For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 143.0146 — Supplemental Regulations for Special Flood Hazard Areas

San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 143.0146

Corpus is an independent public-information project, not the official City of San Diego website. Stable reference: corpuslaw.us/code/88923a7a-3815-4dc2-b83d-5b880b095107

§143.0146 Supplemental Regulations for Special Flood Hazard Areas

All proposed development in a Special Flood Hazard Area, including substantial improvements, is subject to the following requirements and all other applicable requirements and regulations of FEMA. The applicant for each development project, including applicants for substantial improvement projects, shall obtain the federal and state permits required by 44 C. F. R. § 60.3(a)(1), as may be amended. (a) Development and Permit Review (1) Where base flood elevation data has not been provided by the Flood Insurance Study, the City Engineer shall obtain, review, and utilize base flood elevation and floodway data available from federal or state sources, or require submittal of such data from the applicant. The City Engineer shall make interpretations, where needed, as to the location of the boundaries of the areas of the Special Flood Hazard Area, based on the best available engineering or scientific information. (2) Proposed development in a Special Flood Hazard Area shall not adversely affect the flood carrying capacity of areas where base flood elevations have been determined but the floodway has not been designated. “Adversely affect” as used in this section means that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point. (3) In all cases where a watercourse is to be altered the City Engineer shall do the following: (A) Notify affected, adjacent communities and the California Department of Water Resources of any proposed alteration or relocation of a watercourse and submit evidence of the notice to the Federal Insurance Administration; (B) Require that the flood carrying capacity of the altered or relocated portion of the watercourse is maintained; and (C) Secure and maintain for public inspection and availability the certifications, appeals, and variances required by these regulations. (4) The applicant shall grant a flowage easement to the City for that portion of the property within a floodway. (5) Appropriate agreements shall be secured between the applicant and the City to assure participation by the applicant or any successor in interest in financing of future flood control works. (6) Development in a Special Flood Hazard Area shall not increase or expand a FIRM Zone A. (7) In all floodways, any encroachment, including fill, new construction, significant modifications, and other development is prohibited unless certification by a registered professional engineer is provided demonstrating that encroachments will not result in any increase in flood levels during the occurrence of the base flood discharge except as allowed under Code of Federal Regulations Title 44, Chapter 1, Part 60.3(c)(13). (8) The applicant shall obtain, keep, and make available for inspection by the City Engineer the following certifications: (A) certification required for lowest floor elevations; and (B) certification required for elevation or floodproofing of nonresidential structures. (b) Standards for Subdivisions (1) All preliminary subdivision proposals shall identify the Special Flood Hazard Area and the elevation of the base flood. (2) All final subdivision maps shall provide the elevation of proposed structures and pads. If the site is filled above the base flood elevation, the lowest floor, including basement, shall be certified to be 2 feet above the base flood elevation by a registered professional engineer or surveyor, and the certification shall be provided to the City Engineer. (3) All subdivisions shall be designed to minimize flood damage. (4) All subdivisions shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage. (5) All subdivisions shall provide adequate drainage to reduce exposure to flood hazards. (6) The final map shall bear the notation “Subject to Inundation” for those portions of the property with a grade lower than 2 feet above the base flood elevation. (c) Standards of Construction In all Special Flood Hazard Areas, the following standards apply for all development. (1) All permitted, permanent structures and other significant improvements shall be anchored to prevent flotation, collapse, or lateral movement resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (2) All permitted permanent structures and other significant improvements shall be constructed with materials and utility equipment resistant to flood damage. (3) Construction methods and practices that minimize flood damage shall be used. (4) All electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities shall be designed and located to prevent water from entering or accumulating within the equipment components during conditions of flooding. (5) Breakaway walls shall be certified by a registered engineer or architect to meet all applicable FEMA requirements. The certification shall be provided to the City Engineer before final inspection approval. (6) New construction or substantial improvement of any structure shall have the lowest floor, including basement, elevated at least 2 feet above the base flood elevation. Upon completion of the development, the elevation of the lowest floor, including basement, shall be certified by a registered professional engineer or surveyor to be properly elevated. The certification shall be provided to the City Engineer before final inspection approval. The City Engineer reserves the right to require a preliminary certification before foundation inspection approval. (7) New construction or substantial improvement of any structure in FIRM Zone AH or AO shall have the lowest floor, including basement, elevated above the highest adjacent grade at least 2 feet higher than the depth number specified on the FIRM, or at least 4 feet if no depth number is specified. Upon the completion of the structure the elevation of the lowest floor, including basement, shall be certified by a registered professional engineer or surveyor, to be properly elevated. The certification shall be provided to the City Engineer before final inspection approval. The City Engineer may require a preliminary certification before foundation inspection approval. (8) Permitted nonresidential construction shall either be elevated as required by Section 143.0146(c)(6) or (7) or, together with attendant utility and sanitary facilities, meet the flood proofing requirements of FEMA. Certification by a registered professional engineer or architect that such requirements are met shall be provided to the City Engineer before final inspection approval. The City Engineer may require a preliminary certification before foundation inspection approval. (9) Fully enclosed areas below the lowest floor that are subject to flooding shall be certified by a registered professional engineer or architect that they comply with the flood proofing requirements of FEMA. The certification shall be provided to the City Engineer before final inspection approval. (10) Within FIRM Zones AH or AO, new construction and substantial improvements of any structure shall be constructed so that there are adequate drainage paths around structures on slopes to guide flood waters around and away from proposed structures. (11) All new construction and substantial improvements of structures with fully enclosed areas below the lowest floor, excluding basements, that are usable solely for parking of vehicles, building access, or storage, and which are subject to flooding, shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwater as required by 44 C. F. R. § 60.3(c)(5), as may be amended. Designs for meeting this requirement must be certified by a registered professional engineer or architect, or meet or exceed the following minimum criteria: (i) A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided; (ii) The bottom of all openings shall be no higher than one foot above grade; and (iii) Openings may be equipped with screens, louvers, valves or other coverings or devices provided that they permit the automatic entry and exit of floodwater. (d) Standards for Manufactured Homes All new and replacement manufactured homes and additions to manufactured homes are subject to the following regulations. (1) The lowest floor shall be elevated at least 2 feet above the base flood elevation. (2) Manufactured homes shall be securely anchored to a permanent foundation system to resist flotation, collapse, or lateral movement. (3) A registered engineer or architect must certify that the conditions of this subsection have been met. The certification shall be provided to the City Engineer before final inspection approval. (4) Within Special Flood Hazard Areas, the placement or installation of manufactured homes shall comply with the standards for coastal high hazard areas in section 143.0146(g). (e) Standards for Utilities Certification shall be provided to the City Engineer before final inspection approval that the following requirements have been met. (1) All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the system and discharge from systems into flood waters. (2) On-site waste disposal systems shall be located and designed to avoid impairment to them or contamination from them during flooding. (f) Standards for Recreational Vehicles (1) A recreational vehicle, as defined by FEMA and used in this Section, is a vehicle built on a single chassis, 400 square feet or less when measured at the largest horizontal projection, designed to be self-propelled or permanently towable by a light-duty truck and designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. (2) All recreational vehicles placed in Special Flood Hazard Areas shall comply with one of the following: (A) Be on the site for fewer than 180 consecutive days; or (B) Be fully licensed with the state and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions; or (C) Meet the standards for manufactured homes in Section 143.0146(d). (g) Standards for Coastal High Hazard Area (1) A coastal high hazard area is an area of special flood hazard extending from offshore to the inland limit of a primary frontal dune along an open coast and any other area subject to high velocity wave action from storms. It is subject to high velocity waters, including coastal and tidal inundation. The area is designated on a FIRM Zone V1-30, VE, or V. (2) Within coastal high hazard areas, FIRM Zones V1-30, VE, and V, the following standards shall apply: (A) All new development, including substantial improvement to an existing structure, shall be elevated on adequately anchored pilings or columns and securely anchored to such pilings or columns so that the bottom of the lowest horizontal structural member of the lowest floor (excluding the pilings or columns) is elevated to or about the base flood level. The pile or column foundation and structure attached thereto shall be anchored to resist flotation, collapse, and lateral movement due to the effects of wind and water loads acting simultaneously on all building components. Water loading values used shall be those associated with the base flood. Wind loading values used shall be those required by applicable state or local building standards. (B) All new development shall be located on the landward side of the reach of mean high tide. (C) All new development and any substantial improvement to an existing structure shall have the space below the lowest floor free of obstructions or constructed with breakaway walls. Such enclosed space shall be used solely for parking of vehicles, building access or storage. (D) Fill shall not be used for structural support of buildings. (E) Man-made alteration of sand dunes which would increase potential flood damage is prohibited. (F) The applicant for any new development shall provide the following records to the satisfaction of the City Engineer: (i) Certification by a registered engineer or architect that a proposed structure complies with Section 143.0146(g); and (ii) Plans that identify the elevation (in relation to mean sea level) of the bottom of the lowest horizontal structural member of the lowest floor (excluding pilings or columns) of all new structures and any substantial improvements to existing structures, and whether such structures contain a basement. (h) The City Engineer shall notify the San Diego District Offices of the Coastal Commission of any pending changes to the adopted Flood Insurance Rate Maps affecting property within the Coastal Overlay Zone when the City Engineer receives notification of such potential changes. The City Engineer shall notify the Commission staff when coastal development within the City of San Diego’s Coastal Development Permit jurisdiction would require processing a change to the FIRM maps. The City Engineer shall ensure that the Commission’s District Office has the most current effective Flood Insurance Rate Maps approved by FEMA by forwarding any revised maps affecting the Coastal Overlay Zone within thirty working days of the City Engineer’s receipt. (i) If a development changes the base flood elevations due to physical alterations, the permit applicant shall be required to submit technical or scientific data to FEMA for a Letter of Map Revision (LOMR) within 6 months of information becoming available or project completion, whichever comes first.

(Amended 4-22-2002 by O-19051 N.S.; effective 10-8-2002.) (Amended 8-4-2011 by O-20081 N.S.; effective 10-6-2011.) (Amended 4-5-2016 by O-20634 N.S.; effective 5-5-2016.) (Amended 1-8-2020 by O-21162 N.S.; effective 2-9-2020.)

Ask a question about San Diego law

Corpus searches the San Diego sections it holds and shows the ones that match, with their citations. Free, no sign-in.