§ 511.100 — Rules for sewer connections

Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 511.100

Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/7e992d19-c301-4cd7-84ba-69eb3e83f84e

511.100. - Rules for sewer connections.

The following rules must be observed and carried out in all work on or relating to sewer connections: (1) Connections with sewers must be made with the wye already put in by the city. Deviations from this requirement may only be made if the city engineer or city engineer's designee gives written consent before any such change is made. (2) Any new connections must be made within the middle third of the interior height of the sewer to which the connection is made. (3) All connection pipes must be laid in a true line from the sewer to the curb. (4) All joints of sewer pipes must be made in the best available manner and to the satisfaction of the city engineer or city engineer's designee. (5) After the pipe is properly laid and inspected, the backfilling must proceed at once and it must be thoroughly tamped, and so done that there shall be no surplus earth left. (6) Should there be a deficiency of earth to fill the excavation, then the plumber or person doing such work must supply such deficiency with clean sand or other material approved by the city engineer or city engineer's designee. (7) No rock of any sort larger than four (4) inches in any direction may be put into any excavation. (8) Right-of-way restoration shall be done in accordance with excavation permit requirements. Such restoration shall assure that the general area is returned to the same condition that existed before the commencement of the work and that the work is performed in accordance with the standards and with the materials specified by the city engineer or city engineer's designee. (9) All work must be done under the supervision of an inspector named by the city engineer. (10) Any sanitary sewer service lateral installed between the public sanitary sewer system main and the right-of-way line must be laid at a depth of not less than nine (9) feet as measured to the top of the pipe at the curb line. Any sanitary sewer pipe installed between the right-of-way line and the building line must be laid at a depth of not less than seven (7) feet as measured to the top of the pipe at the building line.

(Ord. No. 2018-055, § 9, 10-19-18)