§ 42-61 — Connection fees payable
Code of Ordinances, City of Olive Branch, Mississippi (Supp. No. 14: codified through Ordinance of June 17, 2025) · Olive Branch Code of Ordinances § 42-61
Corpus is an independent public-information project, not the official City of Olive Branch website. Stable reference: corpuslaw.us/code/80d90bfa-ff56-4219-96c5-d4d6a9faeddc
Sec. 42-61. - Connection fees payable.
Water, Sewer and Gas connection fees are payable before the meter is set. (1) Water: (a) Commercial/Residential Development- must provide drawings to the Public Works Department, make connection, set yolk and meter box/pit. Customer is responsible for own service line. (b) Residential Not in New Development - the city will make connection, set yolk and meter box. Customer is responsible for own service line. (2) Gas: Commercial - must provide drawings to the Public Works Department, make connection, and run service lines. The city will inspect gas pressure and set meter. (a) Residential Development - the city will run service line from tap, inspect gas pressure and set meter. Tap must be located before the city begins. A gas inspection must be performed before meter can be set. (b) Residential - the city will make connection, run service line and inspect gas pressure and set meter. A gas inspection must be performed before the meter can be connected. A monthly bill will be collected for each meter after it has been installed. There will be no sewer fee on construction water used by the contractor and/or builder until the structure is sold. Residents building own home will be charged sewer 90 days after connection of city water or 90 days after connection fee is paid. Existing homes connecting to sewer will be charged as of connection date or within 90 days of date connection fee is paid.
(Ord. of 4-16-24(1), § III)
Ask a question about Olive Branch law
Corpus searches the Olive Branch sections it holds and shows the ones that match, with their citations. Free, no sign-in.
