For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Compliance Requirements for the Control Efficiency/Outlet Concentration Option

40 C.F.R. Part 63, Compliance Requirements for the Control Efficiency/Outlet Concentration Option
in effect

40 C.F.R. § 63.3550 By what date must I conduct performance tests and initial compliance demonstrations?

40 C.F.R. § 63.3551 How do I demonstrate initial compliance?

40 C.F.R. § 63.3552 How do I demonstrate continuous compliance with the emission limitations?

40 C.F.R. § 63.3553 What are the general requirements for performance tests?

40 C.F.R. § 63.3554 How do I determine the emission capture system efficiency?

40 C.F.R. § 63.3555 How do I determine the outlet THC emissions and add-on control device emission destruction or removal efficiency?

40 C.F.R. § 63.3556 How do I establish the emission capture system and add-on control device operating limits during the performance test?

40 C.F.R. § 63.3557 What are the requirements for continuous parameter monitoring system installation, operation, and maintenance?