodies, and drainage patterns, using arrows to indicate the direction of major drainage flow; f. Existing improvements such as structures, buildings, utility lines, fences, paved areas, roads, culverts, and bridges; g. Areas of known soil or groundwater contamination, areas of uncontained hazardous materials, and underground storage tanks; and h. Stormwater management facilities. 2. A development proposal site plan including: a. A grading plan showing proposed alteration of the ground at two foot vertical contours in areas of slopes less than 10 percent and at five foot vertical contours in areas of slopes ten percent or greater; b. Proposed improvements such as structures, buildings, utility lines, fences, paved areas, roads, culverts, bridges; stormwater facilities; and c. Areas where existing topography and vegetation will be left undisturbed. 3. A construction management site plan including: a. Areas that will be disturbed, including equipment maneuvering areas; b. Location of site access and egress; c. Equipment and material staging and stockpile areas; d. Erosion control measures; and e. Tree protection measures for trees to be preserved that meet the requirements of Title 11, Chapter 11.60, Technical Specifications. B. River Quality overlay zone. The following information is required for Greenway review applications for development, exterior alterations, excavations, and fills in the River Water Quality overlay zone setback: 1. A mitigation or remediation plan including: a. Detailed plans or drawings describing any proposed mitigation or remediation activities; b. Distribution outline, species composition, and percent of ground covered with ground cover plants, shrubs, and trees to be seeded or planted; c. Stormwater management features, including retention, infiltration, detention, discharges, and outfalls; d. Water bodies to be created, including depth; and e. Planting specifications consistent with Section 33.248.090, Mitigation and Restoration Plantings. 2. Narrative. The following written narratives are required: a. Impact evaluation. An impact evaluation is required to determine compliance with the approval criteria and to evaluate development alternatives for a particular development. The alternatives must be evaluated on the basis of their impact on the functional values of the water quality resource area. The impact evaluation is based on the functional values identified in the Purpose Statement, Section 33.440.010. An impact evaluation includes: (1) Identification, by characteristics and quantity, of the functional values found on the site; (2) Evaluation of alternative locations including outside the River Water Quality overlay zone setback, design modification, or alternative methods of development to determine which options reduce the significant detrimental impacts on the functional values of the site; and (3) Determination of the alternative that best meets the applicable approval criteria and identification of significant detrimental impacts that are unavoidable. b. Construction management plan. Identify measures that will be taken during construction or remediation to protect the remaining functional values at and near the construction site and a description of how undisturbed areas will be protected. For example, describe the timing of construction, how construction equipment will be controlled, and describe how trees will be protected in conformance with Chapter 11.60, Technical Specifications, and erosion controlled in conformance with Title 10, Erosion and Sediment Control Regulations. c. Mitigation or remediation plan. The purpose of a mitigation or remediation plan is to counteract unavoidable significant detrimental impacts that result from the chosen development alternative as identified in the impact evaluation. A mitigation or remediation plan includes: (1) A description and analysis of how significant detrimental impacts will be avoided, minimized, or mitigated, as follows: • Significant detrimental impacts must be avoided where practicable; • Where avoiding significant detrimental impacts is not practicable, the impact must be minimized, and the impacts mitigated. The mitigation must meet the following: − The mitigation must be on the construction site, and must enhance the same kind of resource. − If it is not practicable to mitigate impacts using the same kind of resource, a different kind of resource may be used. (2) Functional values to be restored, created, or enhanced on the mitigation or remediation site; (3) Documentation of coordination with appropriate local, regional, special district, state, and federal regulatory agencies; (4) Construction timetables; (5) Operations and maintenance practices; (6) Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.