§ 151.92 — Sanitary sewer improvements
Code of Ordinances, City of Dayton, Ohio (Supp. No. 36: codified through Ordinance No. 32173-25, passed December 31, 2025) · Dayton City Code § 151.92
Corpus is an independent public-information project, not the official City of Dayton website. Stable reference: corpuslaw.us/code/7c79628f-fa76-4b0e-b0d3-38222a35c8be
Sec. 151.92. - Sanitary sewer improvements.
The following requirements shall govern sanitary sewer improvements: (A) Where an adequate public sanitary sewer system is reasonably accessible, public sanitary sewers shall be installed to serve all lots, including lateral connections to the public system. Public sewer system extensions shall meet the requirements of the county combined general health district and city standards. Combinations of sanitary sewers and storm sewers shall be prohibited. (B) Where a public sanitary sewer system is not reasonably accessible, the subdivider may provide: (1) A central treatment plant for the group, provided that such central treatment plant is installed in accordance with the county combined general health district requirements; or (2) Lots may be served by individual disposal systems if the provisions of subsection (C) are met. (C) (1) Where the installation of individual disposal systems is considered the suitability of the soil for individual systems, the absorptive ability of the soil, surface drainage, ground water level, and topography shall be the criteria for determining whether or not the installation of individual systems is permissible. Criteria shall be in accordance with the requirements of the County Combined General Health District and the requirements of the Ohio Department of Health. (2) Each lot so served shall be of a size and shape to accommodate the necessary length of tile field at a safe distance from and at a lower elevation than the proposed building(s). The lot size and shape shall conform to the requirements of the zoning district in which it is located. If no zoning is in effect, the standards set forth in § 151.46 shall be met. (3) At least one percolation test shall be made for each lot area being platted, and each test shall be located in close proximity to the proposed individual sewage disposal unit, be numbered and its location shown on the preliminary plan. All percolation tests shall be performed in accordance with the requirements of the city engineer and the County Combined General Health District. (4) Where the installation of individual disposal units is considered and where the average natural ground slope exceeds ten percent, the installation of a step-up disposal system may be required subject to specification by the County Combined General Health District.
(Ord. 24655, passed 2-20-74; Ord. 32173-25, passed 12-31-25)
Ask a question about Dayton law
Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.