For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 301 — Scope and definitions

Tulsa Revised Ordinances (Supp. No. 3, Update 2: codified through Ordinance No. 25794, passed May 13, 2026) · Tulsa Revised Ordinances tit. 11-A, § 301

Corpus is an independent public-information project, not the official City of Tulsa website. Stable reference: corpuslaw.us/code/84cd8be0-6ed4-4aa8-9aa0-d266fb65495f

Section 301. - Scope and definitions.

A. Scope. The provisions of this chapter shall apply to and be binding upon every person, firm, agency, institution or corporation, and every entity which seeks to develop, redevelop, grade, regrade, excavate, landfill, berm or dike land subject to the jurisdiction of the City. B. Definitions. For purposes of this chapter, the following words and phrases shall have the meanings given herein: 1. Alter or alteration of a watercourse means any change to the stormwater drainage system or to the land surface which changes the conveyance capacity of the stormwater drainage system. 2. Appeal means a request for a review of the Director's interpretation of any provision of this chapter or a request for a variance. 3. Area of shallow flooding means a designated AO, AH or VO zone on the City's Flood Insurance Rate Map (FIRM) with a one percent (1%) or greater annual chance of flooding to an average depth of one (1) to three (3) feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. 4. Area of special flood hazard is the land in the floodplain within the City subject to a one percent (1%) or greater chance of flooding in any given year. The area may be designated as Zone A on the Flood Hazard Boundary Map (FHBM). After detailed rate making has been completed in preparation for publication of the FIRM, Zone A usually is refined into Zones A, AE, AH, AO, A1-99, VO, V1-30, VE or V. (See Flood Hazard Area) 5. Base flood means the flood having a one percent (1%) chance of being equaled or exceeded in any given year and is the regulatory flood. 6. Base flood elevation means the elevation shown on the Flood Insurance Rate Map (FIRM) and found in the accompanying Flood Insurance Study (FIS) for Zones A, AE, AH, A1-30 and AR that indicates the water surface elevation resulting from the flood that has a one percent (1%) chance of equaling or exceeding in any given year - also called the base flood. 7. City Drainage Standards are the criteria, standards and specifications for stormwater drainage, earth change and floodplain development adopted by the City by resolution. 8. Critical feature means an integral and readily identifiable part of a flood protection system, without which the flood protection provided by the entire system would be compromised. 9. Detention means the temporary storage and controlled release of stormwater run-off. 10. Detention facility means a facility that provides temporary storage of stormwater run-off and controlled release of this run-off. 11. Development means any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, berming, diking, excavating or drilling operations. 12. Drainage Sensitive Area (DSA) is the area outside the designated FEMA Special Flood Hazard Area and outside the designated regulatory floodplain which is subject to flooding during the one percent (1%) or greater annual chance storm to calculated depth of six (6) inches or greater where a clearly defined channel does not exist, where the path of overland flow is unpredictable and where velocity flow may not be evident. Such areas are characterized by ponding and sheet flow. 13. Earth change means excavating, grading, regrading, landfilling, berming or diking of land within the City. 14. Elevated building means a non-basement building: a. Built, in the case of a building in Zones A1-30, AE, A, A99, AO, AH, B, C, X and D, to have the top of the elevated floor, or in the case of a building in Zones V1-30, VE or V, to have the bottom of the lowest horizontal structure member of the elevated floor elevated above the ground level by means of pilings, columns (posts and piers) or shear walls parallel to the flow of the water, and b. Adequately anchored so as not to impair the structural integrity of the building during a flood of up to the magnitude of the base flood. In the case of Zones A1-30, AE, A, A99, AO, AH, B, C, X, D, "elevated building" also includes a building elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of floodwaters. In the case of Zones V1-30, VE or V, "elevated building" also includes a building otherwise meeting the definition of "elevated building," even though the lower area is enclosed by means of breakaway walls if the breakaway walls meet the standards of Section 60.3(e)(5) of the National Flood Insurance Program regulations. 15. Existing construction or existing structures means, for the purpose of determining flood insurance rates, structures for which the "start of construction" commenced before the effective date of the FIRM or before January 1, 1975, for FIRMs effective before that date. 16. Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before the effective date of the floodplain management regulations adopted by a community. 17. Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). 18. Federal Emergency Management Agency (FEMA) means the federal agency responsible for administering the National Flood Insurance Program. 19. Flood or flooding means a general and temporary condition for partial or complete inundation of normally dry land areas from: a. The overflow of inland waters, or b. The unusual and rapid accumulation or run-off of surface waters from any source. 20. Flood hazard area means an area of special flood hazard. 21. Flood Insurance Rate Map (FIRM) means an official map of a community on which the Federal Emergency Management Agency has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. 22. Flood Insurance Study is the official report provided by the Federal Emergency Management Agency. The report contains flood profiles, water surface elevation of the base flood and the Flood Boundary-Floodway Map. 23. Floodplain means any land area susceptible to being inundated by water from any source. (See definition of flooding.) 24. Flood proofing means any combination of structural and non-structural additions, changes, or adjustments to structures that reduce or eliminate flood damage to real estate or improve real property, water, and sanitary facilities, structures, and their contents. 25. Flood protection system means those physical structural works for which funds have been authorized, appropriated and expended and which have been constructed specifically to modify flooding in order to reduce the extent of the areas within a community subject to a "special flood hazard" and the extent of the depths of associated flooding. Such a system typically includes hurricane tidal barriers, dams, reservoirs, levees or dikes. These specialized flood-modifying works are those constructed in conformance with sound engineering standards. 26. Floodway is that portion of the flood hazard area identified by the Federal Emergency Management Agency as the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the regulatory flood without cumulatively increasing the water surface elevation more than one (1) foot. 27. Full development/full urbanization is full potential urbanization of the contributing watershed considering the Comprehensive Plan and land use regulations. 28. Full development flood fringe is that portion of the floodplain area between the outer boundary of the floodplain and the outer boundary of the flood hazard area. This area reflects the effects of full development of the watershed and extends to where the contributory drainage area is forty (40) acres or more. 29. Functionally dependent use means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. 30. Highest adjacent grade means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. 31. Historic structure means any structure that is: a. Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; b. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; c. Individually listed on a state inventory of historic places in states with historic preservation programs that have been approved by the Secretary of the Interior; or d. Individually listed on a local inventory or historic places in communities with historic preservation programs that have been certified either: (1) By an approved state program as determined by the Secretary of the Interior; or (2) Directly by the Secretary of the Interior in states without approved programs. 32. Levee means a man-made structure, usually an earthen embankment, designed and constructed in accordance with sound engineering practices to contain, control or divert the flow of water so as to provide protection from temporary flooding. 33. Levee system means a flood protection system which consists of a levee, or levees, and associated structures, such as closure and drainage devices, which are constructed and operated in accordance with sound engineering practices. 34. Lowest floor means the lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirement of Section 60.3 of the National Flood Insurance Program regulations. 35. Manufactured home means a structure transportable in one (1) or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes, the term "manufactured home" also includes park trailers, travel trailers and other similar vehicles placed on a site for greater than one hundred eighty (180) consecutive days. For insurance purposes, the term "manufactured home" does not include park trailers, travel trailers or other similar vehicles. 36. Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two (2) or more manufactured home lots for rent or sale. 37. New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after the effective date of floodplain management regulations adopted by a community. 38. Mean sea level means the National Geodetic Vertical Datum (NGVD) of 1929, or other datum, to which base flood elevations are shown. 39. Natural state means the cover and topography of land before any development or, in areas where there has already been development, the state of the area and topography of land on the date of December 22, 1977. 40. New construction means, for floodplain management purposes, structures for which the "start of construction" commenced on or after the effective date of a floodplain management regulation adopted by the City. 41. One hundred year frequency rainstorm is the rainstorm having an average statistical frequency of occurrence in the order of once in one hundred (100) years, although the rainstorm may actually occur in any year. 42. Recreational vehicle means a vehicle which is: (i) built on a single chassis; (ii) 400 square feet or less when measured at the largest horizontal projections; (iii) designed to be self-propelled or permanently towable by a light duty truck; and (iv) designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. 43. Regulatory flood is the flood having a one percent (1%) chance of being equaled or exceeded in any given year. 44. Regulatory floodplain is the area subject to flooding by the regulatory flood based on the full development of the watershed and where the contributing drainage area is forty (40) acres or more as designated by the City. 45. Sedimentation facilities include debris basins, sedimentation traps, berms, interceptor ditches, land terraces, hay bales and vegetation ground cover. 46. Special flood hazard area. See "area of special flood hazard." 47. Start of construction includes substantial improvement and means the date the building permit was issued, provided that the actual start of construction, repair, reconstruction, placement or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction or a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets or walkways; nor does it include excavation for basement, footing, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. 48. Stormwater Drainage and Hazard Mitigation Advisory Board is the Advisory Board established in Chapter 1, Section 104 of this title. 49. Stormwater Technical Advisory Group is the Technical Advisory Group established by the Stormwater Drainage and Hazard Mitigation Advisory Board (SDHMAB) for the purpose of reviewing and recommending to the SDHMAB on issues pertaining to drainage standards, Watershed Development Permit appeals and requests for variances. 50. Stormwater run-off is that portion of the rainfall that is drained into the stormwater drainage system. 51. Structure means a walled and roofed building that is principally above ground, including a gas or liquid storage tank, as well as a manufactured home. 52. Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty percent (50%) of the market value of the structure before the damage occurred. 53. Substantial improvement means any repair, reconstruction or improvement of a structure, the cost of which equals or exceeds fifty percent (50%) of the market value of the structure, either before the improvement or repair is started or, if the structure has been damaged and is being restored, before the damage occurred. For purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include any projects for improvement of a structure to comply with existing state or local health, sanitary or safety code specifications which are solely necessary to assure safe living conditions, or any alterations of a structure listed on the National Register of Historic Places or State Inventory of Historic Places. 54. Variance means a grant of relief to a person from the requirements herein when specific enforcement would result in unnecessary hardship. A variance, therefore, permits construction or development in a manner otherwise prohibited by this chapter. (For full requirements, see Section 60.6 of the National Flood Insurance Program regulation.) 55. Violation means the failure of a structure or other development to be in full compliance with the City's floodplain management regulations. A structure or other development without the elevation certificate, other certifications or other evidence of the compliance required in Section 60.3(b)(5), (c)(4), (c)(10), (d)(3), (e)(2), (e)(4) or (e)(5) of the National Flood Program regulations is presumed to be in violation until such time as that documentation is provided. 56. Watercourse means any depression serving to give direction to a current of stormwater where the drainage area above the same is five (5) acres or more. 57. Watershed means the physical area from which water drains into a creek. 58. Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929 (or other datum, where specified) of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

(Ord. Nos. 16959, 17285; Ord. No. 25244, § 1, 1-31-2024; Ord. No. 25399, § 1, 9-18-2024)

Ask a question about Tulsa law

Corpus searches the Tulsa sections it holds and shows the ones that match, with their citations. Free, no sign-in.