For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-2-3(A) — Pre-Application Conference

Code of Ordinances, City of Biloxi, Mississippi (Supp. No. 63, Update 1: codified through Ordinance No. 2607, enacted July 28, 2026) · Biloxi Land Development Ordinance § 23-2-3(A)

Corpus is an independent public-information project, not the official City of Biloxi website. Stable reference: corpuslaw.us/code/897cc839-b940-4c2c-bf4e-61527c25660c

(A) - Pre-Application Conference

(1) Purpose The purpose of a pre-application conference is to provide an opportunity for the applicant to determine the submittal requirements, review procedures, and standards applicable to the development proposal, and for city staff to offer the applicant preliminary comments about the scope, features, and impacts of the proposed development. The pre-application conference should occur before any substantial investment in a proposed development (e.g., site acquisition, preparation of design and engineering plans). (2) Pre-Application Conference Mandatory Except for development applications initiated by city staff or the Planning Commission, Board of Zoning Adjustments, Architectural and Historic Review Commission, Mayor, or City Council, a pre-application conference between the applicant and the Development Review Committee shall be mandatory before submittal of the following types of applications: a. Official Zoning Map Amendments (Rezonings); b. Planned Developments; c. Conditional Use Permits; d. Major Site Plans; e. Major Subdivision Preliminary Plats; and f. Right-of-Way or Easement Vacation or Abandonment. (3) Pre-Application Conference Optional An applicant for any application for development approval other than those listed in Section 23-2-3(A)(2), Pre-Application Conference Required, may request a pre-application conference from the Director of Community Development. The Director of Community Development shall determine whether the optional pre-application conference is to be conducted with the Development Review Committee or with selected city staff. (4) Sketch Plan or Conceptual Drawings Required Applicants seeking approval of a Planned Development (Section 23-2-4(C)), Conditional Use Permit (Section 23-2-4(D)), Major Site Plan (Section 23-2-4(E)(4)), or Major Subdivision Preliminary Plat (Section 23-2-4(F)(5)) shall submit a sketch plan or conceptual drawings that show the location, general layout, and main elements of the proposed development to the Director of Community Development at least three business days before the pre-application conference. (5) Effect The pre-application conference is intended as a means of facilitating the development application process. Discussions held in accordance with this section are not binding on the city. Processing times for review of development applications do not begin until a formal, complete application is submitted and determined to be complete.

Ask a question about Biloxi law

Corpus searches the Biloxi sections it holds and shows the ones that match, with their citations. Free, no sign-in.