§ 10-5.5-2 — Adoption of the International Residential Code With Modifications
Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 10-5.5-2
Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/870209e5-e474-45e3-99ba-de07c4813fe2
10-5.5-2. - Adoption of the International Residential Code With Modifications.
(a) The 2024 edition of the International Residential Code of the International Code Council is hereby adopted by reference as the City of Boulder Residential Building Code and has the same force and effect as though fully set forth in this chapter, except as specifically amended by the provisions of this chapter. (b) The Appendix chapters CC, BA, BE, BF, BO, BG, CF, BB, BI AND BJ and sections contained therein are adopted. (c) Section R101.1, "Title," is repealed and reenacted to read: R101.1 Title. These provisions shall be known as the Residential Code of the City of Boulder or residential code and shall be cited as such and will be referred to herein as "this code". (d) Sections R102 through R114 are repealed. This code shall be administered in accordance with Chapter 1, "Administration," of the International Building Code as adopted, with amendments, by Section 10-5-2, "Adoption of International Building Code With Modifications," B.R.C. 1981. (e) The following definitions are added to Section R202, "Definitions": COMMUNITY SOLAR GARDEN. A solar generation facility where the beneficial use of the electricity generated by the facility belongs to subscribers to the solar generation facility as authorized in Section 40-2-127, C.R.S. FLOOR AREA. The total square footage of all levels as measured from the inside finished surface of the walls, but excluding courts, garages usable exclusively for the storage of motor vehicles and uninhabitable areas that are located above the highest inhabitable level or below the first-floor level. NEW DWELLING UNIT. A dwelling unit is considered to be a new dwelling unit when the entire structure is newly built and when the dwelling unit is built on top of an existing foundation, such as caissons, footings, and other foundation systems, that remains from a demolished structure. SHADING. Shading is the protection from heat gains because of direct solar radiation by permanently attached exterior devices or building elements, interior shading devices, glazing material, or adherent materials. SKYLIGHT AREA. Skylight area is the area of the rough opening for the skylight. SOLAR ZONE. A solar zone is a section of the roof designated and reserved for the future installation of a solar electric or solar thermal system. STANDARD TEST CONDITIONS. A fixed set of conditions for which PV module performance is rated. These conditions are 1000 W/m ² incident solar radiation, 24°C cell temperature, 0.0 wind speed, and air mass 1.5 spectrum. STORAGE ROOMS OR SPACES. Storage rooms or spaces are rooms or spaces with a level of finish sufficient only to make the room usable for the intended storage purposes. Rooms or areas that exceed these minimums will be considered habitable space and will have to meet the code requirements applicable to habitable space. (f) A new sentence is added to the end of Section R301.1, "Application," stating: Structural calculations shall be submitted to the building official, demonstrating the proposed construction meets the applicable requirements for design loads. (g) The climatic and geographic design criteria applicable to Table R301.2(1) are:

Three-second wind gust velocity = 150 mph east of Broadway, 165 mph west of Broadway Topographic effects = Yes Special wind region = Yes Windborne debris zone = No Seismic Design Category = B Weathering = severe Frost line depth = 32 inches Termite = slight Decay = none to slight Winter Design Temp = 2 degrees Fahrenheit Ice barrier underlayment required = NO Flood Hazards = See Sections 9-3-3 through 9-3-9, B.R.C. 1981 Air freezing index = 459 Mean annual temp = 52.1 Elevation = 5,385 feet Latitude = 40 degrees Winter Heating = 0 degrees Fahrenheit Summer Cooling = 91 degrees Fahrenheit Altitude Correction Factor= 0.821 Indoor Design Temperature = 72 degrees Fahrenheit Design Temperature Cooling = 75 degrees Fahrenheit Heating Temperature difference = 66 degrees Fahrenheit Cooling Temperature difference = 18 degrees Fahrenheit Wind Velocity Heating = 15 Wind Velocity Cooling = 7.5 Coincident Wet Bulb = 59 degrees Fahrenheit Daily Range = High Winter Humidity = 30% Summer Humidity = 50% (h) Section R301.2.4, "Floodplain construction": A new sentence is added to the end of the section reading "All work on structures in the scope of this code shall also meet the requirements of Sections 9-3-2 through 9-3-9, B.R.C 1981." (i) Section R306, "Flood-resistant construction," is repealed and reenacted to read: R306 Flood resistant construction. Buildings and structures constructed in whole or in part in the floodplain must be designed and constructed in accordance with the floodplain regulations of Title 9, Land Use Code, B.R.C. 1981. (j) A new Section R333, Construction Waste Management, is added to read: SECTION R333 CONSTRUCTION WASTE MANAGEMENT R333.1 Residential construction waste recycling. An applicant for a building permit to construct a new dwelling unit shall demonstrate all recyclable wood, metal and cardboard materials were donated, reused or recycled. R333.1.1 Reporting. Within sixty days following rough inspection of the project and prior to final inspection, the applicant shall submit documentation to the city manager which proves that all recyclable wood, metal and cardboard was donated, reused, or recycled. The documentation shall consist of a final completed waste diversion report in a form as prescribed by the city manager showing the tonnage of materials salvaged for recycling and reuse, supported by original weight receipts or other waste documentation that reasonably verifies that materials generated from the site have been accepted for recycling, reuse, salvage or otherwise diverted. For construction debris for which weighing is not practical due to size, lack of scales at the facility, or other considerations, a volumetric measurement shall be used. For conversion of volumetric measurements to weight, the applicant shall use the standardized conversion rates established by the city manager. R333.2 Residential deconstruction waste recycling. An applicant for a full demolition shall adhere to the requirements of Sections R328.2.1 through R328.2.5. R333.2.1 Diversion requirements. The applicant shall divert from landfills at least seventy-five percent of the waste tonnage of demolition debris generated from the project by using recycling, reuse, and diversion programs. The city manager may modify this requirement if the applicant demonstrates it is unfeasible as set forth in Section R328.2.2. The materials diverted must also include at least three of the material types set forth in the deconstruction plan form established by the city manager. R333.2.2 Information required before issuance of demolition and/or building permit. The applicant shall submit a properly completed deconstruction plan in a form as established by the city manager. The applicant must propose to divert at least three of the material types identified by the city manager in the deconstruction plan form. No building permit or demolition permit shall be issued prior to the approval of the deconstruction plan by the city manager. In estimating the volume or weight of materials identified in the deconstruction plan, the applicant shall use the standardized conversion rates established by the city manager. The city manager may modify the required diversion percentage if the applicant demonstrates in the deconstruction plan that the percentage is not feasible because the maximum weight of materials that can be reused or recycled is less than the required diversion rate, or due to the presence of materials that are unable to be diverted due to special waste conditions such as environmental hazards. R333.2.3 Administrative fee and deposit required. Prior to issuance of a permit for a full demolition, the applicant shall post a cash deposit and pay the administrative fee described in Section 4-20-72, B.R.C. 1981. The cash deposit shall be one dollar per square foot of the demolition or work area of the alteration as identified in the permit application, or $1,500, whichever is greater. R333.2.4 Reporting. Within sixty days following the completion of the demolition, the applicant shall submit documentation to the city which proves compliance with the requirements of Sections R333.2.1 and R333.2.2. The documentation shall consist of a final completed waste diversion report in a form established by the city manager showing the tonnage of materials salvaged for recycling and reuse, supported by original weight receipts or other waste documentation that reasonably verifies that materials generated from the site have been accepted for recycling, reuse, salvage or otherwise diverted at the required diversion percentage. The documentation shall further demonstrate that the diverted materials include at least three material types. For demolition debris for which weighing is not practical due to size, lack of scales at facility, or other considerations, a volumetric measurement shall be used. For conversion of volumetric measurements to weight, the applicant shall use the standardized conversion rates established by the city manager. R333.2.5 Deposit refunded or forfeited. No applicant shall fail to comply with Sections R333.2.1 through R333.2.4. The deposit shall be refunded to the applicant in proportion to the ratio of the actual diversion rate to the required diversion rate. If the required diversion percentage is not fully complied with, the remainder of the deposit shall be forfeited to the city as a civil penalty for failure to comply with the requirements of this chapter, after notice and an opportunity for hearing under the procedures prescribed by Chapter 1-3, "Quasi-Judicial Hearings," B.R.C. 1981. The city manager may adjust the amount of the refund or forfeiture where the applicant demonstrates that the required diversion percentage was not feasible based on the factors identified in Section R333.2.2 for modification of the diversion percentage. The forfeiture remedy is cumulative and is in addition to any other action the city manager is authorized to take, including suspension or revocation of a building contractor license or prosecution in the municipal court. Each 2,500 square feet of the demolition or alteration shall give rise to a separate violation, and each violation is subject to a maximum fine of $2,500. (k) The first paragraph of Section R401.1, "Application," is repealed and reenacted to read: R401.1 Application. The provisions of this chapter shall control the design and construction of the foundation and foundation spaces for all buildings. In addition to the provisions of this chapter, the design and construction of foundations in a floodplain as established in Title 9, Land Use Code, B.R.C. 1981, shall meet all applicable provisions of Title 9, Land Use Code, B.R.C. 1981. Where, in any specific case, the provisions of this code and the B.R.C. are in conflict, the most restrictive shall govern. Where there is a conflict between a general requirement and a specific requirement, the specific requirement shall be applicable. Wood foundations shall be designed and installed in accordance with AF&PA PWF. (l) A new Section R401.5, "Placement of backfill," is added to read: R401.5 Placement of backfill. The provisions of Section 1804.3 of the Building Code of the City of Boulder shall apply to the placement of backfill. (m) Section R408.7, "Flood resistance," is repealed and reenacted to read: R408.7 Flood resistance. Buildings located in a floodplain as established in Title 9, Land Use Code, B.R.C. 1981, shall comply with the applicable provisions in Title 9, Land Use Code, B.R.C. 1981. (n) Item 3 of Section R806.5, "Unvented attic and unvented enclosed rafter assemblies," is deleted. Section R902.1, "Roof assemblies," is repealed and reenacted to read: R902.1 Roof covering materials. All roof covering materials shall be listed as Class A as tested in accordance with UL Standard 790 or ASTM Standard E 108. Roof assemblies with covering of brick, masonry, slate, clay, or concrete roof tile, exposed concrete roof deck, ferrous or copper shingles or sheets, and metal sheets and shingles, shall be considered Class A roof coverings. Unless otherwise specified in this section, roof coverings shall be installed to resist the component and cladding loads specified in table R301.2(2), adjusted for height and exposure in accordance with table R301.2(3). (o) Exception 1 in Section R703.2, "Water-resistive barrier," is repealed and reenacted to read: Exception 1: In detached accessory buildings which are not intended to be conditioned and where the interior wall cavities will remain exposed and unfilled. (p) Section R905.7, "Wood shingles," is repealed and reenacted to read: R905.7 Wood shingles. Wood shakes, wood shingles, and wood roof covering materials are prohibited except as provided in Section 10-5-5, "Wood Roof Covering Materials Prohibited," B.R.C. 1981, for certain minimal repairs. (q) Section R905.8, "Wood shakes," is repealed and reenacted to read: R905.8 Wood shakes. Wood shakes, wood shingles, and wood roof covering materials are prohibited except as provided in Section 10-5-5, "Wood Roof Covering Materials Prohibited," B.R.C. 1981, for certain minimal repairs. (r) Chapter 11, "Energy Efficiency." Sections N1101 through N1113 are repealed. A new Section N1101 is added to read: N1101 Scope. Regulations concerning the design and construction of buildings for the effective use of energy and requirements for green building practices shall be administered in accordance with the 2024 City of Boulder Energy Conservation Code as adopted by Chapter 10-7, "Energy Conservation Code," B.R.C. 1981. (s) Section M1301.1.1, "Flood-resistant installation," is repealed and reenacted to read: M1301.1.1 Flood-resistant installation. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, the mechanical appliances, equipment and systems shall be located or installed in accordance with the applicable provisions of Title 9, Land Use Code, B.R.C. 1981. (t) A new Section M1308.3, "Rooftop equipment support and clearances," is added to read: M1308.3 Rooftop equipment support and clearances. (1) Mechanical equipment placed, replaced, or resting over roofing shall be supported by curbs or legs which shall be flashed to the roofing and made watertight. Mechanical equipment includes, but is not limited to, heating equipment, cooling and refrigeration equipment, ventilating fans, blowers, and other similar devices located on the roof. (2) Flat roofs. On roofs having a pitch of less than 2 in 12, mechanical equipment shall be supported on a solid curb greater in size than the equipment which it serves. Curbs may be manufactured or built-in-place. If built-in-place, the curb shall be covered with metal of at least 26 gauge. The metal shall be weather-tight. The curb shall be a minimum of 9 inches above the finished roof. (A) Ducts less than 4 feet in width shall have at least 12 inches clearance from the finished roof surface to the bottom of the duct. (B) Ducts between 4 feet and 8 feet in width shall have at least 24 inches clearance from the finished roof surface to the bottom of the duct. (C) Ducts over 8 feet in width shall have at least 36 inches clearance from the finished roof surface to the bottom of the duct. (3) Pitched roofs. On roofs having a roof pitch exceeding 2 in 12, mechanical equipment may be set on legs which provide a minimum of 11 inches clearance between the finished roof surface and the equipment frame. (u) Section M1401.5, "Flood hazard," is repealed and reenacted to read: M1401.5 Flood hazard. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, heating and cooling equipment and appliances shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (v) Section M1601.4.10, "Flood hazard areas," is repealed and reenacted to read: M1601.4.10 Flood hazard areas. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, duct systems shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (w) A new sentence is added to Section M1602.2, "Return air openings," to read: 11. Within individual dwelling units there shall be at least one return air opening on each floor. (x) Section M2001.4, "Flood-resistant installation," is repealed and reenacted to read: M2001.4 Flood-resistant installation. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, boilers, water heaters and their control systems shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (y) Section M2201.6, "Flood-resistant installation," is repealed and reenacted to read: M2201.6 Flood-resistant installation. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, tanks shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (z) Section G2404.7, "Flood hazard," is repealed and reenacted to read: G2404.7 Flood hazard. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, the appliance, equipment, and system installations regulated by this code shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (aa) Section G2427.8, "Venting system termination clearances," is amended by adding a new sentence to the end of the section reading: Mechanical draft venting system and through-the-wall direct vent terminals shall terminate a minimum of 18 inches (46 mm) above finished grade in the immediate vicinity of each vent. (bb) The Exception to Section P2601.2, "Connections to drainage system," is deleted in its entirety. (cc) Section P2601.3, "Flood hazard areas," is repealed and reenacted to read: P2601.3 Flood hazard areas. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, plumbing fixtures, drains, and appliances shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (dd) The first sentence of Section P2602.2, "Flood-resistant installation," is repealed and reenacted to read: In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981: Items 1 and 2 remain unchanged. (ee) Section P3001.3, "Flood-resistant installation," is repealed and reenacted to read: P3001.3 Flood-resistant installation. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, drainage, wastes, and vent systems shall be located and installed to prevent infiltration of floodwaters into the systems and discharges from the systems into floodwaters. (ff) Section P3009, "Subsurface Landscape Irrigation Systems Greywater Soil Absorption Systems," is deleted in its entirety. (gg) Section P3101.5, "Flood resistance," is repealed and reenacted to read: P3101.5 Flood resistance. In floodplains, as established in Title 9, Land Use Code, B.R.C. 1981, vents shall be located or installed in accordance with the provisions of Title 9, Land Use Code, B.R.C. 1981. (hh) Appendix BE, "Radon Control Method," is hereby repealed and reenacted to read as follows: APPENDIX BE RADON CONTROL METHOD The requirements of Appendix BE to the 2024 edition of the International Residential Code of the International Code Council shall hereby be complied with which appendix is hereby adopted by reference as part of the City of Boulder Residential Code and have the same force and effect as though fully set forth in this subsection. (ii) Appendix CF, "Sizing of Water Piping System," is hereby repealed and reenacted to read as follows: APPENDIX CF SIZING OF WATER PIPING SYSTEM The requirements of Appendix CF to the 2024 edition of the International Residential Code of the International Code Council shall hereby be complied with which appendix is hereby adopted by reference as part of the City of Boulder Residential Code and have the same force and effect as though fully set forth in this subsection, except as specifically amended by the provisions of this subsection. (jj) Appendix BB, "Tiny Houses," is hereby repealed and reenacted to read as follows: APPENDIX BB TINY HOUSES The requirements of Appendix BB to the 2024 edition of the International Residential Code of the International Code Council shall hereby be complied with which appendix is hereby adopted by reference as part of the City of Boulder Residential Code and have the same force and effect as though fully set forth in this subsection, except as specifically amended by the provisions of this subsection. BB101.1 "Scope" is hereby repealed and reenacted to read as follows: This appendix shall be applicable to site built tiny houses used as single dwelling units. Tiny houses shall comply with this code except as otherwise stated in this appendix. Tiny houses shall be on permanent foundations and permanently connected to utilities, as required by this code. Tiny houses constructed off-site shall be built and installed in accordance with C.R.S. § 24-32-3311(6). Ordinance Nos. 5850 (1996); 7142 (2001); 7287 (2003); 7331 (2004); 7476 (2006); 7566 (2007); 7925 (2013); 8166 (2017); 8366 (2020); 8629 (2024); 8684 (2025)
Ask a question about Boulder law
Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.
