Wastewater discharge permit issuance process.
Tyler City Code § 19-76
in effectSec. 19-76. Wastewater discharge permit issuance process.
a. Permit duration. Wastewater discharge permits shall be issued for a specified time period, not to exceed five (5) years. A wastewater discharge permit may be issued for a period less than five (5) years at the discretion of the Manager. Each wastewater discharge permit will indicate a specific date upon which it will expire.
b. Non- Transferability. Wastewater discharge permits are non-transferable without, at a minimum, prior notification to the manager or his delegated representative and provision of a copy of the existing permit to the new owner or operator.
c. Permit contents.
1. Wastewater discharge permits shall include such conditions as are reasonably deemed necessary by the Manager, including those to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW.
2. Wastewater discharge permits must contain the following conditions:
(a) A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years.
(b) A statement that the wastewater discharge permit is nontransferable.
(c) Effluent limits applicable to the user based on applicable standards in federal, state, and local law.
(d) Self monitoring, sampling, reporting, notification, and record keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law.
(e) Statement of applicable civil, criminal, and administrative penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law.
3. Wastewater discharge permits may contain, but need not be limited to, the following:
(a) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization.
(b) Limits on the instantaneous, daily, and monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties.
(c) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works.
(d) Development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges.
(e) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW.
(f) The unit charge or schedule of industrial user charges and fees for the management of the wastewater discharged to the POTW.
(g) Requirements for installation and maintenance of inspection and sampling facilities and equipment.
(h) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit.
(i) A statement that the permittee shall indemnify the City against fines or other penalties imposed by regulatory authorities on the City for violations of the City's permit caused by fault of the permittee.
(j) Other conditions as deemed appropriate by the Manager to ensure compliance with this division, and State and Federal laws, rules, and regulations.
d. Permit modification.
1. The Manager may modify the wastewater discharge permit for cause including, but not limited to, the following:
(a) To incorporate any new or revised Federal, State, or Local pretreatment standards or requirements.
(b) To address significant alterations or additions to the industrial user's operations, processes, or wastewater volume or character since the time of wastewater discharge permit issuance.
(c) A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge.
(d) Information indicating that the permitted discharge poses a threat or hazard to the POTW, the health, safety, or welfare of any person, or the receiving waters.
(e) Violation of any terms or conditions of the wastewater discharge permit.
(f) Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting.
(g) Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13.
(h) To correct typographical or other errors in the wastewater discharge permit.
2. The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition.
e. Permit revocation.
1. Wastewater discharge permits may be revoked for the following reasons:
(a) Failure to notify the Manager of significant changes to the wastewater prior to the changed discharge.
(b) Failure to provide prior notification to the Manager of changed condition(s) pursuant to Section 19-77e.
(c) Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application.
(d) Falsifying self-monitoring reports.
(e) Tampering with monitoring equipment.
(f) Refusing to allow the Manager timely access to the facility premises and records.
(g) Failure to meet effluent limitations.
(h) Failure to pay fines.
(i) Failure to pay sewer charges.
(j) Failure to meet compliance schedules.
(k) Failure to complete a wastewater survey or the wastewater discharge permit application.
(l) Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this division.
2. Prior to having a wastewater discharge permit revoked, an industrial user shall be notified of the proposed revocation and be offered an opportunity to show cause under Section 19-81c. of this division why the proposed action should not be taken.
3. Wastewater discharge permits shall be voidable upon non-use or cessation of operations. Issuance of a new industrial wastewater discharge permit supersedes and replaces any previously issued permit for the same discharge.
f. Permit reissuance. Any permitted industrial user shall apply for wastewater discharge permit reissuance by submitting a completed wastewater discharge permit application in accordance with Section 19-75d. a minimum of ninety (90) days prior to the expiration of the industrial user's existing wastewater discharge permit. (Ord. No. O-96-4, 1-24-96) (Ord. No. 0-99-80, 10/20/99) (Ord. No. O-2008-64, 4-23-2008)
Source: City of Tyler, Texas, Code of Ordinances and Charter (American Legal Publishing, codelibrary.amlegal.com)URL: https://codelibrary.amlegal.com/codes/tyler/latest/tyler_tx/0-0-0-95212Fetched: 11/14/2026