22.805.050 - Minimum requirements for parcel-based projects

A. Soil amendment. Retain and protect undisturbed soil in areas not being developed, and prior to completion of the project, amend all new, replaced, and disturbed topsoil (including construction lay-down areas) with organic matter to the extent required by and in compliance with the rules promulgated by the Director. B. On-site stormwater management. Parcel-based projects shall meet the minimum requirements for on-site stormwater management contained in Section 22.805.070, to the extent allowed by law, if: 1. For a project on a lot most recently created, adjusted, altered, or otherwise amended by a plat or other lawful document recorded with the King County Recorder on or after January 1, 2016, and where that document either created the lot or altered the size of the lot, either the total new plus replaced hard surface is 750 square feet or more or land disturbing activity is 7,000 square feet or more; or 2. For any other project, either the total new plus replaced hard surface is 1,500 square feet or more or the land disturbing activity is 7,000 square feet or more. C. Flow control. Parcel-based projects shall meet the minimum requirements for flow control contained in Section 22.805.080, to the extent allowed by law, as prescribed below. 1. Discharges to wetlands. Parcel-based projects discharging into a wetland, or to the drainage basin of a wetland, shall: a. Comply with Section 22.805.020 (Minimum requirements for all projects), including, but not limited to subsection 22.805.020.E (Protect wetlands). b. Comply with the minimum requirements for wetland protection contained in subsection 22.805.080.C (Wetland protection standards) if: 1) The total new plus replaced hard surface is 5,000 square feet or more; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture and from the project there is a surface discharge into a natural or constructed conveyance system from the site. 2. Discharges to listed creek basins. Parcel-based projects discharging into Blue Ridge Creek, Broadview Creek, Discovery Park Creek, Durham Creek, Frink Creek, Golden Gardens Creek, Kiwanis Ravine/Wolfe Creek, Licton Springs Creek, Madrona Park Creek, Mee-Kwa-Mooks Creek, Mount Baker Park Creek, Puget Creek, Riverview Creek, Schmitz Creek, Taylor Creek, or Washington Park Creek, or to the drainage basin of such creek, shall: a. Comply with subsection 22.805.080.D (Pre-developed forested standard) if the existing hard surface coverage is less than 35 percent and one or more of the following apply: 1) The project adds 5,000 square feet or more of new hard surface and the total new plus replaced hard surface is 10,000 square feet or more; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 4) The project adds 5,000 square feet or more of new hard surface and, through a combination of effective hard surfaces and converted pervious surfaces, causes a 0.15 cubic feet per second increase in the 100-year recurrence interval flow frequency as estimated using a continuous model approved by the Director. b. Comply with subsection 22.805.080.E (Pre-developed pasture standard) if the criteria in subsection 22.805.050.C.2.a do not apply and one or more apply: 1) The total new plus replaced hard surface is 5,000 square feet or more; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture, and from the project there is a surface discharge into a natural or constructed conveyance system from the site. 3. Discharges to non-listed creek basins. Parcel-based projects discharging into a creek not listed in subsection 22.805.050.C.2, or to the drainage basin of such creek, shall: a. Comply with subsection 22.805.080.D (Pre-developed forested standard) if the existing land cover is forested and one or more of the following apply: 1) The project adds 5,000 square feet or more of new hard surface and the total new plus replaced hard surface is 10,000 square feet or more; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 4) The project adds 5,000 square feet or more of new hard surface and, through a combination of effective hard surfaces and converted pervious surfaces, causes a 0.15 cubic feet per second increase in the 100-year recurrence interval flow frequency as estimated using a continuous model approved by the Director. b. Comply with subsection 22.805.080.E (Pre-developed pasture standard) if the criteria in subsection 22.805.050.C.3.a do not apply and one or more of the following apply: 1) The total new plus replaced hard surface is 5,000 square feet or more; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture, and from the project there is a surface discharge into a natural or constructed conveyance system from the site. 4. Discharges to small lake basins. Parcel-based projects discharging into Bitter Lake, Green Lake, or Haller Lake, or to the drainage basin of such lake, shall comply with subsection 22.805.080.G (Peak control standard) if the total new plus replaced hard surface is 5,000 square feet or more. 5. Discharges to public combined sewer. Unless the Director of SPU has determined that the public combined sewer has sufficient capacity to carry existing and anticipated loads, parcel-based projects discharging into the public combined sewer or its basin shall comply with subsection 22.805.080.G (Peak control standard) if the total new plus replaced hard surface is 5,000 square feet or more. 6. Discharges to a capacity-constrained system. In addition to applicable minimum requirements for flow control in subsection 22.805.050.C.1 through subsection 22.805.050.C.5, parcel-based projects discharging into a capacity-constrained system or its basin shall also comply with subsection 22.805.080.G (Peak control standard) if the total new plus replaced hard surface is 5,000 square feet or more unless the downstream system only includes ditches or culverts and the system has been determined to have sufficient capacity as specified in subsection 22.805.020.H (Ensure sufficient capacity). 7. Discharges from groundwater. In addition to applicable minimum requirements for flow control in subsection 22.805.050.C.1 through subsection 22.805.050.C.6, parcel-based projects that will permanently discharge groundwater to a public drainage system or to a public combined sewer shall also comply with subsection 22.805.080.G (Peak control standard) if the total new plus replaced hard surface is 2,000 square feet or more. D. Treatment. Parcel-based projects not discharging to the public combined sewer shall comply with the minimum requirements for treatment contained in Section 22.805.090 for flows from the total new plus replaced pollution-generating hard surface and the new plus replaced pollution-generating pervious surface, to the extent allowed by law, if: 1. The total new plus replaced pollution-generating hard surface is 5,000 square feet or more; or 2. The total new plus replaced pollution-generating pervious surfaces is 3/4 acres or more, and from which there is a surface discharge in a natural or constructed conveyance system from the site.

(Ord. 127444, § 5, 2026; Ord. 126336, § 4, 2021; Ord. 124872, § 38, 2015; Ord. 124758, § 2, 2015; Ord. 123105, § 3, 2009.)