For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-1-6 — PAVEMENT RESTORATION FEES, PAVEMENT CUT RESTRICTIONS

Mesa City Code (Supp. No. 22: codified through Ordinance No. 5996, adopted March 9, 2026) · Mesa City Code § 9-1-6

Corpus is an independent public-information project, not the official City of Mesa website. Stable reference: corpuslaw.us/code/87aad5df-c298-4f01-9305-633dbc2502ec

9-1-6: - PAVEMENT RESTORATION FEES, PAVEMENT CUT RESTRICTIONS

(A) Pavement Restoration Fees. A permittee shall pay a pavement restoration fee in connection with any Right-of-Way Permit to cut into, excavate, open, bore trench or disturb street pavement within a period of five (5) years after the City's acceptance of street construction that includes new pavement, pavement renovation or pavement reconstruction at the location for which the Right-of-Way Permit is being sought. The amount of the pavement restoration fee shall be as established in the City's fee schedule. The pavement restoration fee shall be paid before a Right-of-Way Permit is issued unless the permittee has a written agreement with the City that allows for payment of the pavement restoration fee after the pavement cut is made. The pavement restoration fee will be in addition to, and will not be offset by, all license and franchise fees, expenses and taxes. (5369) (B) Pavement Cut Restrictions. The City Engineer shall not approve a Right-of-Way Permit to cut into, excavate, open, bore, trench, or disturb street pavement for a period of two (2) years after the City's acceptance of street construction that includes new pavement, pavement renovation, pavement reconstruction, or street maintenance at the location for which the permit is being sought. The City Engineer may authorize an exception to this pavement cut restriction under any one of the following conditions: (5369) 1. A verifiable emergency exists that endangers life or property; (5369) 2. There is an interruption of essential utility service; (5369) 3. Utility or other service for buildings is required where no other feasible means of providing such service exists; or (5369) 4. A pavement cut is required by city, county, state or federal regulation. (5369) (C) Between one (1) year and two (2) years after acceptance, if the City Engineer determines, upon reviewing evidence submitted by the permittee, that the cost to mill and overlay/inlay is substantially less than the cost of alternate routing for permittee's facilities the permittee may choose to cut the pavement and perform a mill and overlay/inlay as described in Subsection (E) below. (5369) (D) If the City Engineer authorizes a pavement cut pursuant to an exception set forth in Subsection (B) the permittee shall: (5369) 1. Pay the pavement restoration fee established by the City Council in the City's fee schedule; and (5369) 2. Repair the pavement, after making the permitted cut, to meet right-of-way improvement standards. (5369) (E) If the City issues a street cut permit within one (1) year of construction, reconstruction or renovation of pavement, permittee shall renovate such street by mill and overlay/inlay, for a minimum of the full width of all lanes impacted by the cut(s) (outside lane includes to the curb) and for arterial streets extending a minimum length of fifty (50) feet in both directions from the area of the cut(s) and for collector and residential streets extending a minimum length of twenty-five (25) feet both directions from the area of the cut(s), all as more specifically directed by the City Engineer/designee. Provided, however, for one pothole smaller than two (2) square feet, the requirement to renovate the street by mill and overlay/inlay shall not apply. (5369)

Ask a question about Mesa law

Corpus searches the Mesa sections it holds and shows the ones that match, with their citations. Free, no sign-in.