§ 703.020 — Wireless communications facility siting permits
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 703.020
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/89bff663-052a-4043-9578-d12e0c9acfa5
Sec. 703.020. - Wireless communications facility siting permits.
(a) Applicability. This section provides the exclusive means of review for applications to site wireless communications facilities. (b) Classes. There are three classes of wireless communications facilities siting permits. (1) A Class 1 permit is a permit for a first priority siting. (2) A Class 2 permit is a permit for a second priority siting. (3) A Class 3 permit is a permit for a third priority siting or fourth priority siting. (c) Procedure type. (1) Class 1 permit. Review of an application for a Class 1 permit is a Type I procedure under SRC chapter 300. (2) Class 2 permit. Review of an application for a Class 2 permit is a Type II procedure under SRC chapter 300. (3) Class 3 permit. Review of an application for a Class 3 permit is a Type III procedure under SRC chapter 300. (d) Submittal requirements. (1) All applications. In addition to the submittal requirements under SRC chapter 300, an application for a Class 1, Class 2, or Class 3 permit shall include: (A) The location of the siting, according to the siting priorities set forth in 703.010(c), and, if the priority is other than the first priority, documentation establishing that placement at a higher-priority site is not feasible. (B) A site plan that includes: (i) Description of the proposed wireless communications facility's design and dimensions. (ii) Elevations showing all components of the wireless communications facility, and its connections to utilities. (C) Documentation demonstrating compliance with non-ionizing electromagnetic radiation emissions standards established by the Federal Communications Commission. (D) Documentation showing that the auxiliary support equipment will not produce sound levels in excess of standards contained in SRC chapter 93, or designs showing how the sound will be effectively muffled to meet those standards by means of baffling, barriers, or other suitable means. (E) Documentation that the proposed facility has been submitted to the State Historic Preservation Office for review, if applicable, or a statement explaining why the site is not subject to review by the State Historic Preservation Office. (2) Class 1 applications. In addition to the submittal requirements under subsection (d)(1) of this section, application for a Class 1 permit shall include: (A) An engineer's certification that the support structure, utility structure, or support tower will safely handle the load created by the attachment or collocation and comply with American National Standards Institute (ANSI) and other industry safety, structural codes and standards. (B) If the utility structure is on a local street, color radio frequency contour maps clearly showing the calculated coverage using the proposed antennas at the applicant's target signal level and the calculated coverage areas for all existing adjacent wireless communications facility sites of the owner to support the site selected for the proposed facility considering the siting priority established by SRC 703.010(c). If collocation or attachment on other utility structures was ruled out for non-radio frequency coverage reasons, the owner shall provide a statement identifying and justifying those reasons. (3) Class 2 applications. In addition to the submittal requirements under subsection (d)(1) of this section, application for a Class 2 permit shall include: (A) An engineer's certification that the replacement utility structure will safely handle the load created by the proposed antennas and comply with ANSI and other industry safety, structural codes and standards. (B) Documentation that the replacement utility structure is at least as wide as that required by any applicable safety standards adopted by the Oregon Public Utility Commission or the minimum necessary to accommodate attachment on the proposed replacement structure. (C) If the replacement utility structure is on a local street, color radio frequency contour maps clearly showing the calculated coverage using the proposed antennas at the applicant's target signal level and the calculated coverage areas for all existing adjacent wireless communications facility sites of the owner to support the site selected for the proposed facility considering the siting priority established by SRC 703.010(c). If collocation or attachment on other utility structures was ruled out for non-radio frequency coverage reasons, the owner shall provide a statement identifying and justifying those reasons. (D) Coverage maps or capacity documentation showing any gap in the provider's service and minimum height or configuration of the facility needed to fill the gap. (E) Color simulations of the wireless communications facility after construction. (4) Class 3 applications. In addition to the submittal requirements under subsection (d)(1) of this section, application for a Class 3 permit shall include: (A) An engineer's certification that the support tower will safely handle the load created by the proposed antennas and any future attached or collocated communications facilities and will comply with ANSI and other industry safety, structural codes and standards. (B) For new support towers, documentation from a radio frequency (RF) engineer or a licensed civil engineer that the necessary service cannot be provided by collocation on, or modification to, an existing support tower or support structure or utility structure, or by attachment on a replacement utility structure for one or more of the following reasons: (i) No existing support towers or support structures or utility structures are located within the geographic area where service will be provided; (ii) Existing support towers or support structures or utility structures or replacement utility structures would not be of sufficient height to provide the identified necessary service within the geographic area; (iii) Existing support towers or support structures or utility structures do not have sufficient structural strength to support the proposed antenna or antennas and related equipment and such support towers or support structures or utility structures cannot reasonably be improved or replaced to support the proposed antenna or antennas and related equipment; (iv) The proposed antenna or antennas would electromagnetically interfere with an antenna on an existing support tower or support structure or utility structure or a replacement utility structure and it is not feasible to effectively address such interference; (v) Other limiting engineering factors render existing support towers and support structures and utility structures and replacement utility structures not feasible. (C) An alternatives analysis for new support towers demonstrating compliance with the support tower siting requirements of SRC 703.030(c). (D) The number and type of antennas that the support tower is designed to accommodate. (E) A signed statement of compliance from the owner of the wireless communications facility that the owner will allow timely collocation by other users, provided all safety, structural, technological, and monetary requirements are met. (F) A visual study containing, at a minimum, color simulations showing the appearance of the proposed support tower, antennas, and auxiliary equipment from at least five view points within a one-mile radius. The view points shall be chosen by the owner, but shall include representative views from residential buildings, historic resources, or historic districts located within 250 feet of the proposed site. If the support tower must comply with the design standards in SRC 703.070(e), the graphic simulation shall include the proposed design. (G) Coverage maps or capacity documentation showing any gap in the provider's service and minimum height or configuration of the facility needed to fill the gap. (e) Criteria. A wireless communications facility siting permit shall be granted only if each of the following criteria is met: (1) For Class 1 applications. (A) The proposed collocation or attachment of an antenna or antenna array meets the standards in this chapter. (B) For collocation or attachment of an antenna or antenna array in the right-of-way, the proposed wireless communications facility cannot be located outside the right-of-way because there are no existing utility structures, support structures, or support towers located outside the right-of-way available to meet the service requirements of the wireless provider. (2) For Class 2 applications. (A) The proposed utility structure meets the standards in this chapter. (B) For replacement of a utility structure outside the right-of-way, the proposed wireless communications facility cannot practicably be located on an existing or modified structure outside the right-of-way. (C) For replacement of a utility structure outside the right-of-way, the approval will not cause an increase in the number of utility structures on the property or cause an enlargement or expansion of an existing utility structure on the property. (D) For replacement of a utility structure in the right-of-way, the proposed wireless communications facility cannot practicably be located on an existing structure inside or outside the right-of-way or on a modified or replacement structure outside the right-of-way. (E) For replacement of a utility structure in the right-of-way, the approval will not cause an increase in the number of utility structures in the right-of-way or cause an enlargement or expansion of an existing utility structure in the right-of-way. (3) For Class 3 applications. (A) The support tower conforms to the standards in this chapter, and the reasonably likely adverse impacts of the use on the immediate neighborhood can be minimized through the imposition of conditions relating to the location, size, design, and operating characteristics of the wireless communications facility. (B) The support tower will not be located in the right-of-way. (C) If the proposal is to construct a new support tower: (i) Collocation on existing wireless communications facilities within the cell service area of the proposed site is not feasible. (ii) Proposed location for the tower is the least intrusive means of filling a significant wireless communications service gap in coverage and/or capacity, including in-building coverage; and (iii) Prohibiting a new tower would prohibit or have the effect of prohibiting the provision of wireless communications services.
(Prior Code, § 703.020; Ord. No. 24-13)