§ 10-302 — Green building requirements for existing buildings

Denver Revised Municipal Code (Supp. No. 147, Update 3: codified through Ordinance No. 0852-26, enacted July 13, 2026) · Denver Revised Municipal Code § 10-302

Corpus is an independent public-information project, not the official City of Denver website. Stable reference: corpuslaw.us/code/8ac85c10-3bd4-4dc4-9950-b4b00e38d7f6

Sec. 10-302. - Green building requirements for existing buildings.

(a) In general. Except as provided in subsection 10-302(d) below, any owner of a building that has received a certificate of occupancy prior to November 2, 2018 and whose building contains twenty-five thousand (25,000) square feet or greater of gross floor area, must provide the following green building requirements upon a roof replacement for more than five (5) percent of either the total roof area or individual roof section(s), as applicable, in any calendar year: (1) A cool roof; and (2) One (1) of the following options: a. Green space covering an area in one (1) of the following amounts, whichever is least: 1. For total roof area replacement: two (2) percent of the gross floor area of the building; for individual roof section replacement: two (2) percent of the gross floor area of the building, multiplied by the area of individual roof section(s) being replaced, divided by the total roof area of the building; or 2. For total roof area replacement: eighteen (18) percent of the total roof area on the building; for individual roof section replacement: eighteen (18) percent of the individual roof section(s) being replaced. b. On-site solar panels located anywhere on the building or zone lot and covering an area in the least of the following: 1. For total roof area replacement: five (5) percent of the gross floor area of the building; for individual roof section replacement: five (5) percent of the gross floor area of the building, multiplied by the area of roof section(s) being replaced, divided by the total roof area of the building; 2. For total roof area replacement: forty-two (42) percent of the total roof area on the building; for individual roof section replacement: forty-two (42) percent of the individual roof section(s) being replaced; or 3. An area equal to an amount required to provide one hundred (100) percent of estimated annual average electricity used at the building. c. Building certification of LEED Silver, Enterprise Green Communities, the National Green Building Standard ICC/ASHRAE 700 Silver, Green Globes Three Green Globes rating, International Living Future Institute Living Building Challenge certification, International Living Future Institute Core Green Building certification, International Living Future Institute Zero Energy certification, International Living Future Institute Zero Carbon certification, Denver Green Code Enhanced Use Program compliance verification, or an equivalent certification approved by the building official. d. Enrollment in the energy program described in section 10-304 below. (b) Payment into the green building fund. (1) Instead of providing required green space, an owner may pay an amount to the green building fund, defined in division 3 below, of fifty dollars ($50.00) per square foot of all green space coverage required in subsection 10-302(a)(2)a, but not provided. (2) In cases where an owner chooses to provide green space as required in subsection 10-302(a)(2)a, but is unable to provide the entirety of green space coverage required, the owner may pay fifty dollars ($50.00) per square foot for no more than twenty-five (25) percent of the green space required, but not provided, and must provide at least seventy-five (75) percent of the required green space coverage. (3) In cases where an owner chooses to provide on-site solar panels as required in subsections 10-302(a)(2)b, but is unable to provide the entirety required on-site solar panel coverage, the owner may pay fifty dollar ($50.00) per square foot for no more than twenty-five (25) percent of the on-site solar panel coverage required, but not provided, and must provide at least seventy-five (75) percent of the required on-site solar panel coverage. (c) Individual roof section replacements. Any excess coverage requirements provided on an individual roof section replacement may be applied to later roof replacements of individual roof sections of the building. (d) Exceptions. (1) Subsection 10-302(a) shall not apply to the following: a. One- and two-family dwellings constructed under the provisions of the International Residential Code; b. Dwelling units constructed in a group of three (3) or more attached units in which each unit extends from foundation to roof and is not more than three (3) stories above grade plane; c. Temporary structures, air supported structures, and greenhouses; d. Buildings that have complied with section 10-301(a); or e. Ancillary roof construction affecting up to twenty (20) percent of the total roof area where the primary scope of work consists of building systems or components that create a secondary need for repair, replacement, or recover of an adjacent roof covering or system not otherwise in need of repair, replacement, or recover. (2) Subsection 10-302(a)(1) shall not apply to the following: a. Portions of a roof that include or are covered by the following: 1. Photovoltaic systems or components; 2. Solar-, air-, or water-heating systems or components; 3. Vegetated roofs; 4. Above-roof decks or walkways; or 5. HVAC systems and components, and other opaque objects mounted above the roof. b. Portions of a roof shaded during the peak sun angle on the summer solstice by neighboring buildings or other portions of the same building; c. Portions of a roof that are ballasted with a minimum stone ballast of fifteen (15) pounds per square foot, or, in the case of an existing ballasted roof, the weight of ballast for which the roof was originally designed; d. Twenty-five (25) percent of an individual roof section, when the remaining seventy-five (75) percent of the individual roof section contains a cool roof; e. An individual roof section containing less than twenty-five (25) percent of roofing materials; or f. Visible roofs for no more than ten (10) percent of the total roof area. (3) Subsection 10-302(a)(2) shall not apply to the following: a. Residential buildings five (5) stories or fewer, or less than sixty-two and one-half (62.5) feet in height and with twenty-five thousand (25,000) square feet or more of gross floor area; or b. A building that must replace its roof due to an emergency, including, but not limited to, fire or wind damage to be determined by the building official; or c. A building that contained a vegetative roof prior to January 1, 2018, so long as the vegetative roof is replaced upon any roof replacement. (e) Compliance with new building requirements. Any owner who submits a building permit for a roof replacement or construction including roof replacement, and has complied with subsection 10-301(a), does not have to comply with the requirements of section 10-302(a), but shall maintain compliance with the selected option from section 10-301(a)(2) or demonstrate compliance with another option from section 10-301(a)(2) upon completion of any roof replacement which must be submitted and approved by the building official. (f) Character defining roof. When a proposed or existing roof is determined to be a character defining roof, the building official may allow roof materials that do not meet the requirements for a cool roof. (g) Roof recover. Any owner proposing a roof recover of more than five (5) percent of either the total roof area or individual roof section in any calendar year, and whose building contains 25,000 square feet or greater of gross floor area must comply with section 10-302(a)(1) for that portion of roof being recovered, but need not comply with the requirements of section 10-302(a)(2). When an analysis of any individual roof section prior to a roof recover determines that application of a cool roof will result in condensation, then an owner may choose not to provide a cool roof. (h) Continuing compliance. An owner of a building subject to the requirements of section 10-302(a) must provide a cool roof and one (1) of the options of section 10-302(a)(2) for the duration of the building's existence.

(Ord. No. 1134-18, § 1, 10-29-18; Ord. No. 543-23, § 3, 6-5-23)

Ask a question about Denver law

Corpus searches the Denver sections it holds and shows the ones that match, with their citations. Free, no sign-in.