§ 33.865.040 — Supplemental Application Requirements

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.865.040

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/825b2e8b-8350-4fb9-b06e-0d01e10ba0ec

33.865.040 Supplemental Application Requirements

In addition to the application requirements of Section 33.730.060, the following information is required when the River Review application is for development in the River Environmental overlay zone, or for modification of the River Environmental overlay zone boundary: A. Supplemental site plan requirements. Two physical copies and one PDF of each required site plan must be submitted. The site plans must show the entire site, must be drawn accurately to a scale that is between 1 inch to 50 feet and 1 inch to 10 feet, and must show all property lines with dimensions, a north arrow and a date. Additional site plans that show only a portion of the site may be submitted. All copies of site plans must be suitable for reproduction on paper no smaller than 8.5 x 11 inches and no larger than 36 x 48 inches. The Director of PP&D may waive items listed in this subsection if they are not applicable to the specific review; otherwise they must be included. Additional information such as wetland characteristics or soil type may be requested through the review process. 1. Existing conditions site plan. The existing conditions site plan must show the following: a. Location of any wetlands or water bodies on the site or within 50 feet of the site. Indicate the location of the top of bank, including structures and topographic contours referenced to determine top of bank, centerline of stream, ordinary high water, or wetland boundary as appropriate. See Section 33.910.030, Environmental-Related Definitions, Top of Bank. In the case of a violation, also identify the location of the wetland or water body prior to alteration; b. Combined flood hazard area and floodway boundaries. In the case of a violation, also identify the location of the 100-year floodplain and floodway prior to alteration; c. The boundaries of the riparian buffer area. See Map 475-6. d. Drainage patterns, using arrows to indicate the direction of major drainage flow; e. Boundaries of the River Environmental overlay zone. These boundaries may be scaled in relation to property lines from the Official City Zoning Maps; f. Within the River Environmental overlay zone: (1) Distribution outline of shrubs and ground covers, with a list of most abundant species; and (2) Trees over 1.5 inches in diameter identified by species and size, including the location and size of the trunk, canopy crown diameter and the root protection zone. In the case of a violation, also identify the trees that were cut or damaged by showing a stump diameter and species; g. Outside of the River Environmental overlay zone, trees over 3 inches in diameter, including the location of the trunk and canopy crown cover, identified by species and size; h. Location and boundaries of designated scenic resources. The location of viewpoints, view corridors and scenic corridors must be show in relation to the property lines, existing and proposed public trails and boundaries of the River Environmental overlay zone; i. Topography shown by contour lines at 2 foot vertical contours in areas of slopes less than 10 percent and at 5 foot vertical contours in areas of slopes 10 percent or greater. In the case of a violation, also identify the topography prior to alteration; and j. Existing improvements such as structures, buildings, utility lines, stormwater systems, septic or sewer facilities, fences, etc. 2. Proposed development site plan. The proposed development site plan must show the following: a. Location of the River Environmental overlay zone, the top of bank and river setback areas, the boundary of the riparian buffer area, and the landscaping area subareas; b. Location of all proposed development including buildings, structures, decks, retaining walls, bridges, trails/pathways; c. Location of proposed utility lines and connections, stormwater systems and septic or sewer facilities; d. Location of all proposed in-water pilings, sheet walls, or other structures that will impact the river bottom using a bold X; e. Location of protected scenic resources; f. Delineation and total square footage of temporary and permanent disturbance areas including equipment maneuvering areas; g. Delineated areas of vegetation removal and identification of trees to be removed using a bold X; h. Proposed final contour lines at 2 foot vertical intervals in areas of slopes less than 10 percent and at 5 foot vertical contours in areas of slopes 10 percent or greater; i. Location of excavation and fill and total quantities of each, including balanced cut and fill calculation for any grading in the combined flood hazard area; j. Delineated areas to be left undisturbed; and k. Location and species of existing trees, shrubs, and ground covers to remain including the required root protection zone per Title 11. 3. Construction management site plan. The construction management site plan must show the following: a. Location of the River Environmental overlay zone, the top of bank and river setback areas, the boundary of the riparian buffer area, and the required landscaping area subareas; b. Delineation and total square footage of temporary and permanent disturbance areas including equipment maneuvering areas; c. Proposed grading plan with existing and proposed contours. The grading plan must show proposed alteration of the ground at 2-foot vertical contours in areas of slopes less than ten percent and at 5-foot vertical contours in areas of slopes ten percent or greater; d. Location of excavation and fill and total quantities of each, including balanced cut and fill calculation for any grading in the combined flood hazard area; e. Location of all proposed development; f. Delineated areas of vegetation removal and identification of trees to be removed using a bold X; g. Areas where existing topography and vegetation will not be affected by the development proposal; h. Location of trees to remain including the required root protection zone per Title 11; i. Location of site access and egress; j. Material staging and stockpile areas; and k. Erosion control measures. 4. Mitigation or remediation site plan. A mitigation site plan is required when the proposed development will result in unavoidable significant detrimental impact on the resources and functional values identified in the Willamette River Central Reach Natural Resources Protection Plan (2018), River Plan / South Reach Natural Resources Protection Plan (2020) or when mitigation is proposed in order to meet River Review approval criteria. A remediation site plan is required when significant detrimental impacts occur in violation of the Zoning Code and no permit was applied for. The on- site or off-site mitigation or remediation site plan must show the following: a. Location of the River Environmental overlay zone and riparian buffer area in relation to the mitigation site; b. Distribution outline, species composition, and percent cover of ground covers to be seeded or planted using standard landscape graphics; c. Location, species, and size of each individual tree to be planted; d. A planting table listing the size, number, and species (common and scientific) of all trees, shrubs, groundcover or seeds to be installed; e. The area of the mitigation site in square feet in relation to the project impact area; f. The location of the mitigation site in relation to existing, proposed or anticipated future development on the site; g. Stormwater management features, including retention, infiltration, detention, discharges, and outfalls; h. Location of any single piles or multiple-pile dolphins that will be removed; i. Location of protected viewpoints and scenic overlay zones; j. Water bodies to be created, including centerline, top of bank, wetland boundary and depth; k. Water sources to be used, including volumes; l. Location of excavation and fill and total quantities of each including balanced cut and fill calculation for any grading in the combined flood hazard area; and m. Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings. B. Supplemental narrative. The following is required: 1. Impact evaluation. An impact evaluation is required to determine compliance with the approval criteria, and to evaluate practicable development alternatives for a particular site. The alternatives must be evaluated on the basis of their impact on identified resources and functional values. Significant resources and functional values are identified in the Willamette River Central Reach Natural Resources Protection Plan (2018) and River Plan / South Reach Natural Resources Protection Plan (2020). A

![](https://figures.74-208-44-221.nip.io/portland/20261114/d24aae6df5f70d39faebe6de2f627dc1bc55831cd312b31448df7d23846f05f0.png)

supplemental environmental assessment can be provided to more accurately identify resources and functional values on the site. In the case of a violation, the impact evaluation is used to determine the nature and scope of the significant detrimental impacts. a. An impact evaluation includes: (1) Identification, by characteristic and quantity, of the natural resources and their functional values found on the site. The Willamette River Central Reach Natural Resources Protection Plan (2018) and River Plan / South Reach Natural Resources Protection Plan (2020) provide site-specific information on the natural resource features including: • open water; • shallow water (river depth 0-20 feet); • beach; • riparian vegetation; • upland and bottomland forest; • grassland; • flood area and floodplain; • wetlands, streams and ponds; and • special habitat area. The Willamette River Central Reach Natural Resources Protection Plan (2018) and River Plan / South Reach Natural Resources Protection Plan (2020) provide site-specific information on the functional values provided by the various natural resource features including: • Microclimate and shade; • Stream flow moderation and water storage; • Bank function, and sediment, pollution and nutrient control; • Large wood and channel dynamics; • Organic inputs, food web and nutrient cycling; • Fish and wildlife habitat; and • Habitat connectivity/movement corridor. The Willamette River Central Reach Natural Resources Protection Plan (2018) and River Plan / South Reach Natural Resources Protection Plan (2020) also provide information on wildlife and plant special status species that are known or reasonably expected to occur within or use a site. The application must contain current information regarding any special status species known or expected to occur on the site; (2) Identification and description of the scenic resources on the site. Scenic resources are mapped on the official zoning maps with the Scenic overlay zone and are described in the Central City Scenic Resources Protection Plan (2018) and River Plan / South Reach Scenic Resources Protection Plan (2020); (3) Identification of significant unavoidable detrimental impacts on identified natural and scenic resources and functional values. Actions that could cause detrimental impacts and should be identified include: • excavation and fill both in the water and above the ordinary high water mark. The quality and source of fill material is an important factor to be considered; • clearing and grading; • construction; • vegetation removal; • tree planting; • altering bathymetry; • altering a vegetated riparian corridor or upland vegetated area; • altering the floodplain; and • altering the temperature of the river especially the altering of existing cold water sources. (4) Evaluation of practicable alternative locations, design modifications, or alternative methods of development that both achieve the project purpose, taking into account cost and technology, and minimize significant detrimental impacts on identified natural and scenic resources and functional values; and (5) Determination of the practicable alternative that best meets the applicable approval criteria. b. An impact evaluation for a violation includes: (1) Description, by characteristics and quantity, of the natural and scenic resources and functional values on the site prior to the violation; and (2) Determination of the impact of the violation on the natural and scenic resources and functional values. 2. Biological assessment. A biological assessment developed for the purposes of a federal or state permit may be submitted in place of some or all of the impact evaluation if the biological assessment includes the information described in subparagraph B.1, above. In the event that the applicant submits a biological assessment in place of some or all of the impact evaluation, the applicant must identify which aspects of the impact evaluation are covered by the biological assessment and, if necessary, identify which pieces of information will be included in the impact evaluation. 3. Supplemental environmental site assessment. A site-specific environmental assessment, prepared by a qualified consultant, to more precisely determine the existence, location, type, extent, and quality of the natural resources and functions on the site can be provided as part of the supplemental narrative. The assessment may verify, supplement, or challenge the information in the City's inventory for the purpose of informing the impact evaluation and identifying mitigation obligations; 4. Construction management plan. Identify measures that will be taken during construction or remediation to protect the remaining natural and scenic resources and functional values at and near the construction site and provide a description of how areas that are not affected by the construction will be protected. For example, describe how trees will be protected, erosion controlled, construction equipment controlled, and the timing of construction; and 5. Mitigation or remediation plan. The purpose of a mitigation or remediation plan is to compensate for unavoidable significant detrimental impacts on identified natural and scenic resources and functional values that result from the chosen development alternative or violation. A mitigation or remediation plan includes: a. Natural or scenic resources and functional values to be restored, created, or enhanced within mitigation or remediation area; b. Documentation of coordination with appropriate local, regional, special district, state, and federal regulatory agencies; c. Construction timetables; d. Operation and long-term maintenance plan; e. Monitoring and evaluation procedures that include periodic reporting; f. Remedial actions for unsuccessful mitigation; g. Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings; h. If off-site mitigation is proposed, demonstration that on-site mitigation is not practicable or ecologically beneficial; and i. If mitigation bank credits will be used, proof of purchase from a City-approved mitigation bank.