28.30.040 - Ownership, design, and construction of the electric utility system.

The Electric Utility System installed or operated by San José Power will be the sole property of the City. The Electric Utility System will meet the design and construction standards consistent with Title 27 of the Code and will be installed to the satisfaction of the Director of Public Works.

(Ord. 30956.)