Sec. 23-432. - Application requirements and process.
(a) Approval required. Except as otherwise provided, a siting permit to construct or install small cell facilities shall not be granted under this division except upon approval by the franchise manager, city council in the case of an appeal, or as otherwise designated by resolution or ordinance to consider application under this division, in which applicant must sufficiently describe the manner, form, design, placement, its effect and impact, and other pertinent information with regard to placement and maintenance of small cell facilities or new support structures in the right-of-way. (b) Application. An application must be submitted for every small cell facility or support structure. (c) Application requirements. At a minimum every application should include, as follows: (1) The applicant's name, address, telephone number, and e-mail address; and the names, addresses, telephone numbers, and e-mail addresses of all consultants, if any, acting on behalf of the applicant with respect to the filing of the application; (2) A general description of the proposed work and the purposes and intent of the small cell facility. The scope and detail of such description shall be appropriate to the nature and character of the work to be performed, with special emphasis on those matters likely to be affected or impacted by the work proposed; (3) Site plan and engineering design and specifications, including engineering drawings to scale, of the proposed small cell facilities and related structures, including the location of radios, antenna facilities, transmitters, equipment shelters, cables, conduit, point of demarcation, backhaul solution, electrical distribution panel, electric meter, and electrical conduit and cabling, and support structure(s); the engineering drawing shall include the seal of an engineer licensed to perform services in the State of Alabama; (4) Design documents should include photos of the existing support structure, and a photo simulation of the support structure with attached equipment. Where applicable, the design documents should include specifications on stealth design, support structure modification, and ADA compliance; (5) Maps designating with specificity the locations of the requested facilities; (6) The geographic coordinates (GIS) of all antenna and other proposed facilities; (7) For city traffic light signal, written verification from the city that the pole is eligible for attachment; (8) A load bearing study that determines whether the support structure requires re-enforcement or replacement in order to accommodate attachment of small cell facilities or equipment. If support structure re-enforcement or replacement is warranted, the design documents should include the proposed support structure modification certified by an engineer licensed to perform services in the State of Alabama; (9) Copy of the manufacturer's detailed specifications for small cell equipment and antennas, including photographs or illustrations and a complete description of all pertinent physical and electrical characteristics; (10) Supporting information if stealth modifications are required in order to comply with the design standards (i.e., to blend with the character and style of the surrounding area) or criteria for installations; (11) Supporting information if the application seeks approval of a new support structure, including design and specification drawings for the new support structure, and a statement regarding the reasons for and what other alternatives, if any, were identified but not utilized, and why; (12) Applicable design and specification drawings if the proposed installation will require reinforcement or replacement of an existing support structure; (13) The number, size, type and proximity to the small cell facilities of all communications conduit(s) and cables to be installed; (14) Description of the utility services required to support the small cell facilities to be installed; (15) If the small cell facilities will be located on a support structure on the right-of-way that is owned by any entity other than the city or the applicant, the authorization documentation required in subsection 23-430(e); (16) All permits and letters of authorization; (17) Valid FCC license, where applicable or other appropriate certificates or permits as required; (18) A certification from a licensed engineer that the small wireless facility and any associated new or replacement support structure shall comply with all applicable codes and FCC rules and regulations, including federal standards for RF emissions; and (19) A declaration signed by an authorized representative of the applicant stating that the information in the application is true and accurate and that the small wireless facility and (if applicable) associated support structure will be built in conformance with the specifications set forth in the application.
(Ord. No. 20-270, § 1, 4-9-2020)
Ask a question about Huntsville law
Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.