§ 12.08.260 — Excavations for substructures
Code of Ordinances, City of North Las Vegas, Nevada (Supp. No. 146: codified through legislation passed and adopted on or before August 5, 2026) · North Las Vegas Municipal Code § 12.08.260
Corpus is an independent public-information project, not the official City of North Las Vegas website. Stable reference: corpuslaw.us/code/7ceb5194-b39f-475c-a407-78316c799f03
12.08.260 - Excavations for substructures.
All excavation work within a public place shall be in accordance with the latest approved standard drawings, specifications and special conditions required under the permit. A. Trenches. The maximum length of open trench permissible at any time shall be in accordance with existing ordinances, regulations, or standard specifications, and no greater length shall be open for pavement removal, excavation, construction, backfilling, patching and all other operations without the written permission of the engineer. B. Care of Excavated Material and Removal of Unsuitable Material. 1. Any material excavated from trenches and piled adjacent to the trench or in any street shall be piled, and maintained in such manner as not to endanger those working in the trench, pedestrians, or users of the public place, and so that as little inconvenience as possible is caused to those using streets and adjoining property. Where the confines of the area being excavated are too narrow to permit the piling of excavated material beside the trench, such as might be the case in a narrow alley, the engineer shall have the authority to require that the permittee haul the excavated material to a storage site and then rehaul it to the trench site at the time of backfilling. It shall be the permittee's responsibility to secure the necessary permission and make all necessary arrangements for all required storage and disposal sites. 2. All trench and tunnel excavations shall comply with the State of Nevada "Trench and Tunnel Construction Safety Orders" and Nevada "Occupational Safety and Health Act." 3. All material excavated shall be laid compactly along the side of the trench and kept trimmed so as to cause as little inconvenience as reasonably possible to vehicular and pedestrian traffic, or as specified by the engineer. Whenever necessary, in order to expedite the flow of traffic or to abate dirt or dust nuisance, toe boards or binds may be required to prevent the spreading of dirt into traffic lanes. C. Cleanup. As the excavation work progresses, all streets and other public places shall be thoroughly cleaned of all rubbish, excess earth, rock, and other debris resulting from such work. All cleanup operations at the location of such excavation shall be accomplished at the expense of the permittee and shall be completed to the satisfaction of the engineer. From time to time, as may be ordered by the engineer, and in any event, immediately after completion of said work, the permittee shall, at his own expense, clean up and remove all refuse and unused materials of any kind resulting from said work, or upon failure to do so within twenty-four (24) hours after having been notified to do so by the engineer, said work may be done by the City and the cost thereof charged to the permittee. D. Protection of Watercourses. 1. The permittee shall maintain all gutters free and unobstructed for the full depth of the adjacent curb and for at least one foot in width from the face of such curb at the gutterline. Whenever a gutter crosses an intersecting street, an adequate waterway shall be provided and at all times maintained. 2. The permittee shall make provisions to take care of all surplus water, muck, silt, slickings, or other run-off pumped from excavations or resulting from sluicing or other operations. 3. The permittee shall maintain all bridges, drainage channels, storm sewers, and inlets free and unobstructed which may be at or adjacent to the site of the work. E. Breaking Through Pavement. 1. Heavy duty pavement breakers may be prohibited by the engineer when the use endangers existing substructures or other property. 2. Sawcutting of Portland cement concrete may be required by the engineer when the nature of the work or the condition of the street or public place warrants. Sawcutting may be required by the engineer outside of the limits of the excavation over cave-outs, overbreaks and small floating sections. 3. Approved cutting of bituminous pavement surface ahead of excavations may be required by the engineer to confine pavement damage to the limits of the trench. 4. Sections of sidewalks, curbs, gutters, valley gutters or other concrete facilities shall be removed to the nearest score line or joint. 5. Unstable pavement shall be removed over cave-outs and overbreaks and the subgrade shall be treated as the main trench. 6. Pavement edges shall be trimmed to a vertical face and neatly aligned with the center line of the trench. 7. Cutouts outside of the trench lines must be normal or parallel to the trench line. 8. Boring or other methods to prevent cutting of new pavement or pavement on major thoroughfares may be required by the engineer at the time of issuance of the permit. 9. Permittee shall not be required to repair pavement damage existing prior to excavation unless his cut results in small floating sections that may be unstable, in which case permittee shall remove and pave the area. F. Trench Backfilling. Backfilling shall be performed in strict accordance with the latest approved standard drawings and specifications and any special conditions required under the permit. G. Restoration of the Surface. 1. Concrete curbs, gutters and sidewalks shall be reconstructed in accordance with the adopted standard drawings and specifications in force at the time of construction. The widths, depth and type shall meet the existing construction. 2. a. The pavement resurfacing material shall meet or exceed the requirements of the original surfacing, or at the option of the engineer, shall meet the requirements of the standard drawings and specifications for resurfacing. Pavement surfacing or other off-site improvements outside the trench area damaged by the contractor's operations shall be replaced in accordance with the requirements issued by the engineer at the expense of the permittee. b. Temporary resurfacing, when maintained by the permittee, may be permitted by the engineer for a period not to exceed ninety (90) days. c. When an applicant for a permit requests permission for the repair, replacement or new construction of more than one substructure, each of which is situate within two hundred (200) feet of the other or others, within the pavement section of a major street or within the pavement section of any street constructed within five years prior to issuance of the permit, the engineer shall have the authority to require certain additional resurfacing requirements other than replacement of the pavement for the trenched area only. Such additional requirements may be as hereinafter described or such other requirements whether enumerated herein or not. The engineer shall have the authority to require the entire width of the pavement to be overlaid or replaced along the entire length of the construction limits or extended to meet the field conditions as warranted or require special backfill, concrete encasements and pavement replacement requirements which will assure a smooth permanent driving surface upon completion of the excavation repair. 3. Any other facility removed, altered, relocated or damaged by the construction, removal, replacement, or repair of any substructure by the permittee shall be replaced at the expense of permittee and in accordance with the latest approved standard drawings, specifications and special conditions issued by the engineer or the owner of the facility.
(Ord. 655 (part), 1980: prior code § 13.50.270)
Ask a question about North Las Vegas law
Corpus searches the North Las Vegas sections it holds and shows the ones that match, with their citations. Free, no sign-in.