Sec. 7-194. - Deletions, modifications and amendments.
The International Building Code 2018 edition, Chapters 1—12 and 14—31; 33; 34; and 35 and appendix "C", as adopted in this division, are deleted, modified and amended as follows:
(1) Delete subsection 101.4.4 "Property Maintenance", in its entirety.
(2) Delete subsection 101.4.5 "Fire Prevention", in its entirety.
(3) Amend subsection 101.4.6 "Energy", to read.
The current State of Alabama Commercial Energy Code as adopted by the Alabama Energy and Residential Codes Board shall apply to all matters governing the design and construction of buildings for energy efficiency. The compliance to the current State of Alabama Commercial Energy Code must be verified by a State of Alabama Licensed Third-Party Energy Consultant or a State of Alabama Registered Design Professional
(4) Amend subsection (A)102.6. "Existing Structures", to read:
"The legal occupancy of any structure existing on the date of adoption of this code shall be permitted to continue without change, except as is specifically covered in this code, or as deemed necessary by the building official for the general safety and welfare of the occupants and the public."
(5) Amend subsection (A) 103.3 "Deputies" to read:
"In accordance with the prescribed procedures of this jurisdiction and with the concurrence of the appointing authority, the building official shall have the authority to appoint a deputy building official, the related technical officers, inspectors, plan examiners, and other employees. Such employees shall have powers as delegated by the building official.
(6) Delete subsection [A] 104.10.1 "Flood hazard areas." in its entirety.
(7) Delete subsection [A] 105.1.1 "Annual Permit", in its entirety.
(8) Delete subsection [A] 105.1.2 "Annual Permit Records", in its entirety.
(9) Delete subsection [A)]105.2 "Work Exempt Form Permit", in its entirety.
(10) Delete subsection [A] 105.2.3 "Public Service Agencies", in its entirety.
(11) Amend section [A] 105.3 to include item #8, "Include a contract indicating the cost of the proposed work to be signed by the property owner, building owner and by the builder or contractor proposing to complete work indicated in contract."
(12) Delete section [A] 108 "Temporary Structures and Uses", in its entirety.
(13) Amend subsection 109.3 "Building Permit Valuations" to read:
Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment and other permanent systems, including materials and labor.
Building permits for the construction of, alterations to, repairs to, and/or additions to, buildings or other structures governed by this code shall be assessed in the following manner:
(a) For new construction of, alterations to, repairs to, and/or additions to, buildings or to other structures governed by this code, the permit fee shall be the greater of $50.00 or the amount of the total contract price multiplied by .0055 of the full estimated cost of work for each building or structure; however, this section shall not apply to the repair of any building whenever the reasonable cost of the material and labor for such repair is not in excess of $250.00 and no structural work is involved.
(b) For the moving of any building or structure, the fee shall be $25.00
(c) For the demolition of interior or partial demolition of commercial buildings and structures, the fee shall be $50.00.
(d) For the full demolition of commercial buildings or structures, the fee shall be $100.00.
(e) For retaining walls constructed of any material and retaining more than four feet of earth above the footing, the permit fee shall be the greater of $50.00 or the contract amount of the wall construction multiplied by .0055.
If for any reason an installation does not pass inspection, an additional inspection shall be made after the installation has been changed so as to conform to the requirements set forth in the article. A re-inspection fee may be charged at the rate as follows: 1 st re-inspection $25.00, 2 nd re-inspection $50.00, 3 rd re-inspection $75.00, 4 or more re-inspections $100.00.
(14) Delete subsections (A) 110.3.1 through (A) 110.3.6.
Amend subsection (A) 110.3. "Required inspections" to read
BUILDING
(1) Footing Inspections: Inspections are required for setbacks, footing depth and widths, and steel rebar.
(2) Monolithic Slabs: This inspection is to take place after plumbing and electrical inspections if applicable.
(3) Foundation Inspection: Made after grading of crawlspace area, placement of piers, anchor bolts, 4" drain and installation of floor system prior to installing subflooring.
(4) Pre-insulation Inspection: This inspection is to be made when shingles, sheathing, windows and doors are installed. Mechanical, electrical, plumbing, and gas inspections need to be made "if applicable", prior to this inspection. Brick ties should be installed over a moisture impermeable house wrap. When this inspection has passed, brick and insulation may be installed.
(5) Framing Inspection: This inspection is to be made after any framing corrections have taken place and after the building has been insulated. If framing corrections have been made, the framing inspection will be passed, and drywall may be installed.
(6) Temp 30: To obtain power to the structure, an affidavit must be signed by the contractor, permanent building number posted, and building can be locked. Building cannot be occupied until receipt of the Certificate of Occupancy.
(7) Above Ceiling Inspection: This inspection, (typically applicable on commercial projects), is to be done after all trade inspections and is to view ceiling supports, fire caulking of rated walls and penetrations. If acoustical ceiling is not to be used this inspection is still mandatory for fire caulk inspection prior to painting walls.
(8) Final Inspection: When the building has been completed and mechanical, electrical, plumbing, and gas inspections "if applicable" have been completed, you may request the building final inspection.
ELECTRICAL
(1) Slab Inspection: If any electrical lines are installed in the slab or concealed in concrete walls.
(2) Underground: All conduits and direct burial cable placed in the ground must be inspected prior to covering.
(3) Rough-in Inspection: When wires are pulled and stapled prior to installation of sheetrock, "No insulation is to be installed prior to rough-in inspection." All areas of renovations where sheetrock has been removed will also require a rough-in inspection.
(4) Temp 30: The following are required: permanent house numbers, the building is lockable, the meter base and main panel are installed, and a receptacle with GFCI protection.
(5) Final Inspection: When all fixtures, plugs and appliances are installed. All electrical work should be completed at this time.
(6) Electrical Final for HVAC (If separate): Air conditioning final to be made when all electrical lines and disconnects are completed to heat and air units.
MECHANICAL & GAS
(1) Slab: To be made if gas lines or mechanical work is run under or through the slab. Inspection is to be made before the work is covered.
(2) Rough-In Inspection/Wall Rough: When all gas lines and refrigeration lines that are to be concealed are run inside structure prior to insulation and drywall. All ductwork in concealed locations must be inspected prior to installation of drywall.
(3) Above Ceiling Inspection: This inspection, (typically applicable on commercial projects), is to be done after grid is installed and before ceiling tiles are placed. Inspection will verify equipment installation, service clearances, fire dampers, duct work and registers.
(4) Final Inspection: When all gas appliances are installed and completed, and all mechanical work finished. Service clearance area around all indoor and outdoor units must be provided based on code and manufacturer requirements.
PLUMBING
(1) Slab: To be made before gravel and poly are installed over pipes and water lines.
(2) Sewer/Water Lines: To be made before sewer lines and water lines are covered.
(3) Rough-in: To be made when all plumbing pipes are stubbed-out and pressure tested prior to sheetrock being hung. (No insulation is to be installed prior to this inspection.)
(4) 30 Day Temporary: To be made when the sewer and rough ins have been passed. (This inspection must be requested by the plumber.)
(5) Final: To be made when fixtures are set, and plumbing is completed and in working order.
(15) Amend subsection 110.3.8 "Energy Efficiency Inspections" to read "The compliance to the Current State of Alabama Energy Code must be verified by a State of Alabama Licensed Third-Party Energy Consultant or a State of Alabama Licensed Design Professional."
(16) Delete subsection [A] 111.3 "Temporary Occupancy" in its entirety.
(17) Delete section [A] 113 "Board of Appeals" in its entirety.
(18) Amend subsection 201.3 "Terms defined in other codes" to read:
"Where terms are not defined in this code such terms shall have the meanings ascribed in other codes publications of the International Code Council and as defined per NFPA 70".
(19) Amend Section 202 "Definitions" The following definition to read as:
"[A] Townhouse/Townhome. A single-family dwelling unit constructed in a group of three or more attached units in which each unit extends from foundation to roof and with a yard or public way on not less than two sides. Structures which are constructed as a Single-family dwelling unit as noted in this definition, in which each individually single-family dwelling unit doesn't reside on its own fee simple lot shall be consider an apartment type R-2 occupancy and must follow the International Building Code.
(20) Amend subsection 603.1.3 "Electrical" to read:
"The use of electrical wiring methods with combustible insulation, tubing, raceways and related components shall be permitted when installed in accordance with the limitations of NFPA 70.
(21) Amend subsection [F] 903.2.9 "Group S-1" to read:
An automatic sprinkler system shall be provided throughout all buildings containing a Group S-1 occupancy where one of the following conditions exists:
1. A Group S-1 fire area exceeds 12,000 square feet (1115 m2).
2. A Group S-1 fire area is located more than three stories above grade plane.
3. The combined area of all Group S-1 fire areas on all floors, including any mezzanines, exceeds 24,000 square feet (2230 m2).
4. A Group S-1 fire area used for the storage of commercial motor vehicles where the fire area exceeds 5,000 square feet (464 m2).
5. A Group S-1 occupancy used for the storage of upholstered furniture or mattresses exceeds 2,500 square feet (232 m2).
Exception: Self-service storage facilities not greater than one story above grade where all storage spaces can be accessed directly from the exterior.
(22) Amend subsection 1404.11.4 "Grounding" to read:
"Grounding of metal veneers on buildings shall comply with the requirements of the NFPA 70."
(23) Delete subsection 1603.1.6 "Flood design data" in its entirety.
(24) Delete subsection 1612 "Flood Loads" in its entirety.
(25) Delete subsection 1804.5 "Grading and Filling in Floodways" in its entirety.
(26) Amend subsection 1808.7 "Footings on or Adjacent to Slopes" to read:
"On all building sites in the slope development district and other sites with identifiable or suspected potentially unstable subsurface soil conditions, the building applications for permitting shall be accompanied by a geotechnical study conducted by and bearing the expertise in the science of soil mechanics.
The test and analysis requirements shall be as set forth in the slope development study, section VIII, subsection C, paragraph 4 as follows:
(A) Geotechnical studies: field and laboratory.
(1) Field studies:
(a) Residential lots: borings as required per design geotechnical study.
(b) Acceptable subsurface exploration methods: test pit excavations; soil test borings; mechanical or electrical cone borings.
(c) Rock coring, if required: Minimum of five feet of rock coring per boring.
(d) Soil and rock classification according to (ASTM) procedures.
(2) Minimum soil properties tests (natural or fill soils):
(a) Shear strength (as required for analysis).
(b) Standard classification tests (ASTM).
(c) Consolidation tests (as required).
(d) Shrink/swell potential (if applicable).
(3) Groundwater data: Each boring shall be measured for groundwater.
(4) Analyze slope stability and structure performance:
(a) Stability analyses should be performed on the best, worst, and average soil and embankment conditions:
1) Sliding wedge and slip circle analyses should be performed on the uphill side of any cut embankment.
2) Slip circle analyses should be performed on all fill embankments.
(b) Based on the analyses, the lowest safety factors should be reported for each method along with all of the design conditions.
(c) Structure performance should be analyzed with respect to bearing capacity and settlement.
The application shall contain a design footing and foundation meeting the requirements set forth in the adopted slope development study, section VIII, subsection C, paragraph 5 as follows:
(5) Recommended design standards:
(a) Safety factors for stability: Minimum safety factor of 1.5 with adequate data, including triaxial shear tests, multiple analyses (sliding wedge infinite slope and slip circle analyses) and confident groundwater (piezometer) measurements and control.
(b) Where soil and rock data indicated a large variation in strength, analyses should be reported for the worst conditions encountered. Safety factor for bearing capacity: Minimum safety factor of 3.0.
High continuous brick walls | .0005—0.001
One-story brick buildings | .001
Reinforced concrete frame | .0025
Reinforced concrete curtain wall | .003
Steel Frame, continuous | .002
Steel Frame, simple | .005
(c) Allowable settlement: maximum settlement between column footings shall not exceed the angular distortion ration D/L (D-deflection inches, L—length between columns inches) as follows: Limiting Settlement
(d) Expansive soils: 2018 International Residential Code Subsection R403.1.8 sets requirements and Section 1805.8 of the 2018 International Building Code.
This design must be performed by, and bear the seal of, an engineer or architect registered in the state.
The engineer or architect shall inspect and certify that, to the best of his knowledge, the construction of the footing and foundation has been accomplished according to the required design. The certification must be on record before a certification of occupancy can be issued."
(27) Delete subsection 1808.7.1 "Building Clearance from Ascending Slopes" in its entirety.
(28) Delete subsection 1808.7.2 "Footing Setback from Descending Slope Surface" in its entirety.
(29) Delete 1808.7.3 "Pools" in its entirety.
(30) Amend subsection 1907.1 "General" to read:
The thickness of concrete floor slabs supported directly on the ground shall be not less than 31/2 inches (89 mm). A 6-mil (0.006 inch; 0.15 mm) polyethylene vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used to retard vapor transmission through the floor slab.
Exception: A vapor retarder is not required:
1. For detached structures accessory to occupancies in Group R-3, such as garages, utility buildings or other unheated facilities.
2. For buildings of other occupancies where migration of moisture through the slab from below will not be detrimental to the intended occupancy of the building.
3. For driveways, walks, patios and other flatwork that will not be enclosed at a later date.
4. Where approved based on local site conditions.
(31) Amend subsection 2701.1 "Scope" to read:
"The provisions of this chapter and NFPA 70 shall govern the design, construction, erection and installation of the electrical components, appliances, equipment and systems used in buildings and structures covered by this code. The International Fire Code, and the NFPA 70 shall govern the use and maintenance of electrical components, appliances, equipment and systems. The International Existing Building Code and NFPA 70 shall govern the alteration, repair, relocation, replacement and addition of electrical components, appliances, or equipment and systems."
(Ord. No. 21-1006, § 2, 11-18-2021, eff. 1-1-2022)