Same—Waiver or modification to the requirements for underground installation.
Gilbert Town Code § 10-254
in effectSec. 10-254. - Same—Waiver or modification to the requirements for underground installation.
The development engineering manager, upon petition by a developer and prior to construction plan approval, may accept an in-lieu payment on behalf of the town or grant a waiver to the requirements for underground installation of existing or new utility lines.
All new utility lines shall be installed underground, even though relief for adjacent existing utility lines may be granted by the development engineering manager.
The development engineering manager's decision to accept an in-lieu payment or to grant a waiver shall include, but not be limited to, review and analysis of the following factors:
(1) The extent of existing overhead lines and poles in the immediate area of the project.
(2) The location and heights of such poles and wires and their relation to present and future developments, including but not limited to schools, churches, commercial areas or other places where people congregate.
(3) If overhead lines are co-located with transmission wires (69 kV or larger).
(4) The aesthetics of that portion of the town, should the lines be installed overhead instead of underground.
(5) The extent of existing developed and undeveloped property in the area, including the potential impact on future development expected in the area.
(6) The practicality and feasibility of underground installation with due regard for the comparative costs between underground and overhead installations; however, a mere showing that an underground installation is more costly than overhead shall not be the sole criteria for granting a waiver.
Waivers shall only be considered under the following circumstances:
(1) In a residential area with distribution (12 kV) and/or communication lines co-located with transmission lines (69 kV or greater), more than 50 percent of the developed frontage within one-quarter mile on each side of the project must have existing overhead utility lines; or
(2) In a non-residential area with distribution (12 kV) and/or communication lines co-located with transmission lines (69 kV or greater), more than 50 percent of the developed frontage within one-eighth mile on each side of the project must have existing overhead utility lines; or
(3) The cost of undergrounding the overhead power lines is at least 30 percent of the valuation of the project based on the valuation methodology used in the adopted building code for assessing building permit fees. The developer shall obtain from the appropriate utility companies a reliable estimate of the current cost for undergrounding that is required along the development frontage, including new and existing lines in the adjacent offsite frontage.
If an in-lieu payment is authorized by the development engineering manager, the developer shall deposit with the town an approved in-lieu fee in an amount sufficient to cover all undergrounding and restoration that is required. Such in-lieu fee shall be paid by the developer as a condition of final plat approval (residential development) or approval to construct (non-residential development). At the time the in-lieu payment is made, the developer shall enter into a development agreement with the town, defining the terms and conditions of the town's use of the funds, as well as the expiration date and any terms for reimbursement of the in-lieu fees to the developer. The development agreement shall provide a minimum ten-year and a maximum 20-year period during which the town shall use the in-lieu fees.
If an in-lieu payment or waiver is denied by the development engineering manager, the developer may appeal the decision to the town council. If an in-lieu payment or waiver is approved by the development engineering manager, any interested party may appeal the decision to the town council. An interested party for the purpose of this section is any person who is affected by the decision and has standing to appeal pursuant to state law. Appeals must be submitted in writing to the town clerk no later than 30 calendar days following the decision of the development engineering manager.
(Ord. No. 2673, § I, 6-21-18)