For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 151.154 — INSTALLATION OF ELECTRIC VEHICLE-CHARGING INFRASTRUCTURE REQUIRED

City of Hollywood, Florida, Code of Ordinances (2026 S-52: current through Ordinance O-2026-12, passed 7-7-26) · Hollywood, Fla., City Code § 151.154

Corpus is an independent public-information project, not the official City of Hollywood website. Stable reference: corpuslaw.us/code/7fa8686c-1175-49c4-b3c3-37d3be0e9854

§ 151.154 INSTALLATION OF ELECTRIC VEHICLE-CHARGING INFRASTRUCTURE REQUIRED.

The city shall require each person or entity desiring to construct a new commercial or residential structure to construct the infrastructure necessary for future installation of an electric vehicle-charging station within be included in such project. Minimally, the following shall be installed: an empty three-quarter-inch raceway from the branch circuit panel board to a location in the garage or a designated parking area, with a two-gang junction box with a blank plate; or a fully functional electric vehicle-charging station. (Ord. O-2011-06, passed 2-16-11; Am. Ord. O2016-02, passed 1-20-16)

Ask a question about Hollywood law

Corpus searches the Hollywood sections it holds and shows the ones that match, with their citations. Free, no sign-in.