§129.0405 General Rules for Plumbing/Mechanical Permits

(a) A Plumbing/Mechanical Permit shall be obtained before work is started except in cases where emergency or urgent necessity can be shown to exist, in which case a permit shall be obtained within 2 business days of beginning work. (b) A separate Plumbing/Mechanical Permit is required for each building in which rough work for a plumbing fixture, or heating, ventilating, air conditioning, or refrigeration is installed, except in the case of an unoccupied accessory building or a garage that is part of the plumbing system of a single dwelling unit. (c) No privately owned lines, equipment, duct work, or other facilities shall be installed over, under, or across any public property without first complying with the requirements in Municipal Code Chapter 6, Article 2. (d) The Building Official may withhold permission to install or operate any gas or electrical meter for a structure until the structure is approved for occupancy. (e) The Building Official shall inspect, and reinspect as the Official determines to be necessary, all plumbing, heating, ventilating, air conditioning, or refrigeration system installations and shall keep complete records of all permits, inspections, and reinspections.

(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.)