For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-567 — Permit for drilling new well required

San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio City Code § 34-567

Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/86eb8557-c16b-47a2-827a-0e5c2ebc8a94

Sec. 34-567. - Permit for drilling new well required.

(a) It shall be unlawful for anyone to drill, maintain, or otherwise construct or have constructed, any new water well, or any other artificial excavation to explore for or produce groundwater, or geothermal borehole for the purpose of a earth-coupled heat exchange system, within the City of San Antonio or SAWS service area, without first applying for and securing a well drilling permit from the SAWS Resource Protection and Compliance (RPC) Department. This section shall not apply to: (1) monitoring wells and test wells with a depth of less than fifty (50) feet; (2) blast holes in quarries and mines; and (3) wells or excavations for the exploration or production of oil, gas, or minerals, unless, without regard to the original purpose, the well is used as a source of water. (b) All drilling or construction of water wells, and injection wells for the purpose of an earth-coupled heat exchange system, shall be done in strict compliance with the terms of the well drilling permit, the SAWS Water Well Permitting Procedures, International Ground Source Heat Pump Association (IGSHPA) and 30 Texas Administrative Code (TAC), Chapter 331. (c) In addition to the requirements of paragraphs (a) and (b) of this section, any water well which will penetrate the Edwards Aquifer shall be drilled and maintained in strict compliance with 30 TAC, Chapter 213 et seq., as amended. This paragraph does not apply to borehole loops for the purpose of an earth-coupled heat exchange system. (d) To preserve the water quality of the Edwards Aquifer, the construction of any bore hole, injection well for the purpose of an earth-coupled heat exchange system, or water well for the purpose of an earth-coupled heat exchange system located over the Edwards Aquifer Recharge Zone and Transition Zone shall be prohibited. (e) An open system, geothermal well that draws water from an aquifer that is circulated through a heat exchange system or geothermal wells which inject water into an aquifer, or to a surface water body, will not be permitted within the limits of the City of San Antonio, City of San Antonio ETJ, or within SAWS service area.

(Ord. No. 2014-06-19-0472, § 1(Exh. A), 6-19-14)

Ask a question about San Antonio law

Corpus searches the San Antonio sections it holds and shows the ones that match, with their citations. Free, no sign-in.