For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2-66 — Monitoring of industrial discharges

Code of Ordinances, City of Southaven, Mississippi (Supp. No. 70: codified through Resolution of June 2, 2026) · Southaven Code of Ordinances § 2-66

Corpus is an independent public-information project, not the official City of Southaven website. Stable reference: corpuslaw.us/code/845ead5a-bb24-4b6b-9cb4-a78c90bbfade

Sec. 2-66. - Monitoring of industrial discharges.

(a) Applicability. This section applies to all facilities that have stormwater discharges associated with industrial activity, including construction activity. (b) Access to facilities. The AEA shall be permitted to enter and inspect facilities subject to regulation under this title as often as may be necessary to determine compliance with this title. If a discharger has security measures in force which require proper identification and clearance before entry into its premises, the discharger shall make the necessary arrangements to allow access to representatives of the AEA. Facility operators shall allow the AEA ready access to all necessary areas of the premises for the purposes of inspection, sampling, examination and copying of records that must be kept under the conditions of an NPDES permit to discharge stormwater, and the performance of any additional duties as defined by state and federal law. The AEA shall have the right to set up on any permitted facility such devices as are necessary in the opinion of the AEA to conduct monitoring and/or sampling of the facility's stormwater discharge. The AEA has the right to require the discharger to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure stormwater flow and quality shall be calibrated to ensure their accuracy. Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the operator at the written or oral request of the AEA and shall not be replaced except as permitted by the AEA. The costs of clearing such access shall be borne by the operator. Unreasonable delays in allowing the AEA access to a permitted facility is a violation of a stormwater discharge permit and of this title. A person who is the operator of a facility with a NPDES permit to discharge stormwater associated with industrial activity commits an offense if the person denies the AEA reasonable access to the permitted facility for the purpose of conducting any activity authorized or required by this title. If the AEA has been refused access to any part of the premises from which stormwater is discharged, and he/she is able to demonstrate probable cause to believe that there may be a violation of this title, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this title or any order issued hereunder, or to protect the overall public health, safety, and welfare of the community, then the AEA may seek issuance of a search warrant from any court of competent jurisdiction. (c) Sampling at industrial facilities. Samples of stormwater collected for compliance monitoring shall be representative of the discharge. Sampling locations will be those defined in the NPDES permit. Sampling and analyses shall be in accordance with 40 CFR Part 122.21 and 40 CFR Part 136 and/or applicable permit language. Samples that may be taken by the AEA and/or his designated representatives for the purpose of determining compliance with the requirements of this title or rules adopted hereunder may be split with the discharger if requested before the time of sampling. The AEA may require a stormwater discharger to install and maintain at the discharger's expense a suitable manhole or sampling facility at the discharger's facility or suitable monitoring access to allow observation, sampling, and measurement of all stormwater runoff being discharged into the City of Southaven storm drainage system. Sampling manhole or access shall be constructed in accordance with plans approved by the division and shall be designed so that flow measurement and sampling equipment can be installed. Access to the manhole or monitoring access shall be available to the AEA and/or his designated representatives at all times.

(Ord. of 12-6-05)

Ask a question about Southaven law

Corpus searches the Southaven sections it holds and shows the ones that match, with their citations. Free, no sign-in.