18-0213. - Contractor to be responsible until sidewalk completed.
The contractor shall have charge of and be responsible for the entire work until its completion and acceptance. All sidewalk shall be installed and available for public use, including backfilling, within 14 days of removal of existing sidewalk, unless written permission for a longer time period is granted by the city engineer. Properly skilled workmen only shall be employed on the work; and the contractor shall dismiss any employee who may, in the opinion of the city engineer, be negligent of his duty or who performs his work in an improper manner. The contractor shall, at all times, either be on the work himself or have a competent foreman there who must have all powers of the contractor and to whom orders, instructions, and directions may be given. The contractor shall protect the public from sidewalk removal/construction areas in accordance with the current version of the City of Fargo Standard Specifications for Construction. The contractor shall be responsible for bringing to grade and checking for usability all stop boxes within sidewalk line. Information on locations of stop boxes may be obtained from the city water department.
Source: 1952 Rev. Ord. 1152 (1963), 4806 (2012).